Federal Ministry of Works (FMW)
... building the backbone for Development ...
Follow Us:
Welcome To Federal Ministry Of Works.
Minister Federal Ministry Of Works Engr. David Umahi.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Mar
24
2026

LATEST PRESS

UMAHI DECLARES AN END TO YEARS OF DEADLY TRAPS AND GRIDLOCK ON THE ENUGU–ONITSHA EXPRESSWAY, SETS MARCH 31 DEADLINE FOR REOPENING

The Honourable Minister of Works, Senator Engr. David Umahi, CON has declared that the long-troubled Enugu–Onitsha Expressway is fast shedding its grim past, as the Federal Government intensifies a sweeping infrastructure upgrade across the South-East under the President, His Excellency, Senator Bola Ahmed Tinubu, GCFR. 

Umahi made the declaration on Monday, March 23, 2026, during an inspection of ongoing projects in Enugu, including the Enugu–Onitsha Expressway and the Eke-Obinagu Flyover, where he expressed confidence that the era of consistent fatal accidents, endless traffic, and public frustration along the road is coming to an end.

“I’m going round the six geopolitical zones assessing what is possibly to be commissioned before May 29th by Mr President. There are mega project that the President will be available for before May 29th and we mean it,” the Minister said.

Once regarded as one of the most dangerous highways in the region, the Enugu–Onitsha road had for years been plagued by tanker explosions, loss of lives, and economic disruptions. But Umahi said decisive intervention by the Tinubu administration has changed the trajectory.

“Now this route, the Enugu-Onitsha expressway, you recall that when we came on board, everyday, people were talking about this road. There were a lot of tanker accidents, a lot of people died and so forth. But my joy is that the whole thing is a past story, because the President has swinged into action,” he stated.

The Minister disclosed that the dual carriageway, which spans 107 kilometres on each side, is undergoing a major structural shift, with a significant portion being converted from asphalt to concrete to ensure durability.

“It is not only that we are repairing this road… about half of it is going on to be concrete. I have no confidence in asphalt I continue to say it. By the time the asphalt fail we will have 50 percent of the road still intact and if it fails within the second tenure of the president then be rest assured that we will fix it,” he said.

He added that the same approach is being extended to sections in Anambra State, including the head bridge axis, where an initial asphalt design is being replaced with concrete pavement to align with modern highway standards.

“At the head Bridge we have 39k, we’re changing that to concrete so that we can have this coastal road type of road pavement there in Anambra and here in Enugu,”.

Beyond reconstruction, the project is also being enhanced with solar-powered street lighting and environmental features aimed at improving safety and sustainability.

“So that is going to happen but then not only that. We are putting solar light both for the one that was constructed before us and the one that is being done by us. Within the first one week we will have solar light up to this 1km and we continue we are also going to plant trees which is very important,” he added.

The Minister urged the people of the South-East to recognise the level of federal intervention in the region, noting that such attention to infrastructure was previously lacking.

“The people of South East have to be very grateful to Mr President. The reason is that we never had it like this. I was governor for 8 years and I can’t think of any Federal road project in Ebonyi State,” he said.

He also cautioned against divisive narratives, warning that some actors were misleading the public for selfish interests.

“I want to ask our people to be very very careful, there are people that pretend that they are helping us but they actually inciting us against government… we need to know when people are genuinely interested in our case,” he said.

Calling for sustained support for President Tinubu, Umahi described the ongoing works as part of a broader effort to correct past neglect and integrate the South-East more fully into national development.

“Let us allow this man that have started to right the wrong metted on us as the people of Southeast in the past. Let us allow him the next four years and we will be very much fully integrated,” he stated, adding, “To know the revolution that is going on in infrastructure… this is the Biafra we are looking for.”

As a major milestone, the Minister directed that the Enugu–Onitsha Expressway be reopened for public use on or before March 31. 

“I have given the controller the authority, by the 31st or before, he should call the press to open this road, call the people of South East… let them know that this road is open for travel and that will be our Easter celebration,”.

Addressing concerns over project costs, Umahi clarified that the Ministry of Works does not unilaterally determine project pricing, noting that approvals pass through multiple regulatory layers, including the Bureau of Public Procurement and the Federal Executive Council.

“I’m not the final authority when it comes to the cost of a project, there are layers of approval, the Bureau of Public Procurement, their own stands and not my own,” he explained.

He maintained that the standard being applied to the Enugu–Onitsha project is consistent with major road projects across the country.

“The same road architecture as the Lagos-Calabar coastal highway and the Sokoto-Badagry Super Highway… so no discrimination with the president, everybody is the same,” Umahi said.


 

Aug
21
2023

Umahi Resumes as Minister Amidst Cheers from Workers. The newly sworn-in Minister of Works, Senator David Umahi, has resumed at the Works Ministry. He received a rousing reception .He was received by Management Staff of the Ministry. The Permanent Secretary, Mr. Mahmuda Mamman represented by the Director Highways Construction and Rehabilitation, Engr. Folorunsho Esan led Management Staff.   The former Governor of Ebonyi State, and also the Senator representing Ebonyi South Senatorial District, now Minister as nominated by Mr. President immediately assumed duty after the inauguration of the Federal Cabinet by President Bola Ahmed Tinubu today 21st August, 2023 at the State House Villa Banquet Hall, Abuja.   Addressing a cross section of staff of the Ministry, Umahi has called for professionalism and seriousness to work, advocating for change from the existing style to new innovations and the use of local content.   “I will challenge my fellow engineers on the issue of concrete technology even in the midst of forex challenge and petroleum crises, the nation is endowed with natural resources so we should be prepared for the renewed hope of the present government anchored on change’’ he said.   The Minister stated that his administration is not to seat in the office but to be in the field, inspecting on going works and effecting the change we want saying that the fortunes of the nation are determined by the attitude of its professionals.   “ I am not an office person, I am a field person which means, we are going to make changes, we are starting inspection tours to inspect ongoing projects and to know the ones to come up  with” he said.   Umahi added that he will not tolerate people who will want to reset the clock backward but people who want to be part of history stating that he is a Minister of the Federal Republic of Nigeria and not Minister of Ebony State or South East alone and his best friends are those who are in line with the aspirations of Mr. President’s renewed hope and the expectations of Nigerians.   He promised by the special Grace of God to replicate the good work of God in Ebonyi State to the federal roads, he urged all staff to be prepared to work for the good of all.   “God gave us a lot of Grace in Ebonyi State and each time people talk about me, I say no talk about God, I don’t know how it happened.  I cannot do it alone and it’s not about me but about us as a nation’’.   The Minister said he will be briefed by every Departmental Head in the presence of all the staff so that all the staff will know what is on board.   To this end, he charged the staff of the Ministry to put in their best and be part of history, he thanked everyone for making out time to welcome him and promised to be there for everyone.   Also, the representative of the Permanent Secretary of the Ministry, Engr, Folorunsho Esan joyously welcomed the Minister warmly as a professional colleague and pledged the Ministry’s unflinching support towards a successful tenure in the Ministry.   In his closing remarks, the Director Highways, South West, Engr. Adedamola Kuti thanked the Minister for his show of commitment and love on his appointment, while also promising that the Ministry's staff will do their best to support his vision and mandate, he thanked all staff for coming out en -mass to welcome the Minister. ...

Jul
12
2023

Permanent Secretary - Mamman Charges COREN .....Halt Building Collapse Now. The Permanent Secretary FMW&H, Mahmuda Mamman has charged the Council for the Regulation of Engineering in Nigeria (COREN) to strategize and ensure a halt to incessant building collapse in Nigeria henceforth. The Perm. Sec made this disclosure during a courtesy visit of members of the council led by its Registrar, Engr. (Prof) Adisa Bello to the Ministry’s Headquarters office in Abuja.   Mr. Mahmuda Mamman speaking further said that, COREN being a Federal Government Recognized Regulatory Body is vested with the elaborate Mandate and Powers to check and control building standards in Nigeria. To this end he opined that there should be no more cases of building collapse which he frowned at and termed a bad situation that must be brought to a stop.   The Perm. Sec, said there seems to be a disconnect somewhere between Nigerian Engineers and COREN and that COREN as a matter of urgency proffer an urgent solution to this situation.   Mamman also advised that all Regulators in the Engineering body should come together and seek audience with the Ministry of Finance especially as regards the recent Federal Government Policy directive of self-funding for all such bodies . He further spoke to the idea of the consideration of levies as a way of generating revenues to assist the council. He thereafter charged the council to come up with implementable plans and guide lines by going back to the drawing board for them to be able to reposition COREN for better performance and impactful services to Nigerians.   Mamman appreciated the visit which he said was very fruitful and he is better informed now than before on the activities of COREN, while also directing that proper checks and registration alongside mandatory monitoring be carried out on construction activities that will end up in Nigerians living in well-built solid buildings with confidence without any fear of building collapse, come rain, come sun shine nationwide in Nigeria.   Earlier, the Registrar of COREN, Engr. (Prof) Adisa A Bello, said they were in the Ministry to brief the Perm.Sec on the activities of the Council for the Regulations of Engineering in Nigeria. The Registrar said COREN is a statutory regulatory organ of the Federal Government of Nigeria, established by Decree No. 55 of 1970 amended by Degree No. 27 of 1992, now Engineers (Registration).   The Registrar also confirmed that by the promulgation of Decree 27 of 1992, COREN was merely a Registration body of Engineers, and it was then known as Council of Registered Engineers of Nigeria. However with the expansion of its functions in 1992, which now includes Regulation and Control of the Engineering Family, COREN's name was changed to what it is now, but still retaining the acronym, COREN.   Amongst COREN ‘S MANDATE ARE: It is empowered to: 1.    Regulate and control Engineering practice in Nigeria with all its aspects and ramifications, 2.    Ensure that Engineering is practiced by industry, Government and professionals according to acceptable and prescribed standards and abiding by the ethics and cannons of the profession 3.    Ensuring that only registered Engineers head Engineering departments and Units 4.    Ensuring that without proper registration with COREN, Engineering Practitioners do not progress or function beyond legally prescribed levels among other key mandates of COREN.   Also in attendance were relevant Directors of Engineering Departments of the Ministry who also contributed to the very meaningful discussions. ...

Jun
18
2023

FMW&H Assures States of Partnership and Collaboration to Impact on the People The Permanent Secretary, Federal Ministry of Works and Housing, Mahmuda Mamman has assured states of the Ministry's  willingness to partner and collaborate with them , he made this disclosure while hosting the Executive Governor of Zamfara State, Dr Dauda Lawal in the Ministry's Headquarters office in Abuja over the weekend. The Permanent Secretary said ‘’ The Ministry is willing to collaborate and partner with states in order to make life more meaningful for all Nigerians not necessarily the people of Zamfara state because we are here to serve the interest of the country and we are also  ready to do that, Your Excellency." While responding to the request of the Governor, he said, FMW&H and the Federal Roads Maintenance Agency (FERMA) will work out a plan to be used as intervention strategy on the Funtua–Gusau Road he assured.   Mr. Mamman also assert that, “We are touching lives in so many ways and we really want to touch the lives of Nigerians especially the people plying that axis”. Mr Mahmuda has also instructed, the Director, Highways and Reconstruction Engr Folorunsho Esan of the Ministry   to mobilize and put necessary machinery in place to ensure that work starts from both ends of Funtua –Gusau Roads in the shortest possible time. The Governor, earlier in his  remarks, thanked the Permanent Secretary for granting his  request despite the short notice  , he said “the reason we are here today is to seek for partnership with FMW&H  in different areas of concern , I am aware of what the Ministry is dong, in  touching the lives of the people across the country, l am also aware  that the   contract for the dualization  of  Funtua -Gusau  Road has been  signed by the Ministry. Governor Lawal said that they were in the Ministry for two reasons, first to seek for the support of the Ministry to ensure that the contract startes from the Gusau end of the road and to also draw the attention of the Ministry and FERMA to the bad portions of the Gusau –Funtua road, so that it could be fixed before the major work starts for easy movement as the road is in a very bad shape. Commenting on the Governor’s request , Engr. Esan said " Contractors are only waiting for mobilization advance and as soon as that is done, funding will not be a challenge , contractors  can start from both ends of the road , there shall be no fear from whatever location  they start from, either from  Gusau or not ". Director, Highways Construction and Rehabilitation also said that, in 2020 Special intervention projects were signed for Zamfara roads and most of them have been completed. He said " In 2023 we have planned special intervention projects for  Zamfara roads  as well to make life easy for the people". ...

First First First

LIVE ACTIVITY FEED

PUBLIC ANNOUNCEMENT


Nov
03
2025

  


OTHER NEWS

Dec
11
2018

FG Commends Contractors On Quality Of Roads; Advocates For Alternative Funding Sources

The Federal Government has commended contractors handling various road and housing projects in the South South region for doing a good and quality job.

2.      The Honourable Minister of State I for Power, Works and Housing, Hon. Mustapha Baba Shehuri expressed satisfaction on the quality of road   rehabilitation and construction, as well as the construction of mass houses under the present administration,  since its inception three years ago. He added that contractors are now fully back to sites with attendant effects on rejuvenating the economy and enhancing human capital development.

3.      Shehuri noted that in tackling infrastructural deficits across the country, there is a dire need for alternative and innovative sources of funding beside the usual annual budgetary allocations, adding that government is presently using the SUKUK (bond) funding option and Public - Private - Partnerships (PPP) to bridge infrastructural gaps in the country.

4.      The Minister stated this in Yenagoa, Bayelsa State during a working tour to the South South geopolitical zone to inspect ongoing projects being embarked upon by the Ministry.

5.      Earlier in his tour, the Minister inspected the Dualisation of Lokoja – Benin road, Section II: Okene – Auchi, Section III: Auchi – Ehor, as well as Section IV: Ehor – Benin City.

6.     He also visited the ongoing Dualisation of  Sapele - Ewu road, sections I and II, Sapele - Agbor and Agbor - Ewu, respectively.

7.      The Honourable Minister expressed satisfaction in the level and quality of work being carried out, especially in Bayelsa state inspite of the difficult terrain. He said this while inspecting ongoing construction works on Yenegwe – Okaki – Kolo road and the Dualisation of Yenegwe Road Junction – Kolo – Otuoke – Bayelsa Palm road.

8.      While in Rivers State, the Federal Controller of Works, Engr. J. O. Fadire briefed the Minister on the progress of work on the Rehabilitation of Enugu – Port Harcourt Expressway, Section IV, Aba - Port Harcourt, as well as the 39 - kilometre Bodo – Bonny road with bridges across Afa, Opobo and Nanabie Creeks, the only one to link the Ogoni people with Bonny Island.

9.     Engr. Fadire stated that though there are challenges affecting the pace of work such as  the environment, compensation and youth restiveness,  he, however, commended the contractor, Messrs Julius Berger (Nig.) Ltd. for the progress made within a short period of time. He further assured the Minister that the project will be delivered as scheduled because funding is not an issue as the major financiers, Messrs NLNG Ltd. is committed.

10.     The Minister visited the  construction sites of houses under the National Housing Programme (NHP), the second of its kind in the history of the nation since the President Shagari Low Cost Housing of the early 1980s, in Benin City, Edo State, Asaba, Delta State, Uyo, Akwa Ibom State and Calabar, Cross Rivers State. He also inspected the ongoing construction of the Federal Secretariat in Yenegoa, Bayelsa, where the Federal Controller of Housing in the State assured the Minister that the project will be completed by February, next year.

11.    Hon. Shehuri noted that with the construction of these affordable Mass Housing Estates across the country, the present government is delivering on its campaign promise of bridging the housing deficit in the country, creating jobs and  generating wealth.

12.    The Phase I of the NHP projects, according to the Minister, have reached advance stages of completion and will be due for commissioning in the first quarter of next year, stressing that the houses are for all interested illegible Nigerians.

13.     The Minister further disclosed that the procurement processes for the second phase of the Programme will soon be concluded and contracts awarded for its commencement in all the states that have provided the Ministry with land.

14.     During the course of the Tour of Duty, the Honourable Minister also visited the 132 KVA Transmission Substations at Uyo and Calabar in Akwa Ibom and Cross River States, respectively, where the present Government installed and commissioned an additional 1 * 60 MVA Transformer each, in April.

15. While conducting the Minister round the Uyo Facility, the General Manager, Port Harcourt Region of the Transmission Company of Nigeria (TCN), Engr. Solomon Uyouko lamented that out of the 144 megawatts capacity of the transmission infrastructure, the DisCo utilise a meagre 2% daily, leaving most of the generated and transmitted power idle.

16. The story is almost similar at the 132 KVA Transmission Substation in  Calabar, where the Acting Assistant General Manager, Engr. Nasiru Bello stated that out of the 192 megawatts  transmitted daily, the DisCo evacuates between 20 - 30%.

17.      Commenting on the unfortunate state of power distribution infrastructure in the country, Hon. Shehuri said the present scenario is unacceptable, while admonishing the DisCos to up their game or pave way for those with requisite capacities. He further urged Nigerians to start blaming the DisCos for lack of electricity, not the Federal Government.

Speeches

Jul
14
2017

Power Sector Reforms- Challenges And The Way Forward

Being The Text Of The Lecture Delivered By The Honourable Minister Of Power, Works And Housing, Mr Babatunde Raji Fashola, San At The Department Of Economics 2017 Public Lecture Series, University Of Lagos, On Thursday 13th July 2017

I thank you for inviting me to be your guest lecturer at the 2017 edition  of your public lecture series.

I accepted this invitation for many reasons. First it was conveyed through Mr. Ayo Gbeleyi who served with me meritoriously as Honourable Commissioner and Head of PPP Office and he implored me to do the best I could to make time to accept.

Secondly, the topic which focuses on “Challenges and the way forward” resonates with my view of the power sector and I believe that of many, who acknowledge that the sector has challenges; more importantly the topic is solution driven and positive in outlook which is consistent with my attitude, that, instead of recrimination, reproach and cynicism, we should look for the way forward. 

I will like to say that many right thinking and well-meaning Nigerians are now taking this view, which is that the problem of power in the country can be solved, and we all have different but very important roles to play.

I will come to this as I proceed, but I must warn that this may be a fairly long speech, because there is a lot to say, and because there is a lot happening in power, and more importantly because I believe one of the most important things I can do as a Minister is to simplify what is going on for the benefit of the public and to discuss it using street level  terms and not technical terms.

The bottom line really is that people want to know when they will have stable electricity, why they do not have it, and what government is doing about it.

Permit me to share with you, what our road map is.

We recognise that our power supply is not enough and what we have done is do the simplest thing, get more power.

So our road map seeks to get, first incremental power, progress to stable power, and then achieve uninterrupted power.

From this road map it must be clear to any right thinking and well meaning person that this is a journey and not an event that will happen overnight.

As we progress on this journey, we will get to critical milestones from which we can look back and say we are now better off at that milestone, than when we started the journey.

I understand the urgency of now, to get the power, I understand the high level of expectation.

I know that they come from many years of broken promises and a change from government-managed power to privatisation of power.

While I fully support privatisation, I believe what took place in 2013 in the heat of politics was a privatisation that was well intentioned since 2005 but delivered with some deception in 2013 with the expectation of political profit.

It led many uninformed Nigerians to believe that once the privatisation was concluded, the assets sold to the Distribution companies (DisCos) and the Generation companies (GenCos) there was immediately going to be power.

I cautioned then that people’s expectations were being unduly raised without telling them that there was a lot of work to do.

While I believed that the APC government will do a better job, little did I expect that I would inherit the problem. But I am grateful for the opportunity from Mr. President, to contribute to solving a problem that I am deeply passionate about and I will offer nothing but my best while I am at it.

As I have said, there are challenges, which is why I accepted this invitation and they can be solved, which is why I have come to share my thoughts about the way forward.

I have also pointed out that we have a road map whose first objective is to get incremental power and this means power from gas, solar, wind, coastal waves, hydro dams, nuclear and bio mass.

I have also pointed out that all of us have roles to play.

I am inspired by the history of Nigeria that whenever we have united to confront a problem, we have never lost. The number of Nigerians interested in generating power is increasing daily and this is encouraging.

This is evidenced by dozens of letters and proposals I get daily, even though they are wrongly directed to the Ministry, because power is now privatised.

There are people who know about it, there are those seeking to make money from it, there are those who know absolutely nothing about it but are still seeking to try. The positive I take away from it is that we are increasingly looking in the right direction.

I will share a story with you, first for its humour and secondly for its consistency, with our road map to get the incremental power.

I had received a text on my telephone, one of the many hundreds I get daily since I published my telephone number many years ago.

This particular one was interesting because the sender alleged that he had found the solution to our energy needs and was wiling to share it with me.

I called him to discuss this “novel” idea he claimed to have. He then referred me to a news report that showed how somebody was generating electricity from a potato.

I then took the time to explain to him that this was not new technology but indeed what we had shared with school children in my time as Governor, in the Power Kids Club that we set up to introduce people to the fundamentals of electricity early in life.

Just as I was preparing this speech, one of my former state Executive Council members who served with me referred me to an online publication about generating electricity using biomass.

Ladies and gentlemen, these two instances confirm what I said about:

Increasing interest of Nigerians in solving the power challenge, which is positive and welcome.

Generating incremental power from all viable sources.

The hard truth is that generating electricity from potatoes or cow dung is possible. The question is viability and sustainability.

First, how much cow dung can we produce to keep the power going? Because even countries who have enough cows, like Brazil and can export beef, don’t use cow dung for power.

Similarly, how much potato can we produce to fire our power needs?

In any event, in a country where there is poverty and hungry people, and with the proven calorific and nutritional values of potato, I think it would be a poor choice to use it for power generation as opposed to using it for nutrition and well-being of children and people.

I will shortly come to specifics of what we are doing to resolve the challenges, but permit me as I have just clarified the situation about cow dung, potato, (which also by the way applies to all those who want to generate electricity by using waste) to also explain what I think is fundamental about power.

It is that there is no real problem in buying and installing a power plant. It is not different from you buying and installing a generator in your home.

The problem starts when you cannot get diesel or petrol, just as we usually don’t have enough gas supply either because of production shortages or vandalism.

The problem with your generator starts when you have to connect your neighbour and issues arise as to how you share the cost or what appliances your neighbour or even your family can switch on when the generator is running especially if it is not a very big one, in order to avoid damage.

The problem arises if the generator needs maintenance or repairs. Can you use it during repairs if you don’t have a backup?

What is true of the generators we install for ourselves is essentially true of the power plants we have as a country.

Those plants are nothing more than big generators. We connect them through 330KV wires, 132 KV wires, 33KV wires and 11 KV wires that transmit the power from the plant, carrying them across several hundreds of kilometres, injecting and sending them through about 183 sub-stations to the distribution companies before they get to our homes, offices, schools and so on.

In the process wires snap, equipment gets damaged by us or by natural wear and tear and requires replacement. Most of it, we have to import because we do not have enough as backup, the plant is not available during repairs.

In order to get incremental power therefore, we have resolved to use all our sustainable energy sources like hydro, gas, wind, solar, and coal (not potato and cow dung) and work is now going on at:

For Hydro -
a) Zungeru Hydro plant in Niger for 700 MW
b) Kashimbilla Hydro plant in Taraba for 40 MW
c)  Dadin Kowa Hydro plant in Gombe for 29 MW
d) Gurara Hydro plant Nigeria for 30 MW
e) Later this year work should start on Mambilla Hydro for 3,050 MW

As for gas plants, there are many already such as:

Egbin 1,320                              
Geregu I & II                                
Omotosho I
Omotosho II
Olorunsogo I
Olorunsogo II
Alaoji
Ibom
Calabar
Ughelli

to mention just a few, all of which are challenged by Debts owed from the previous administrations, lack of sufficient gas or vandalism of existing gas lines or a combination of them.

Gas supply is the responsibility of the Ministry of Petroleum Resources and its parastatals like NNPC, Nigerian Gas Company and others.

We are working with them to improve on supply of gas to these plants to ensure that their redundant capacities and idle turbines come back into operation to produce electricity.

We have just concluded repairs on Afam IV Power Plant that was plagued by a damaged transformer which we replaced in order to restore 100 MW of gas fired power to the grid.

Simultaneously there is a Presidential initiative with General Electric through our Ministry to deliver 240 MW of emergency power to the site of Afam III using the existing gas resources there.

The turbines are already in country and installation should be complete within year.

As for wind energy, we are completing the abandoned 10MW Katsina wind farm project to pilot wind energy development and if sustainable, we can expand it.

There is no recorded coal power production today. The last one at Orji River Coal Power Plant in Enugu built by the colonial government had been dismantled when I visited.

But we are working with a group that shows the commitment to deliver up to 3,000MW of coal power in the Benue/Kogi belt where there are proven and sustainable deposits of coal about 20 kilometres from the intended power site.

Solar power presents the real window of opportunity to quickly increase power and also give people access.

We have shown that we can deliver solar by completing the 1.2MW solar project in the lower Usman Dam area. We have signed power purchase agreements with 14 developers who potentially can deliver 1,125 MW of solar.

We are partnering with Jigawa state to deliver about 1,000 MW of solar power at a site of 2,000 hectares already delivered to us by the state government. The project is at design and preparation stage.

We have completed the energy audit to deliver independent power to 37 universities and 7 teaching hospitals and one of them is the University of Lagos.

27 (TWENTY-SEVEN) of those plants will be solar plants.

These are only one side of what government is doing to deliver incremental power through solar.

The other side is what citizens have started on their own with solar.

Some of the ones I can recall are those of an oil marketing company that is now powering its petrol filling stations by solar, and initiatives by other groups which I have helped to launch to deliver solar packs to unconnected communities.

Recently, the Acting President also commissioned an Independent Solar Power facility at a village called Wuna in Abuja that had not been connected to the Grid.

For the avoidance of doubt solar is the new power, its appeal is very strong with young people and it provides a unique opportunity to close our power supply deficit.

My final word on these sources of power generation is that they speak to the idea of an energy mix; and we have delivered one for Nigeria which targets 30% renewable of our total energy production by 2030.

Generation of power is not the end of the power value chain. On the contrary, it is just the beginning. To reach our homes the power has to be transported.

This is the Transmission System and the National Grid that co-ordinates 8 transmission regions with 183 substations from the National Control Centre in Oshogbo.

For the record, this Grid is also somewhat misunderstood. People have said it is the problem because it can only carry 5,000 MW.

I will correct this unchanging opinion first by stating that under the Buhari Administration, the Grid has expanded to 6,200 MW because we have completed transmission stations in places like Ikot Ekepene, Okada, Alagbon, Ajah, Katampe, Sokoto and awarded many more in places like Damboa, Pankshin, Osogbo, Kumbotso, Odogunyan to mention a few.

In the last few days we completed work at:
Kukwaba substation in Abuja
Increased transformer capacity at
Ajah substation in Lagos
Mayo Belwa substation in Adamawa

The logic therefore is that if projects to expand the Grid are being completed and new ones started, it is either ignorance or mischief to continue to argue that the Grid cannot wheel more than 5,000 MW.

The correct, informed and sensible view is that the Grid is dynamic and must grow as power production grows.

How we got to this Grid improvement is the story that I will share now.

Since the integrated power project started almost a decade ago, several projects were issued as contracts to develop the transmission system.

Many of the equipment imported by contactors were trapped at the port in over 800 containers for almost 10 (TEN) years because Government did not budget to pay the contactors.

It is in the first full budget of the Buhari Administration that a budget for payment was presented and approved in 2016.

At the time of preparing this speech, we have paid N930, 229, 418 (NINE HUNDRED AND THIRTY MILLION, TWO HUNDRED AND TWENTY-NINE THOUSAND FOUR HUNDRED AND EIGHTEEN NAIRA) and resultantly 387 (THREE HUNDRED AND EIGHTY SEVEN) containers have now been recovered and handed to the contractors for deployment to their site.

Some of those sites whose projects have been held back were:

1.      Design and construction of 2x60 MVA 132/33KV transmission substations at Kachia Kaduna State.    
2.     Ganmo-Ogbomosho 132KV transmission Line Project (45KM) Kwara-Oyo.
3.     Supply of Aluminum conductor composite core for Re-conducting of Onitsha New Haven 330KV transmission line.
4.    Construction of 132KV DC TRX line Yola-Song-Little Gombe-Mubi-Gulak.
5.    Construction of Onitsha Oba-Nnewi-Ideato Okigwe 132KV Double Circuit Transmission.
6.     Even the completion of the 215 MW Kaduna plant was held back because some of those equipment were previously trapped in the port.

We are currently planning to maintain and upgrade the carrying capacity of some old lines by re-conducting them and expanding their transmission capacity.

But while the transmission is being upgraded the last mile of the value chain, which is the distribution end, must be ready to accept and distribute the power.

For the record, there are 11 Distribution Companies namely:

– Kaduna Distribution Company
– Kano Distribution Company
– Yola Distribution Company
– Jos Distribution Company
– Abuja Distribution Company
– Ibadan Distribution Company
– Ikeja Distribution Company
– Eko Distribution Company
– Benin Distribution Company
– Port Harcourt Distribution Company
– Enugu Distribution Company

Many of them inherited old distribution assets like feeders, Transformers, Ring main units and conductors (the lines) to mention a few.

If you are observant you will see falling, bending, misaligned poles and wires in your streets and neighbourhoods.

They don’t look as organised as those you see abroad.

These are the old assets sold to the DisCos which must be upgraded, repaired and replaced over time in order to be able to effectively distribute power (received from the Transmission Company) to your offices, schools, shops and homes.

Therefore, the Transmission Company is a service provider to the DisCo, who is the customer just as the DisCo is the service provider to you and I who are customers.

Therefore, if any one of them is inefficient, you and I don’t get power or it is unreliable.

You will have heard of load rejection and be wondering why what is not enough is being rejected.

Each DisCo has a fixed % of the total amount allocated to it and the DisCo then nominates the area within their business area where they want TCN (the transmission) to send power.

Disco % of total allocated in MYTO2  
Abuja 11.5%
Benin 9%
Enugu 9%
Eko 11%
Ibadan 13%
Ikeja 15%
Jos 5.5%
Kaduna 8%
Kano 8%
Port Harcourt 6.5%  
Yola 3.5%

 

 

 

 

 

 

 

 

 

 

Normally as a business they will nominate supply to places where customers are paying and where their equipment is working.

In places where collection is difficult or equipment is not functioning, they will refuse to energise their power intake or are unable to do so. This is what is called load rejection.

What then happens is that the Control Centre tells the GenCos to reduce their power production because if it is not taken, it results in high frequency which can damage the generating unit, create loss of power, and sometimes result in Grid collapse depending on how severe the outage is.

The problems came on the Horizon as Gas is improving and Rains are  arriving to increase power production on Thermal and Hydro plants.

Eligible Customer

This is why I have exercised the power conferred on me by the Act to declare what is called “Eligible Customer”.

What this simply means is that certain classes of consumers that consume a lot of energy like factories, hotels, state governments or local government secretariats, whose DisCos have poor distribution equipment, can apply to NERC for eligibility to build the distribution facility that the DisCo cannot or refuses to build, and then take their power direct from the GenCo.

Clearly the purpose is to increase service and access to power and we have already received a number of requests; however the power is not cheap.

The cost of building the distribution asset means that it comes at a premium, but offers access to more realistic power, which is cheaper than self-generation and diesel, which is between N60-N70 per kw/h.

The success of this initiative offers many prospects for success:

Competition by small GenCos
Response by DisCos to upgrade their equipment
Disaggregated tariff paid by eligible customers who are high end consumers without materially adversely affecting regular domestic consumers, (whose tariff can only be changed by a major tariff review which I will explain) and creating an opportunity for cross-subsidization. (Rich and heavy consumers bear some of the cost of the poor and small consumers.)

Tariff

This is as best as I can attempt to summarize the value chain and what we are doing. There are of course more technical issues that time and the forum do not permit or compel. However, we must all recognize and accept that tariff is a cost that we must all pay to keep the value chain viable as a business.

It is measured by meters (which I will come to) but every consumer must pay. It is a criminal offence in Nigeria and all over the civilized world to use public electricity and not pay for it.

Tariff is not fixed by the Minister. I have no such power. Tariff is proposed by the DisCos after consultation with their customers, and then approved by NERC (the Nigerian Electric Regulatory Commission) during a major Tarrif review.

The process of determining tariff takes into consideration the amount of power (4,500 MV in 2015) the number of consumers on record who will pay it (6,000,000), the cost of producing and transporting power, operating cost of the operators, exchange rate, inflation and interest rate; and the tariff for each class of consumer is determined.

The classes of consumers are R1, R2, R3 and MD. The tariff of each class is different in their DisCo while the tariff of R2, R3 and M are different from DisCo to DisCo.

It is only R1 that has a fixed tariff of N4 per/kwh across all DisCos and it was not changed in the last tariff review.

I spoke about a major tariff review; there is also minor tariff review.

The 2015 tariff review gave us a 10-year tariff that should be declining as the sector stabilizes.

It provides for a major review after 5 years, and minor reviews every 6 (SIX) months to keep the market abreast of the economic realities of foreign exchange, gas price, and inflation changes.

If we want to experience reliable electricity, we must accept the reality of tariffs and possible upward or downward reviews.

We must stop going to court to get injunctions to stop tariff reviews. We don’t do so, when exchange rate, inflation and prices of other commodities change. (The Court of Appeal has reversed the decision of the Federal High Court which stopped the implementation of the last tariff review).

What we must insist on, is the provision of meters, so that we can monitor and control what we consume.

Government must also not interfere with the power of the regulator when it fixes tariff in the way the last administration ordered a reversal of tariff in order to win electoral votes in 2014.

It created a massive debt for Nigeria, because while the Government ordered a reversal of Tariff, it did not reduce Exchange Rate, Interest Rate , cost of wages or cost of gas and other inputs necessary to produce power.

Why should Nigeria carry a debt created by an individual’s electoral ambition?

This is what the Buhari administration has to contend with.

It might interest members of the public to know that most if not all the oil & gas producing communities where there is electricity connection do not pay for power, somebody is carrying that cost.

It is worsened by the fact that the light bulbs are on during the day and I am told in some communities that they are never switched off. This is waste. What is wasted will never be enough.

Meters

One of the omissions of the privatization carried out by the last administration was lack of compulsory metering before the privatization.

This is compounded by an inaccurate consumer projection of 6 million households, without a consumer audit. These are the problems the Buhari government is now trying to fix with the Power Sector Recovery Program, which I will discuss later.

What the public must know about meters are:

Meters are measuring and safety equipment that must be tested by NEMSA before they can be used.

Different classes of consumers require different types of meters: Single and multiple phases to ensure that your meter matches your consumption.

Meters by the same manufacturers are calibrated for each DisCo use, such that you cannot use a meter calibrated for Ikeja DisCo in Eko DisCo without Re-calibration.

Meters cannot be installed without visit to the home for audit assessment.

DisCos liquidity problem makes it difficult for them to access credit to order and supply meters. One DisCo requires over N20B to meter.

The consumer base does not capture all those who consume power, and without meters, the DisCos aggregate power distributed to a destination and estimate the bill for the known consumer who is perhaps paying for the neighbour who is not known or is stealing energy; (whistle blowing for energy theft is a civic responsibility)

Those who are resisting the installation of meters and assaulting DisCo staff who seek to install meters must stop it. It is a criminal offence.

N37 Billion meter contract

The government of Nigeria had in 2003 (14 years ago) issued a contract for the supply of 3 million meters to NEPA/PHCN

That contract was not performed until the privatization was concluded in 2013, and was inherited by the Buhari government as a court case in which a judgment of N119Billion had been signed against government. We have worked to get the case out of court , negotiate the judgement and go back to the N37Billion contract to see how many meters it can now provide, and how to install them. We are still finalising the terms of agreement.

Gas supply

Although we get power from Hydro and we plan more from solar and coal, I cannot conclude this speech without speaking a little about gas which is managed by the Ministry of Petroleum Resources but which is the fuel for 26 (TWENTY-SIX) plants out of the 29 (TWENTY-NINE) power plants in the country.

2016 was a particularly difficult year for our gas fired turbines because there were at least 16 major gas pipeline attacks with explosions, between February and May of 2016.

This is why we did not experience stability until August when the rains came and we could rely on the Hydros, whose capacity had been upgraded.

Those pipelines are gradually now being repaired as a result of relative peace secured by initiatives of the President, Vice President, Minister of Petroleum Resources, Governors and other stakeholders.

Power Sector Recovery Programme (PSRP)

Without a doubt the privatisation of power is the way to go.

Admittedly it has not yet delivered the kind of results we were all made to expect, for some of the reasons I have stated; political interference, liquidity, metering, debts, governance, technical capacity of operators and the political dishonesty with which Nigerians expectation were raised to the sky.

But I have no doubt at all, having studied the privatization of Brazil, Mexico, India, South-Africa and China (who went through some or all of our current challenges), that reliable electricity will happen in Nigeria.

It is not an event, it is a journey marked by positive trends that have occurred and will occur as the right solutions are deployed to challenges.

This is what the Power Sector Reform Program (PSRP) seeks to achieve.

Because of the current transition challenges, some people have called for the cancellation of the privatization, but such a course of action (which I do not support) has consequences: -

Government will be breaching its own contract in the same way we cancelled the privatization of refineries in 2007 and will send a negative investment signal that we do not respect agreements;

Government will have to refund in dollars, all the monies paid by the DisCos and GenCos most of which have been spent on almost 50,000 workers of PHCN who had to be paid;

Government will now have to re-employ those or other workers back to operate the assets and again increase salary and pension costs, when our recurrent cost is above 70% of budget today.

Instead of doing these, Government believes that the lapses in the privatization can be re-engineered, retrofitted or reformed to deliver.

The PSRP is therefore a set of policies and actions aimed at restoring credibility, liquidity, transparency, efficiency, good governance and improved service delivery to the power sector.

The PSRP is meant to implement and deliver the power component of the Economic Recovery & Growth Plan (ERGP) of the Buhari Government and it is already being implemented.

N701 Billion NBET payment assurance programme

Metering plan (already discussed)

Constitution of Boards of Agencies for Governance (NERC); Rural Electrification Agency (REA)

Change of Government Representatives in DisCos

Procurement and Capital Requirement Guidelines for Discos by NERC

Energy mix, already done to achieve diversity of energy sources and energy security

Tariff Computation Reform

Communication and Advocacy

Technical capacity and equipment upgrade by DisCos for loss restriction

Legislation to restore and punish energy theft and damage to power assets

Ladies and Gentlemen, these are some of the challenges the power sector faces and the way forward as formulated by the Buhari Government in order to reform the power sector for efficient delivery.

As you will have seen, many if not all of them are man made.

Therefore if men and women create problems , only men and women can solve them. 

You and I therefore  have critical roles to play , and I have signed up to play my own.

Have you ?

Thank you for your attention.

Babatunde Raji Fashola, SAN
Honourable Minister of Power, Works and Housing

PHOTO NEWS

Jun
02
2025

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

Click To View More Pictures

PHOTO NEWS

Apr
28
2025

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

Click To View More Pictures