Federal Ministry of Works (FMW)
... building the backbone for Development ...
Follow Us:
Welcome To Federal Ministry Of Works.
Minister Federal Ministry Of Works Engr. David Umahi.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Mar
20
2026

LATEST PRESS

EID MUBARAK TO OUR MUSLIM FAITHFULS 

I warmly felicitate with our Muslim brothers and sisters across Nigeria on the joyous occasion of Eid al-Fitr, which marks the successful completion of the holy month of Ramadan.

Eid is a time of deep reflection, gratitude, and renewed commitment to the values of sacrifice, discipline, compassion, and obedience to the will of Almighty Allah. The lessons of Ramadan call us to live in peace with one another, uphold justice, and extend kindness to all, especially the less privileged.

As we celebrate, I urge all Nigerians to continue to embrace unity, tolerance, and mutual respect, which remain essential to our collective progress as a nation. Let us also use this period to pray for the peace, stability, and sustained development of our dear country.

On our part at the Federal Ministry of Works, we remain committed to delivering critical infrastructure that connects our people, strengthens economic growth, and improves the quality of life for all Nigerians.

May Almighty Allah accept good prayers and acts of charity, and bless our nation with peace, prosperity, and good health.

Eid Mubarak.

Senator Engr. David Nweze Umahi, CON, FNSE, FNATE 
Honourable Minister of Work

 

May
05
2025

FEDERAL GOVERNMENT COMMENDS PROGRESS ON ABUJA-KADUNA ROAD, SECTION I, PHASE 1 The Honourable Minister of State for Works, Bello Muhammad Goronyo, Esq., expressed his satisfaction with the progress and quality of work on the Abuja-Kaduna-Kano Road (Zuba Section). He commended the contractor, Messrs Infiouest (Nig.) Limited for its professionalism and alignment with President Bola Ahmed Tinubu's Renewed Hope Agenda. During an inspection tour, the Minister announced that approximately six (6) kilometres-three (3) kilometres on each side had already been completed using reinforced rigid concrete pavement. “The quality of work delivered so far reflects the President’s unwavering commitment to national development through robust infrastructure,” he stated. He praised the dedication of the workforce and the use of modern equipment, saying, “The commitment of the workers is commendable. I salute their resilience and their support for Mr. President's vision. “The Minister emphasized that once completed, the road will reduce travel time, improve safety, curb insecurity, enhance trade, and create employment opportunities. Regarding the quality of construction materials, the Minister remarked, “What we are seeing here is superb. The reinforced rigid pavement is expected to last 50 to 100 years superior to conventional asphalt.” Mr. Robert Turner, the Project Manager and Representative of the construction company reaffirmed its commitment to delivering a world-class project. “There are no shortcuts. We are giving our very best to achieve the project’s goals,” he stated. Turner highlighted that the team operates daily from 6:00 a.m. to as late as 9:00 p.m., constrained only by security concerns along the corridor. “We have a spirited and dedicated team. Despite challenges, we are fully focused on delivering this critical project within record time,” he added. Earlier in his remarks, the Permanent Secretary of the Federal Ministry of Works, Engr. Olufunsho O. Adebiyi, emphasised the strategic importance of adopting rigid pavement technology, especially given Nigeria’s soil composition, water table level, and high axle loads. “Rigid pavement is new to Nigeria, but it has become necessary due to the consistent failure of flexible pavements under our local conditions,” he explained. He cited previous challenges with bitumen and cement interactions that compromise flexible pavements, particularly in high-traffic corridors like the Apapa-Oworonshoki Expressway in Lagos state. “This new method, reinforced with Y20 steel bars at 200mm centres, is stronger than most bridge decks,” he noted. Adding that “It is a sustainable solution that will outlast many of us and withstand the test of time.” Engr. Adebiyi urged road users to be patient during the construction period, assuring them that the phased opening of completed sections will help minimize disruptions. “We understand the temporary discomfort, but in the end, this road will significantly improve lives and the economy.” The Zuba section of the Abuja-Kaduna-Kano road remains a critical link in Nigeria’s transport network, and the Federal Government has reaffirmed its determination to ensure its successful and timely delivery. ...

Apr
15
2025

REVVING UP PROGRESS: HISTORIC FLAG-OFF OF LAGOS–CALABAR COASTAL HIGHWAY IN CROSS RIVER STATE The Honourable Minister of Works, His Excellency, Senator David Umahi Nweze, CON, FNSE, FNATE, on behalf of the Federal Government has officially launched Sections 3A & 3B of the Lagos–Calabar Coastal Highway in Cross River State on Monday, April 14th, 2025. The event which was held in Calabar, marks the beginning of a monumental infrastructure project aimed at connecting eight coastal states across Nigeria. In his speech, the Honourable Minister highlighted the project's groundbreaking nature, describing the Lagos–Calabar Coastal Highway as not just another road but a symbol of progress for Nigeria. Engr. Dr. Umahi reaffirmed the federal government’s commitment to completing the highway on schedule, with the project set to boost trade, tourism, and economic growth in the affected regions. He also reiterated President Bola Ahmed Tinubu's dedication to fulfilling his promises on infrastructure development.   Senator Umahi praised Hitech Construction Ltd. for their outstanding work and for their partnership in delivering this significant project that will benefit not only Calabar but the entire nation. Governor Prince Bassey Otu, representing President Bola Tinubu, GCFR, spoke passionately about the historical importance of the project. He expressed deep gratitude to the federal government for initiating such a transformative project in an area long deprived of modern infrastructure. Governor Otu emphasized that the completion of the road would improve connectivity and open up significant economic opportunities for Cross River State, fostering long-term growth and development.   Bello M. Goronyo, Esq. Honourable Minister of State for Works, who was also in attendance, spoke about the fulfillment of promises made during President Tinubu’s campaign, noting the critical infrastructure needs of underserved regions. He expressed gratitude for the continued support from local communities and emphasized the collaborative efforts between the federal and state governments in achieving national progress.   Mr. Danny Aboud of Hitech Construction Ltd., the project contractor, assured attendees of the company’s commitment to delivering a high-quality road. He discussed the use of innovative concrete pavement technology that will ensure the durability and longevity of the highway. Aboud also emphasized the significance of engaging local Labour and businesses, contributing to regional socio-economic development and job creation.   In his goodwill message, Engr. Pius Edet Ankpo, Commissioner for Works and Infrastructure in Cross River State, expressed sincere gratitude to the Federal Government for initiating the project. He praised President Bola Tinubu’s visionary leadership and acknowledged the historic nature of constructing a road through forested terrain. Ankpo also advocated for the reinitiation of other key federal road projects in the state, such as the Ikom–Odukpani Junction and Calabar–Itu road, which have faced delays. He urged the Federal Government to prioritize these projects to ensure ongoing development in Cross River State.   Mr. Asuquo Ukpanyang, the Youth Liaison Officer for the state, conveyed the excitement and anticipation of local communities regarding the project. He emphasized that it would not only create jobs but also drive economic participation, improving residents' standards of living. Ukpanyang stressed the importance of involving local populations to ensure the project’s success.   Prominent figures such as Prof. Eyo Etim Nyong, an Elder Statesman, and Senator Eteng Williams, representing Cross River Central, also delivered powerful goodwill messages. Both leaders expressed profound gratitude to the Federal Government and shared how the hopes of Cross Riverians are being renewed through this project. They pledged strong support for the initiative, recognizing its transformative potential for the region. Prof. Nyong commended the Federal Government’s commitment to lasting development in the South-South, while Senator Williams highlighted the project’s role in unlocking new trade and economic opportunities for Cross River State and neighboring regions.   Additional goodwill messages were delivered by Former Senator Ita Giwa and Hon. Gift Johnbull, SSA to the President on Committee Engagement. Senator Giwa praised the federal government for spearheading the Lagos–Calabar Coastal Highway, noting its potential to create new economic opportunities. Hon. Johnbull echoed these sentiments, emphasizing the broader importance of the project in line with President Tinubu’s ongoing commitment to nationwide infrastructure development.   Engr. Olufunsho Adebiyi, Permanent Secretary of the Ministry of Works, also addressed the audience. He expressed full confidence in the project’s success and reaffirmed the federal government’s commitment to ensuring the Lagos–Calabar Coastal Highway is completed to the highest standards, benefiting not only Cross River State but the entire nation. His remarks reinforced the Ministry of Works’ dedication to providing the necessary oversight and support for the project’s successful execution. The launch of Sections 3A & 3B of the Lagos–Calabar Coastal Highway signals a transformative infrastructure project that will greatly enhance the lives of Nigerians, particularly in the South-South region. With the combined efforts of the Federal Government, state authorities, contractors, and local communities, the successful completion of this critical initiative is assured. The project is set to be a key driver of Nigeria’s long-term economic growth, marking a significant milestone in the nation’s infrastructure development.   ...

Apr
06
2025

WORKS MINISTER, SEN UMAHI ASSESSES STRUCTURAL INTEGRITY OF THE UNDERWATER ELEMENTS OF BRIDGES THAT LINK LAGOS ISLAND TO MAINLAND -- Federal Controller of Works Lagos Absolved of Professional Negligence, Resumes Work as Investigation Reveals the Closure of Independence Bridge Lagos Was an Honest Mistake The Honourable Minister of Works, His Excellency, Sen Engr Nweze David Umahi CON has inspected the substructure and other underwater elements of  Third Mainland bridge, Eko bridge,  Carter bridge and Independence bridge to assess the structural integrity of some of the structures as well as appraise the progress  of work  on the bridge elements whose maintenance  has been generously commenced by the Renewed Hope administration of the President of the Federal Republic of Nigeria, His Excellency, Bola Ahmed Tinubu GCFR. In his press briefing after the inspection visit to the four bridges on 5th April 2025, the Honourable Minister of Works, expressed satisfaction with the quality and speed of underwater works done on the 3rd Mainland bridge and Carter bridge handled by Julius Berger Plc as well as Eko bridge and Independence bridge handled by Buildwell Nig Ltd. He commended the contractors for the milestone completion recorded by them but frowned at the continued tampering of the underwater piers and pile caps of the bridges by people despite warnings.  He made particular reference to the most recent case of a ship that capsized at Eko bridge waterway, hit and destroyed the underwater pier and pile cap of the bridge, thereby causing a big threat to the structure of the bridge. He also made mention of unlawful dredging going on in the waterways of 3rd Mainland bridge where the dredger destroyed the pile cap of the bridge.  "We have inspected the 3rd Mainland Bridge and Carter Bridge handled by Julius Berger to know what is happening below the deck, and we are satisfied with the work they're doing. I can say that the work on the 3rd Mainland Bridge is about 50 percent completed, and that of Carter Bridge is about 70 percent completed. We didn't visit Iddo Bridge because it's a small work, and it's not as dangerous as what is happening under the deck of Third Mainland Bridge and Carter Bridge. Part of Julius Berger's work is to reinstate the deflected slab in the 3rd Mainland bridge. We don't have deflection in Carter bridge and this is the reason why we closed the 3rd Mainland bridge against big trucks, and so they ( contractors) are insisting that they have a new design to tackle that because it's a very delicate work and they want our designers to go with them to Germany and look at the new design and then give approval, and so I've approved for that to  happen." Underscoring the importance of the underwater elements to the substructure of a bridge, the Honourable Minister explained, "The pile caps are like the legs to human beings. What the pile cap and the pies are to the bridges are what the legs are to human beings. So imagine a vehicle hitting one of your legs." Narrating what happened during his inspection to the bridge, he said, "And so I immediately directed divers to be deployed, and I went to the smaller boat to monitor the level of damages below the water, occasioned by this dredger that hit the pile. And I was very shocked. A whole one pile was totally removed. And what is holding that particular section is only the rods. So, some of the rods are removed. So it's like a whole leg of somebody is cut off."  He appealed to the Governor of Lagos State to consider the need to shut down the waterways between the Carter bridge and Eko bridge because of the risk occasioned by the impact of the capsized to underwater elements. "Let me appeal to the Governor of Lagos State to please enforce that the waterways between Carter Bridge and the Eko Bridge be closed because the dredger that hit the pile caps and the piles tumbled and they got sunk. So what is safe is for that section of the waterways to be closed down. And so I'm alerting all the authorities of the Navy, the Lagos State government, they have always been very proactive. This section of the waterway needs to be closed down immediately." He emphasized the danger of dredging sand along the bridge areas. He said, "The dredging of sand along seas and rivers is very dangerous because all the piles in Lagos State were executed through skin friction, which means that it is the sand that is holding the piles and holding the bridge. At the Third Mainland Bridge, we have installed a camera to observe what is going on top and also under the bridge. And so we're going to be looking at that for the bridges in Lagos even though it's quite a lot of cost. The Honourable Minister, who also visited the ongoing construction of Section I of Lagos-Calabar Coastal Highway project by Hitech Construction Company Ltd, was full of joy for the quality and level of work the contractor has attained. Speaking at Chainage 13, where shore protection was being considered to be done, he said the President's bold decision to invest on infrastructure at this time of economic challenges, shows his practical political will to transform economic limitations to possibilities. The Honourable Minister highlighted the great investment and tourism opportunities that would be generated upon the completion of sections of Lagos-Calabar Coastal Highway. He said, "And, of course, we also have foreign investment in this, because 70% of this project is dollar-based, on loan as low as 2.5% single digit interest. And so, what is the problem if I can recover this money in 10 years? We're going to have a relief station along the corridor where we will have supermarkets, small clinic, towing vans, parking lots for cars and trucks and so on and so forth. We are going to have trees all through the route and, of course, solar lights and CCTV cameras. So, it's going to be a sight to behold. I want Nigerians to be very clear that the President is replicating what you see in the Western world, and people are saying don't do it." He urged Nigerians to keep faith with the vision underpinning the Renewed Hope agenda on road development, noting that where an individual's land is affected by the ongoing road infrastructure revolution, it is for the overriding public interest. He described as misleading and fictitious, the claim by one Mrs Ifeoma that she invested over $215m on her land on the right of way  at Chainage 18 of Lagos-Calabar Coastal Highway and urged those darkening counsel without knowledge to visit the location and see that no single structure was built there except a gate which has been removed to give way for construction work.  Meanwhile, the Honourable Minister of Works has absolved the Federal Controller of Works, Engr. Olukorede Keisha of any negligence in her duty, noting that the findings of the Federal Ministry of Works revealed that the error in the procedure for the closing of Independence bridge, Lagos that caused the regrettable grid lock was an honest mistake, but with an intention to save lives. He has directed the Federal Controller of Works to resume work with immediate effect.   ...

First First First

LIVE ACTIVITY FEED

PUBLIC ANNOUNCEMENT


Nov
03
2025

  


OTHER NEWS

Mar
22
2022

FG Committed To Development Of Quality Education Through Quality Infrastructure - Fashola

..... 1.06 km internal roads with reinforced concrete culverts and drains handed to AKTH

.... CMD lauds Buhari for the intervention
 
Minister of Works and Housing, Babatunde Raji Fashola SAN, has said that the Federal Government will remain committed to the development of Education in the county through the provision of quality infrastructure.

The Minister spoke in Kano while handing over 1.06 km internal road, including construction of reinforced concrete culverts and drains at the Aminu Kano Teaching Hospital, Kano (AKTH), Tuesday, March 22, 2022.

Fashola was represented by the Federal Controller of Works in Kano State Engr. Yahaya Baba Ali.

He said " it is undebatable that the quality of education will be impacted by the quality of infrastructure and the learning environment and those who doubt it should simply listen to some of the feedback from students in the schools where this type of intervention has taken place".

The Minister stated further that President Buhari's administration has successfully intervened in the internal Road networks of 46 Tertiary Federal institutions and handed over 29 as at 2021.

Accordingly, he said that another 17 tertiary institutions Internal roads are now ready to be handed over, while work is ongoing on 30 roads in similar institutions across the country making a total of 76.

Earlier, in his welcome address the Chief Medical Director AKTH Prof. Abdulrahaman Abba Sheshe expressed happiness an important project of this magnitude has been executed in the teaching hospital, pointing out that it will allow easy access for patients seeking medical treatment in different parts of the hospital.

" We are indeed very happy that the Federal Government under President Muhammadu Buhari through the Federal Ministry of Works realized the importance of this project which was carried out through special Intervention, the result is what we are seeing all around the hospital today" he said.

In his remarks, the Chairman Board of Directors, AKTH, represented by Dr. Dahiru M.D Shehu said he is hopeful that the present administration will continue to bring in more projects to the hospital.

" I thank Pesident Muhammadu Buhari, the Minister of Works and Housing Babatunde Raji Fashola for the road which will help in the development of the Health Sector in the country" he said.

He also commended the administration of President Muhammadu Buhari for the support given to the hospital in terms of improvement of the health care system in the country.

In an interview, the Principal Iman Academy AKTH Mallam Zakariya'u Muhammad thanked President Buhari and the Minister of Works and Housing for the internal road.

He said " this has brought relief to the people. Before the intervention visitors to this hospital suffer from dust due to the bad road and during raining season patients and pupils finds it difficult to access the road".

The ward head in the Hospital, Alhaji Sulaiman Shehu, expressed his happiness for the intervention and thanked the government for removing the pains of the people while using the road, saying that they can now move freely on the road.

SPEECHES

Apr
01
2022

President Muhammadu Buhari’s Acceptance Speech Of The 2021 Trophee Babacar Ndiaye

Ladies and Gentlemen,

This is an auspicious African day, in the capital city of Africa’s most populous nation.

It is an African day of Pride, where the story of Africa’s long-awaited Renaissance begins to unfold inside her largest country by population and GDP.

It is a day of Pride for the African Union and Her Dreams for the continent.  The policies and programmes that have been inaugurated over the years are beginning to bear fruits and results.

The Trans African Highway programme, launched in 1971 sought to connect the whole of African through a major system of Nine (9) highways, the TAH1 to the TAH9 covering an aggregate distance of 56,683km.

The African Development Bank, a financial institution set up to support the African Countries in their developmental objectives.

The African Continental Free Trade Area Agreement set up to create a unified, borderless market of over one billion people to facilitate intra-African Trade.

I am delighted to report that Nigeria is playing her membership and leadership role in all of these institutions and in the pursuit of achieving their objectives.

Only a few days ago in the city of Lagos, our private sector opened a 3,000 metric tonne granular Fertilizer Company to support Farmers and Agriculturalists on the African continent and beyond.

Our collaboration with the African Development Bank has been productive and results are now manifest in projects like the Mfum-Bamenda Bridge that connects Nigeria and the Republic of Cameroon.   I also acknowledge the support of the Bank in financing Feasibilities, Consultancies and Pre-construction work on the Lagos-Abidjan Corridor comprising Nigeria, the Republic of Benin, Togo, Ghana and Cote d’Ivoire which is part of Trans African Highway No. 7 from Dakar in Senegal to Lagos in Nigeria.

I am happy to report that the Nigerian sections of this highway is now under construction on the Lagos-Badagry corridor through our local financing institution such as the Tax Credit Scheme introduced by Executive Order No. 7; and in collaboration with the Lagos State Government.

I am able to report that apart from Trans African Highway No. 7, Nigeria is also connected by Trans African Highways No. 2, Algiers to Lagos and Trans African Highway No. 8, Lagos – Mombasa.

The East to West crossing of Nigeria across the Second River Niger Bridge which will be finished this year is a major investment by Nigeria on the Lagos-Mombasa Trans African Highway, as is the Enugu – Abakaliki to Mfum Highway.

The 375Km Abuja to Kano that is now under construction is Nigeria’s major part of the Trans African Highway No. 2; Algiers to Lagos.

Apart from these Trans African connections, we are rebuilding, expanding or replacing strategic Highways and Bridges across our country.

The Apapa-Oworonshoki Highway in Lagos is strategic for trade and business facilitation to support our busiest and largest Sea Port in Apapa and Tin Can Island.

The Suleja-Minna Highway is critical to our petroleum distribution network and access to strategic petroleum products Depot in Niger State; and it is receiving attention, while the Calabar-Itu-Odukpani unlocks access to agricultural produce and supports mining and extractive activities for construction, in the South South and South East of Nigeria.

Ladies and Gentlemen, these are only examples of over 13,000Km of Road and Bridge construction, expansion and rehabilitation nationwide.

They have been a major boost for the growth of our economy, keeping people at work; driving a supply value chain, stimulating productivity at Quarries, Cement Factories, Steel Factories, and the Petroleum sectors for lubricants, fuel and bitumen.

Our most recent GDP results of 3.40%, the biggest in the last 7 years clearly show that the construction sub-sectors and related sub-sectors of the economy were among the big performers of the growth surge.

Very evidently, infrastructure investment is good for the economy.

By building Roads, we are building Economies.

The founding vision of African Leaders is coming to fruition, Evidence of the African Renaissance is being showed today in Nigeria.

The Trophee Babacar Ndiaye 2022 at the 7th Edition of Africa Road Builders symbolizes this Renaissance.

On behalf of the Federal Republic of Nigeria, I accept the Africa Road Builders Award for the Hope, Prosperity and Progress that it symbolizes.

State House
Abuja

 

PHOTO NEWS

Jun
02
2025

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

Click To View More Pictures

PHOTO NEWS

Apr
28
2025

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

Click To View More Pictures