UMAHI RAISES ALARM OVER MISUSE OF ROADS, WARNS AGAINST PARKING OF TANKS, OTHER HEAVY-DUTY VEHICLES -As young engineers set to understudy the project under the President’s mentorship program The Honourable Minister of Works, Senator Engr. David Umahi, CON has raised serious concern over the damaging practice of parking fuel tankers and other heavy-duty vehicles on newly constructed roads, warning that such actions pose direct threat to the durability and lifespan of critical national infrastructure. The Minister made this known during an inspection of the Aleto Bridge project, Rivers State on Saturday, March 21, 2026. “Yesterday I was passing through this road, the entire road we have completed was totally blocked… not by moving vehicles but fuel tankers, they parked on the road.” He emphasized that no road infrastructure is designed to withstand prolonged static loading from heavy vehicles. “No road project anywhere in the world is designed for static loads, they will destroy the road.” With the total project cost exceeding ₦230 billion ₦156 billion for phase one and ₦83 billion for phase two the Minister stressed that such investments must be protected. “Is that what we should fold our hands and allow it to be destroyed?” The Minister expressed satisfaction with the pace and quality of work being delivered by the contractor, RCC, while also commending President Bola Ahmed Tinubu GCFR for his decisive intervention in sustaining the project. “I want to thank RCC very highly and commend Mr President for his heart of love toward the Niger Delta,” the Minister stated. He explained that although funding by the Nigerian National Petroleum Company Limited ceased in August 2025, the President promptly approved an alternative funding mechanism, ensuring that work continued uninterrupted. “We are not owing RCC on this project… it is a very, very highly skilled and technical project and I’m very happy with the quality of work.” The Minister described the Aleto Bridge Project as a landmark engineering effort, incorporating modern concrete pavement technology, solar-powered lighting, environmental landscaping, and reinforced structural features. In line with the Federal Government’s commitment to human capital development, the Minister disclosed plans to integrate young Nigerian engineers into the project through a mentorship programme championed by President Tinubu. “We are making efforts on President Tinubu mentorship programme where young engineers will come and study what we’re doing here. They are our future leaders and it is a technical project to behold.” Providing an update on timelines, the Minister noted that one carriageway of the project is expected to be completed before May 25, 2026, with the first phase projected for full completion by August 2026. “They have promised me that before May 25th that one carriageway of this very innovative construction will be completed and before August the first phase of this project would have been totally completed.” He further expressed confidence that the second phase, which includes multiple flyovers and bridges, will be delivered within the year. The Minister also highlighted the strategic redesign of the project from asphalt to concrete pavement, a decision directed by the President to ensure long-term durability. “We inherited this project from zero ground. It was the President that directed that we should redesign using concrete and then you can see the result.” The Honourable Minister concluded by calling on Nigerians, particularly road users and transport operators, to take collective responsibility in safeguarding public infrastructure. “Let us protect our own. The minister cannot be here and everywhere. The road is being done and it’s been perfectly done but we have a duty to protect it.”
Road Infrastructure Revolution Nationwide has Started, Courtesy of the Renewed Hope Administration of Mr President. Read to Know Your Role 1. The attention of the Federal Ministry of Works has been drawn to the concerns of the public on the deplorable situations of some sections of the Federal roads throughout the Federation as reported in many media platforms, especially social media, the front page, pages 4,5,6 and 14 of the publication of Sun Newspaper of 26th November, 2023. Most of the sections of the roads frequently reported but definitely not exhaustive are: the Makurdi-Nsukka 9th Mile Road, East West Road, Lagos-Abeokuta Expressway, Benin bypass road, collapsed bridges of Enugu- Port Harcourt road, collapsed bridges of Shandam-Plateau State, Abuja-Kaduna- Zaria-Kano road and Gombe- Bauchi etc. 2. The President of the Federal Republic of Nigeria, His Excellency, Senator Asiwaju Bola Ahmed Tinubu, GCFR is aware of the state of our road infrastructure which he inherited on the 29th day of May 2023. Without prejudice to all the good efforts of the past administration on road infrastructure development which they tackled within the limit of their resources, the work to be done to change the ugly state of our roads is quite enormous. 3. Mr. President is not complaining of the challenges he inherited in nearly all sectors of the economy, especially as it concerns our road infrastructure, but he is quite courageous as he had promised to tackle the problems head-on which he has started to do not minding the debt burden inherited especially the funding gap of over Six Trillion Naira (₦6T) from most of the inherited on-going road projects. 4. Mr. President has since reeled out plans of commitment, consistence, and innovations towards actualizing a sustainable road infrastructure development throughout the country. He has just approved a 2023 Supplementary budget of Three Hundred Billion Naira (₦300B) for the Ministry of Works comprising of One Hundred Billion Naira (₦100B) for immediate palliative works in 36 States and FCT and Two Hundred Billion Naira (₦200B) for continuation of most of the inherited ongoing projects and very few new but critical road projects. 5. Mr. President has directed that works in those palliative projects must commence before 1st December 2023, while observing all due process. On the sections being frequently complained of by the public in all regions of the North and South of the country, Mr. President has equally isolated them and directed immediate actions on them and indeed work has started on all such roads. The public can crosscheck our claims and report back to us. 6. The engagements of the Federal Ministry of Works will not be limited to these isolated reported cases but shall be holistic in our approach through these approved palliative measures and the interventions of FERMA in all the 36 States and FCT also. 7. The public is hereby requested to assist the Federal Ministry of Works and FERMA by supervising the contractors that will be engaged in these palliative works and indeed all ongoing projects of the Federal Ministry of Works and FERMA. It is the right of every Nigerian to have value for their money deployed to the road infrastructure sector and therefore must show both interest and passion in all the ongoing projects by the Federal Ministry of Works and FERMA, and indeed all projects of the Federal, State and Local governments. All poorly constructed roads should be photographed and reported immediately to the following contacts: 08030986263, 08037086137, or 08106423197; showing the name of the contractor, the location and type of contract and defects observed. The Federal Ministry of Works will document such reports, verify and take effective action to correct such infractions. The Federal Ministry of Works shall also periodically recognize publicly those who made such reports that are genuine in a public engagement forum to be hosted quarterly by the Federal Ministry of Works and will sanction such erring contractors publicly too. 8. THE USE OF ASPHALT AND CONCRETE PAVEMENT IN ROAD INFRASTRUCTURE DEVELOPMENT a. The Federal Ministry of Works is shocked to observe the various acts of darkening counsel without knowledge on the position of the Ministry on the use of asphalt and concrete pavement in the development of our road infrastructure by people who have vowed not to release their hands off the brake of our road infrastructure development just for their selfish gains. b. The Federal Ministry of Works has at no time banned the use of asphalt or directed that concrete pavement shall be the only means of road pavement structure. For the avoidance of doubt, the new policy of the Federal Ministry of Works is simply put as follows: i. contractors for all the ongoing projects are simply requested to have a choice to continue to use asphalt or have their projects redesigned on concrete at no extra cost to government following the underlisted conditions: ii. Use of asphalt: contractors shall stick to only 5% Variation on Price (VOP) in line with the signed contract agreement throughout the period of the project and the signed contract shall not be subject to review especially on bituminous items. iii. The thickness of the asphalt pavement as designed must be strictly adhered to by all such contractors and the design shelf life for the asphalt (at least 15 years) shall be guaranteed by issuing an insurance bond through a reputable insurance company in favour of the Federal Government. This is in line with Article 2 of the signed contract and clause 51 of the general conditions of contract (which is part of the documents forming the signed contract with contractors which authorize the client through the Engineer to change the scope of the work, the quantity of the work, the quality of the work as the client may deem fit at any time etc.) for all the ongoing projects. These directives to the contractors do not in any way violate the Federal Ministry of Works' signed agreement with the contractors. iv. For the use of concrete, contractors must abide by the 5% VOP and 50 years design shelf life using concrete grade 40. c. Those who are complaining and demarketing this policy are simply those who do not wish Nigeria well and they are the same people that use adulterated bitumen in their projects while putting pressure on our Naira through the importation of adulterated bitumen instead of developing our abundant God given bitumen deposits in Ogun State and other parts of Nigeria. Insofar as this new policy has not violated any law, the Federal Ministry of Works is forging ahead with this new policy. As at today, most of the ongoing projects are still ongoing with asphalt pavement in line with this new policy while some are redesigned on concrete pavement, depending on the terrain and with full understanding of the affected contractors of those projects. 9. The Federal Ministry of Works is very concerned with the supervision of our projects and effective 1st of December 2023, there will be a revolution in the ways and methods the Federal Ministry of Works supervises her projects nationwide. All concerned are HEREBY put on NOTICE as the Ministry will not spare anyone found culpable in his or her assignment. 10. The Director of Works of the 36 States and FCT and FERMA have been directed to audit all projects in their States and FCT especially equipment on and off sites with their pictures, personnel of contractors, status of all projects including financial status (contract sum, date of award, period of construction and time table, amount paid, challenges, % of work completion, augmentation of project if any, VOP claims etc). This assignment must be completed before 30th November 2023. Note that this directive was given since the past two months. 11. The Federal Ministry of Works wishes to thank Mr. President for his directive that all inherited projects from the past administration be continued while he makes frantic efforts to source for funds for the completion of these ongoing projects and the critical new ones within his 1st 4 years of his Divine 8 years of purposeful and fruitful divine administration through the power of God who divinely brought him to leadership at this critical moment of our Nation’s history. 12. On the part of the staff of the Federal Ministry of Works, I pledge to strictly and Godly follow the divine Renewed Hope Agenda of Mr. President, and God willing, we shall continue to support Mr. President and deepen the good efforts of Mr. President in all our road infrastructure development. Signed: H. E. Sen. (Engr.) Nweze David Umahi, CON, FNSE, FNATE Hon. Minister. ...
FG is Committed to the Engineering Values in Road Infrastructure Development as Supervision Occupies a Centre Stage in the New Policy of the Federal Ministry of Works The Federal Government under President Asiwaju Bola Ahmed Tinubu, GCFR is committed to outstanding quality, value for money, innovation, responsiveness, fast deliveries and technical expertise in road infrastructure development in Nigeria. This was contained in the message of the Hon. Minister of Works, Sen. Engr. Nweze David Umahi, CON when the national leadership of Nigerian Society of Engineers (NSE) led by its President, Engr. Tasiu Sa'ad Gidari Wudil paid him a courtesy call in his office in Abuja on 23rd November, 2023. The Hon. Minister emphasized the importance attached to quality delivery of construction works by the Renewed Hope administration of Mr. President stressing that the 'business as usual' syndrome in road construction is no longer tenable under the Renewed Hope administration of Mr. President. He reeled out the new policies on road infrastructure to include: • good stabilized and tested subgrade, sub-base course before pavement placement. • expose subgrade, sub-base and base course to 60 days vehicular movement and continuous sheep-foot rolling before pavement placement. • introduction of reinforced concrete road pavement in most roads’ carriageway and shoulders. • continuous maintenance of all roads under construction throughout the life of the project under contract. • effective design of road infrastructure anchored on detailed report of environmental site conditions and geotechnical report. • community relations in terms of keeping roads motorable under the period of the contract. He said that supervision was necessary in the actualization of quality delivery of road construction whether concrete pavement or asphalt, noting that each of the two models has its own attendant conditions. “When you start to compare asphalt and concrete, it is if all things are equal, here all things are not equal, there are many factors why we are talking about concrete”. He noted that the stand of the Ministry is not about comparing asphalt and concrete pavement but that if you are using either of them, there are conditions attached to them. He said there are certain terrains on our roads that make it imperative for concrete pavement to be used." You cannot put asphalt in water but you can put concrete in water”. The Minister explained that the rate of increase in the cost of materials for construction of the two models is alarming and argued that the cost of materials for asphalt is in geometric progression while the cost of materials for concrete pavement is in arithmetic progression. He reiterated that prudence and value for money are the watchwords of the Ministry of Works under him, and this involves getting materials at the minimum purchase price and maximum efficiency and effectiveness of the product. He urged the leadership of Nigerian Society of Engineers to consider retraining of members of the society and enforcement of discipline and strict standards of ethics in the practice of Engineering in Nigeria in the interest of public safety and for the protection of the economic investments. " I went to China, and I saw their roads, there was no evidence of any maintenance in nearly 30 years. And I asked them what the reason is, and they said that if you build a road in China and within your lifetime, the road fails, they will come for test and if there is any evidence of compromise, the person responsible goes to prison for life". The Hon. Minister offered partnership with the NSE in the area of supervision and consultancy. In his mission statement earlier, the President of Nigerian Society of Engineers ( NSE) said the aim of the courtesy call was to seek areas of collaboration with their own and described the Hon. Minister as a round beg in a round hole "Since after your assumption of office, we have been monitoring your progress, and I must tell you we are not surprised, what you did as Governor in Ebonyi State is amazing. We visited you when you were the Governor of Ebonyi State, and I am going to visit your Governor now. I must go because it is like a pilgrimage.... In fact, Your Excellency, we are proud of you." The President said that the Society which is an umbrella organization for Engineering profession in Nigeria is committed to best Engineering practices. He enumerated the achievements of the Society and the prospects of their smart office project, and expressed hope that it would be an innovation hub of the nation. ...
Asphalt Pavement and Concrete Pavement not Compared - Umahi. .....We will Partner with NSE The Minister of Works, Sen. Nweze David Umahi has reiterated the stand of the Ministry on the use of either asphalt or concrete on the construction of federal roads across the nation saying that each one has conditions attached to its usage. He made this assertion when the President of the Nigeria Society of Engineer, Engr. Tasiu Sa’ad Gidari Wudil paid him a courtesy visit in his office in Abuja. Umahi stated that there are many factors why the issue of concrete technology came up and it’s only because all things are not equal and can only be understood by professionals and not by people who have no knowledge about it. “When you start to compare Asphalt and Concrete, it is as if all things are equal, here all things are not equal, because there are many factors why we are emphasizing about the use of concrete, nevertheless, people speak about a profession they have no knowledge about” He said. He noted that the stand of the Ministry is not about comparing asphalt pavement and concrete pavement but that if you are using either of them, there are certain conditions according to the terrains in different states that will require our roads being built with concrete as well as that concrete must be used as pavement. “We are not just comparing asphalt and concrete, no, that is not what we are doing, first of all, for the use of asphalt, these are the conditions, also for the use of concrete, these are the conditions, but there are certain terrain in states that we stressed must use concrete, we cannot change that. You cannot put asphalt in water, but you can put concrete into water” he said. The Minister explained that the rate at which the prices of these two products fluctuates is alarming and that increment in asphalt is Geometric while that of concrete is in Arithmetic progression noting that the FG is the one funding these huge projects and must tread with caution taking into consideration the budgetary allocation of the Ministry of Works. Umahi expressed his worries saying that the greatest challenge experienced in road construction is the problem of supervision caused by lack of commitment by not putting professional ethics over and above chasing of money but that the Ministry is committed to providing adequate supervision to all road constructions across the 36 states and the FCT. "If we are committed to public things, God will give you new ideas, if you are not committed to public things, you will not get new ideas “he said. The Minister declared that the Ministry will partner with the Nigeria Society of Engineers in the supervision of all road projects across the country and encouraged NSE to improve on the professionalism by opening a training school, both in the North and in the South one each, while he pledged his support. “We are going to partner with NSE in the supervision of all road projects and will also emphasis the need for retraining schools across states. Engineering is wide, if you are a professional engineer, you will not have problem with professional ethics” he said. Umahi maintained that the first job of Nigeria Society of Engineer is to bring discipline among members by setting standard for membership in the sense that if any action against the profession is committed, one can be disrobed noting that everyone cannot be an engineer. “The first job of NSE is to bring discipline, you have to bring us under your leadership so if you hear that a member has committed fraud, you can disrobe him, and it is not everyone that will answer the name -Engineer” he said. ...
Quality Engineering Education Ensures Delivery of World Class Infrastructure – Engr Aliyu
Minister of State for Works and Housing, Engr Abubakar Aliyu has stated that focus on quality engineering education will ensure the delivery of world class infrastructure in order to better the lives of citizens
The Minister was speaking as a Special Guest of Honour at the 18th International Conference and Annual General Meeting, (AGM) , of the Nigerian Institution of Civil Engineers (NICE), which was held in Abuja, with the theme “ Reform of Engineering Education: A Strategy for Sustainable Development in Nigeria.
In his reaction to the theme of the Conference, he said “… it is only fair that we focus on quality engineering education in order to ensure the delivery of world class infrastructure to better the lives of our citizens”
Engr. Aliyu also explained that, it is only through a better adoption and adaption of Engineering that we can share in the good life that it offers in other climes, and this he said can solely be achieved through quality Engineering education
Accordingly, the Minister noted that Sub-Saharan Africa seriously lacks engineering capacity and relies heavily on imported expertise, which he said was attributable to insufficient output from training institutions, poor- quality education, and lack of practical experience among graduates.
He said that according to UNESCO landmark report on Issues, Challenges, and Development Opportunities, Nigeria produces 3,500 engineers a year, a modest number relative to its population, but suffers significant unemployment among them because of the lack of the requisite training.
However, the Minister assured the delegates that the administration of President Muhammadu Buhari, in line with its change mantra, is committed to development of the engineering profession considering its critical role in bringing about sustained economic growth.
He added that this administration has heavily invested on Research and Development generally and particularly on engineering education, however only modest achievement was made due to challenges that are huge but not insurmountable.
He also pointed out that synergy and harmonization of programmes, cooperation and collaboration can link Nigerian engineers’ consultancy services to global practices and marketing frameworks
Earlier, in a welcome address, the National Chairman of the Nigerian Institution of Civil Engineers (NICE), Engineer, Mrs Aishatu Aliyu Umar stated that the annual Conference which is the second in her tenure is exceptional to Civil engineers who gathered from different sectors of the economy to deliberate on the sustainable ways to enhance the profession.
She added that the conference is also an opportunity for the engineers to individually analyse their performance, asses impact and restrategise on ways to practice the profession for sustainable development of the nation
Engineer Umar described the 2020 theme as well thought out considering the fact that the World is being reshaped for better technological advancement and Nigeria cannot continue to be left behind.
While delivering an opening address, the President of the Nigerian Society of Engineers, (NSE), who was also the Chairman of the occasion, Engineer Babagana Muhammed described the annual conference and AGM as a gathering of professional engineers for the advancement of engineering practice in Nigeria in line with the global best practice.
Engineer Muhammed urged engineers to talk to stakeholders in their respective states on the water bill so as to give it the necessary support that will be in the interest of the people. He charged Nigerians who have the wherewithal to give back to society especially those that enjoyed free education.
Among the dignitaries that graced the occasion were: Engineer Umaru Bago Tafida, the Emir of Lapai and Royal Father of the day, Engineer Alimasuya Rabiu, President of COREN, Michael Jiang Yigao, Chairman/MD CCECC, Engineer Chris Okoye, Chairman/Principal Consultant CCGE Ltd
Speech by the Honourable Minister Mr. Babatunde Raji Fashola san during the Commissionning of 100MVA, 132/33kv Transformer at Katampe Substation on February 12, 2018
Protocol
Transmission Company of Nigeria (TCN) is responsible for conveying electricity from the Generation Companies (GenCos) who produce at power stations in various locations to over seven hundred trading points where the Distribution Companies (DisCos) receive it and distribute it to consumers nationwide. The GenCos can now produce 7,000 MW, with more capacity coming. This Administration’s focus on delivering Incremental Power requires that TCN build and maintain the capacity and operational flexibility to transmit more than the GenCos can produce, to ensure stable and reliable power delivery to the DisCos and other customers connected directly to the National Grid.
As part of the program, another milestone has been achieved here in the capital city of Abuja with the installation of additional 1x100MVA Transformer at Katampe and another of the same capacity at Apo. The capacity of the Katampe 132/33kV substation, prior to this installation, was 120MVA. Therefore, with this installation, the capacity has been raised to 220MVA. Similarly, the Apo 132/33kV substation has been raised from 190MVA to 290MWA.
The two transformer projects, executed by Messrs. MBH Power Limited, are part of the Nigeria Electricity and Gas Improvement Projects (NEGIP) financed by the World Bank.
With the commissioning of the two 100MVA, 132/33kV Transformers, the communities listed below are expected to experience remarkable improvement in power supply. Gwarinpa, Life Camp, Jabi, Kado, Wuye, Maitama, Mpape, Katempe 1 and II, Jahi, Mabushi Garki, Gudu, Guzape, Asokoro, Apo Resettlement, Wumba, Apo Mechanic Village and part of Lugbe and Nnamdi Azikwe International Airport all located within the FCT Abuja.
With this development, TCN has not only established adequate Transformer capacity to serve these parts of Abuja but has also provided the necessary redundancy in line with the requirements of N-1 reliability criterion at both Katampe and Apo substations.
The installation of the two 100MVA, each at Apo and Katampe will also increase the total wheeling capacity of TCN, which was last simulated in the December 2017 to slightly above 7,000MW.
TCN also has advertised for upgrading the capacity of Central Area 132/33kV Substation. This project is part of the Nigerian Electricity Transmission Project (NETAP) financed by the World Bank as a successor to NEGIP.
TCN is also implementing the Abuja Transmission Scheme (ATS) financed by Agence Francaise De Development (AFD). The procurement process for the projects under the scheme has reached an advanced stage.
Five new Substations and a the third 330kV transmission line into Abuja in addition to Shiroro-Abuja and Ajaokuta-Abuja 330kV transmission line will be constructed as part of ATS. Two of the new Stations 330/132/33kV Substations under ATS will be sited at the West Main (Lugbe) and New Apo, while the three new 132/33kV substations will be sited at Lokogoma, Kuje and Gwarinpa. They are expected to cater for the transmission needs of Abuja in a long while.
I wish to thank the Honourable Minister of FCT for the cooperation he accorded TCN, which made this commissioning possible. TCN and the Ministry will continue to rely on the support and cooperation of the Honourable Minister of FCT, as we strive to meet the electricity requirements of Abuja, which is gradually transforming into a mega city. There is need to plan for the future expansion of Power Transmission and Distribution Infrastructure in the city.
Let me use this occasion to recognize the important collaboration that exists between FGN and Government of Japan under which Capacitor Banks worth over $10 million are being installed at Apo and Keffi substations. The Capacitor Bank in Apo, rated 22.5MVar is currently 80% completed. It will significantly improve the quality of power supply from Apo substation. The same collaboration is expected to also completely rehabilitate Apapa, Akangba, Isolo and Ikeja West Substations in Lagos.
In conclusion, on behalf of my colleague-Ministers and indeed the entire staff of the Ministry of Power, Works and housing, I congratulate TCN for successfully installing the 1X100MVA Transformer at Katampe and for the installation of another at Apo substation. The Ministry will continue to support its agencies, including TCN, to deliver Incremental Power to Nigerians.
Thank you.
Mr. Babatunde Raji Fashola SAN
Honourable Minister of Power, Works and Housing
DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE
DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE
MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1
MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1