Federal Ministry of Works (FMW)
... building the backbone for Development ...
Follow Us:
Welcome To Federal Ministry Of Works.
Minister Federal Ministry Of Works Engr. David Umahi.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Mar
24
2026

LATEST PRESS

UMAHI DECLARES AN END TO YEARS OF DEADLY TRAPS AND GRIDLOCK ON THE ENUGU–ONITSHA EXPRESSWAY, SETS MARCH 31 DEADLINE FOR REOPENING

The Honourable Minister of Works, Senator Engr. David Umahi, CON has declared that the long-troubled Enugu–Onitsha Expressway is fast shedding its grim past, as the Federal Government intensifies a sweeping infrastructure upgrade across the South-East under the President, His Excellency, Senator Bola Ahmed Tinubu, GCFR. 

Umahi made the declaration on Monday, March 23, 2026, during an inspection of ongoing projects in Enugu, including the Enugu–Onitsha Expressway and the Eke-Obinagu Flyover, where he expressed confidence that the era of consistent fatal accidents, endless traffic, and public frustration along the road is coming to an end.

“I’m going round the six geopolitical zones assessing what is possibly to be commissioned before May 29th by Mr President. There are mega project that the President will be available for before May 29th and we mean it,” the Minister said.

Once regarded as one of the most dangerous highways in the region, the Enugu–Onitsha road had for years been plagued by tanker explosions, loss of lives, and economic disruptions. But Umahi said decisive intervention by the Tinubu administration has changed the trajectory.

“Now this route, the Enugu-Onitsha expressway, you recall that when we came on board, everyday, people were talking about this road. There were a lot of tanker accidents, a lot of people died and so forth. But my joy is that the whole thing is a past story, because the President has swinged into action,” he stated.

The Minister disclosed that the dual carriageway, which spans 107 kilometres on each side, is undergoing a major structural shift, with a significant portion being converted from asphalt to concrete to ensure durability.

“It is not only that we are repairing this road… about half of it is going on to be concrete. I have no confidence in asphalt I continue to say it. By the time the asphalt fail we will have 50 percent of the road still intact and if it fails within the second tenure of the president then be rest assured that we will fix it,” he said.

He added that the same approach is being extended to sections in Anambra State, including the head bridge axis, where an initial asphalt design is being replaced with concrete pavement to align with modern highway standards.

“At the head Bridge we have 39k, we’re changing that to concrete so that we can have this coastal road type of road pavement there in Anambra and here in Enugu,”.

Beyond reconstruction, the project is also being enhanced with solar-powered street lighting and environmental features aimed at improving safety and sustainability.

“So that is going to happen but then not only that. We are putting solar light both for the one that was constructed before us and the one that is being done by us. Within the first one week we will have solar light up to this 1km and we continue we are also going to plant trees which is very important,” he added.

The Minister urged the people of the South-East to recognise the level of federal intervention in the region, noting that such attention to infrastructure was previously lacking.

“The people of South East have to be very grateful to Mr President. The reason is that we never had it like this. I was governor for 8 years and I can’t think of any Federal road project in Ebonyi State,” he said.

He also cautioned against divisive narratives, warning that some actors were misleading the public for selfish interests.

“I want to ask our people to be very very careful, there are people that pretend that they are helping us but they actually inciting us against government… we need to know when people are genuinely interested in our case,” he said.

Calling for sustained support for President Tinubu, Umahi described the ongoing works as part of a broader effort to correct past neglect and integrate the South-East more fully into national development.

“Let us allow this man that have started to right the wrong metted on us as the people of Southeast in the past. Let us allow him the next four years and we will be very much fully integrated,” he stated, adding, “To know the revolution that is going on in infrastructure… this is the Biafra we are looking for.”

As a major milestone, the Minister directed that the Enugu–Onitsha Expressway be reopened for public use on or before March 31. 

“I have given the controller the authority, by the 31st or before, he should call the press to open this road, call the people of South East… let them know that this road is open for travel and that will be our Easter celebration,”.

Addressing concerns over project costs, Umahi clarified that the Ministry of Works does not unilaterally determine project pricing, noting that approvals pass through multiple regulatory layers, including the Bureau of Public Procurement and the Federal Executive Council.

“I’m not the final authority when it comes to the cost of a project, there are layers of approval, the Bureau of Public Procurement, their own stands and not my own,” he explained.

He maintained that the standard being applied to the Enugu–Onitsha project is consistent with major road projects across the country.

“The same road architecture as the Lagos-Calabar coastal highway and the Sokoto-Badagry Super Highway… so no discrimination with the president, everybody is the same,” Umahi said.


 

Aug
14
2021

Jebba-Mokwa-Tegina Road Not Cut Off - FG The attention of the Federal Ministry of Works and Housing has been drawn to an online story over the weekend, stating that a bridge along Jeba -Mokwa road had collapsed resulting in total closure of the road " This is totally false as the recently constructed Talabu bridge along the road that was claimed to have collapsed is intact contrary to the online report"  Faulting the story, the motorists flying the Jeba-Mokwa road who were interviewed confirmed that the road has not been cut off anywhere, as their movement has not been affected in any way as claimed in the story  In view of this, the Permanent Secretary, Federal Ministry of Works and Housing, Babangida Hussaini, hereby assures motorists that the road is safe and passable, urging them to disregard the story and not to panic Mr. Babangida further reassured the public that the administration of President Muhammadu Buhari is working tirelessly to provide good roads for Nigerians, as such called on the citizens to give the government necessary support and encouragement He explained that the Ministry has Controllers of Works in every state that will quickly inform the Ministry of any emergency of such nature on our roads for immediate intervention. Mr. Babangida therefore appealed to Nigerians to verify stories received on social media before sharing such.   ...

Aug
03
2021

Fashola Inspects Federal Road Projects Executed By Yobe State Government ...Minister promises to submit his findings for consideration by FG The Minister of Works and Housing, Mr Babatunde Fashola, SAN, on Monday inspected the Nguru - Machina and Gashua - Yusufari, federal road projects that the Yobe State Government executed for which they are requesting reimbursement. While speaking to journalists during the inspection, the Minister said President Muhammadu Buhari promised that refund would be made to all states that intervened in Federal Roads though such interventions took place before the advent of this administration in 2015. He explained that some State Governments got their own refund in the first term of this administration while some others got theirs late last year. However, States like Yobe and Kebbi who were yet to get their own sent their requests to the Federal Government which led to the reconstitution of the Presidential Committee to assess the claims by the State Governments and submit their reports for consideration. Fashola said in response to a question on the possible amount being expected by the State, " You know that there are standard prices for materials and also standard design, we will file our report based on what we find, we have a method for making quantification and we will send it to the government Cost Control Centre and they will then advice government as to appropriate payment ". Speaking on the impact of the ongoing special repair of the heavily flooded area in Zangwon Kanwa on Nguru - Machina Road by the Federal Government, Fashola described the work as a relief measure for the Community because due to the excavation of some of the construction materials from the area, it was burrowed thereby turning it into a pond which has become the lowest point in the place, a situation that brought a lot of challenges to the people. He said the current work by the Government is a temporary measure which would be followed by a permanent solution that would be considered by both the State and Federal Government. The Secretary to Yobe State Government, Baba Mallam Wali expressed gratitude to the Honourable Minister for coming to assess the projects and hoped that he had seen quality work. Earlier, the Federal Controller of Works in Yobe State, Engineer Olusegun Babalola Akinmade informed the Minister that the repair work in the flooded area in Zangwon Kanwa on Nguru - Machina road will intensify after the raining season. He said the water in the pond will be rechannelled while the capacity will be increased downward by 2 metres just as it is done in residential houses when Septic Tanks are emptied. The Controller said the situation was so bad before work commenced in the area to the extent that some residents were evacuated. The Minister was received at the border between Jigawa and Yobe by the Federal Controller of Works in Yobe State, Engineer Olusegun Akinmade and a high-level delegation comprising the Speaker of the Yobe State House of Assembly, Rt. Hon. Ahmed Lawal Mirwa, the Secretary to the State Government, Alhaji Baba Mallam Wali, the Commissioner for Works, Engr. Umar Wakili and some traditional rulers. He was accompanied on the inspection tour by the Director Highways, Construction and Rehabilitation, Engr. Folorunsho Esan and the Director Highways, North East, Engr. Celestine Shausu among others.   ...

Aug
02
2021

Governor Bagudu Commends President Buhari For Completing Legacy Road Projects In The State The Excutive Governor of Kebbi State, Sen Abubakar Atiku Bagudu has commended President Mohammadu Buhari GCFR, for completing one of the legacy roads his administration inherited; the Sokoto-Tambuwa-Gwandu-Aliero-Jega-Yawuri-Kotongora road. The Governor said this over the weekend when the Honourable Minister of State for Works and Housing, Engr. Abubakar Aliyu, FNSE paid him a courtesy visit. He said: “The road is one of the most important roads, not only does it link other states with the Federal Capital Territory, but it is the main gateway to Lagos.” Continuing, he said: “I remember in 2015 when we came in before the completion of the road, whenever we were having security council meeting, it was a nightmare for the Emir of Yauri to come, but today, he even looks forward to coming for the meetings.” He commended the efforts of the Ministry that made it possible for Mr. President to complete the road saying that it was one of the numerous uncompleted roads that were inherited by the Buhari’s administration. Speaking on the importance of the road, the Commissioner of Works and Transportation, Alhaji Chika Ladan commended Mr. President also saying that it has saved the road users more travelling time. “Traveling from Yauri to Birnin Kebbi used to take about five hours traveling time, but today, it takes less than two hours on the same road,” he said. The Minister, who was in the state to verify the claims of refund on the Federal Government roads undertaken by the State Government, said that out of the total distance of road we have in the country, about 34,000 kilometres of the distance is under the jurisdiction of Federal Government. “Out of the 34,000 kilometres, we are currently working on over 13,000 kilometres simultaneously with over 800 contracts currently going on all over the country, covering all the Six Geo-Political Zones” he added. The long distance Sokoto-Tambuwa-Gwandu-Aliero-Jega-Yawuri-Kontogora road is divided into two sections. The Kebbi section of the road is about 171km with an origin at Jega township roundabout with a standard 7.3m carriageway. While the Sokoto section is about 133km with additional 8.0km Bye pass and it originated from Sokoto Airport roundabout through South West direction passing through Bodinga-Shagari-Tanbuwal, Aliero and terminates in Jega town at the Birnin Kebbi-Koko roundabout. The overall percentage completion of works to date is 100% in Sokoto section and 99.94% in Kebbi State section respectively.  Lane Marking in the Kebbi section is in progress. ...

First First First

LIVE ACTIVITY FEED

PUBLIC ANNOUNCEMENT


Nov
03
2025

  


PHOTO NEWS

Jun
02
2025

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

Click To View More Pictures

PHOTO NEWS

Apr
28
2025

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

Click To View More Pictures