UMAHI DECLARES AN END TO YEARS OF DEADLY TRAPS AND GRIDLOCK ON THE ENUGU–ONITSHA EXPRESSWAY, SETS MARCH 31 DEADLINE FOR REOPENING The Honourable Minister of Works, Senator Engr. David Umahi, CON has declared that the long-troubled Enugu–Onitsha Expressway is fast shedding its grim past, as the Federal Government intensifies a sweeping infrastructure upgrade across the South-East under the President, His Excellency, Senator Bola Ahmed Tinubu, GCFR. Umahi made the declaration on Monday, March 23, 2026, during an inspection of ongoing projects in Enugu, including the Enugu–Onitsha Expressway and the Eke-Obinagu Flyover, where he expressed confidence that the era of consistent fatal accidents, endless traffic, and public frustration along the road is coming to an end. “I’m going round the six geopolitical zones assessing what is possibly to be commissioned before May 29th by Mr President. There are mega project that the President will be available for before May 29th and we mean it,” the Minister said. Once regarded as one of the most dangerous highways in the region, the Enugu–Onitsha road had for years been plagued by tanker explosions, loss of lives, and economic disruptions. But Umahi said decisive intervention by the Tinubu administration has changed the trajectory. “Now this route, the Enugu-Onitsha expressway, you recall that when we came on board, everyday, people were talking about this road. There were a lot of tanker accidents, a lot of people died and so forth. But my joy is that the whole thing is a past story, because the President has swinged into action,” he stated. The Minister disclosed that the dual carriageway, which spans 107 kilometres on each side, is undergoing a major structural shift, with a significant portion being converted from asphalt to concrete to ensure durability. “It is not only that we are repairing this road… about half of it is going on to be concrete. I have no confidence in asphalt I continue to say it. By the time the asphalt fail we will have 50 percent of the road still intact and if it fails within the second tenure of the president then be rest assured that we will fix it,” he said. He added that the same approach is being extended to sections in Anambra State, including the head bridge axis, where an initial asphalt design is being replaced with concrete pavement to align with modern highway standards. “At the head Bridge we have 39k, we’re changing that to concrete so that we can have this coastal road type of road pavement there in Anambra and here in Enugu,”. Beyond reconstruction, the project is also being enhanced with solar-powered street lighting and environmental features aimed at improving safety and sustainability. “So that is going to happen but then not only that. We are putting solar light both for the one that was constructed before us and the one that is being done by us. Within the first one week we will have solar light up to this 1km and we continue we are also going to plant trees which is very important,” he added. The Minister urged the people of the South-East to recognise the level of federal intervention in the region, noting that such attention to infrastructure was previously lacking. “The people of South East have to be very grateful to Mr President. The reason is that we never had it like this. I was governor for 8 years and I can’t think of any Federal road project in Ebonyi State,” he said. He also cautioned against divisive narratives, warning that some actors were misleading the public for selfish interests. “I want to ask our people to be very very careful, there are people that pretend that they are helping us but they actually inciting us against government… we need to know when people are genuinely interested in our case,” he said. Calling for sustained support for President Tinubu, Umahi described the ongoing works as part of a broader effort to correct past neglect and integrate the South-East more fully into national development. “Let us allow this man that have started to right the wrong metted on us as the people of Southeast in the past. Let us allow him the next four years and we will be very much fully integrated,” he stated, adding, “To know the revolution that is going on in infrastructure… this is the Biafra we are looking for.” As a major milestone, the Minister directed that the Enugu–Onitsha Expressway be reopened for public use on or before March 31. “I have given the controller the authority, by the 31st or before, he should call the press to open this road, call the people of South East… let them know that this road is open for travel and that will be our Easter celebration,”. Addressing concerns over project costs, Umahi clarified that the Ministry of Works does not unilaterally determine project pricing, noting that approvals pass through multiple regulatory layers, including the Bureau of Public Procurement and the Federal Executive Council. “I’m not the final authority when it comes to the cost of a project, there are layers of approval, the Bureau of Public Procurement, their own stands and not my own,” he explained. He maintained that the standard being applied to the Enugu–Onitsha project is consistent with major road projects across the country. “The same road architecture as the Lagos-Calabar coastal highway and the Sokoto-Badagry Super Highway… so no discrimination with the president, everybody is the same,” Umahi said.
FEC Approves Funds for The Revised Estimated Total Cost for The Rehabilitation of Yola-Hong-Mubi Road in Adamawa State and The Reimbursement of Funds Expended for The Construction of Federal Roads by The Yobe State Government The Federal Executive Council (FEC) presided over by President Muhammadu Buhari, GCFR, on Wednesday 22nd June 2022, approved the rehabilitation of the Yola-Hong-Mubi Road in Adamawa State, as well as the reimbursement of funds expended for the construction of Federal roads by the Yobe State Government. The council approved the revised estimated total cost for N29,826,449,000.00 thereby revising the initial contract from the original N21,841,578,000.00 to N51,668,027,000.00, and an additional period of Twenty-four (24) months for completion of the Yola – Hong – Mubi road in Adamawa State. In a similar development, Yobe State Government undertook the construction of five (5) Federal Roads: Rehabilitation/Construction of Kaliyari-Bayamari-Geidam, 109km road, Rehabilitation/Construction of Gashua-Yusufari 31km Road, Rehabilitation/Construction of Damaturu – Buni – Magza 77km Road, Rehabilitation/Construction of Nguru – Machina 57km road and Rehabilitation/Construction of Katarko Bridges (4 spans Bridge) to the tune of N20,942,211,672.25 being expenditure incurred for the rehabilitation of the five (5) projects. The Federal Executive Council, however, approved the total Sum of N18,663,843,119.39 following a thorough review and issuance of a certificate of no objection by the Bureau of Public Procurement (BPP). The Yola-Hong-Mubi Road connects Yola, the capital and administrative center of Adamawa State to Mubi town, enabling the movement of people and goods. Similarly, the roads constructed in Yobe state will go a long way to better the lives of the affected communities. The public will recall that on Wednesday 15th June 2022, the Federal Executive council had approved the award of contract for the rehabilitation of Kashimbila – Takum – Chanchanji road in Taraba state. These approvals are all aimed at facilitating the reconstruction of infrastructure in the North East areas of the country that were impacted by the Boko haram insurgency, and giving Nigerians a better lease of life. ...
FG Commissions and Hands Over Isoko Ring Road The Federal Government has commissioned a number of road projects under its second phase of projects completion across the country tagged “Season of Completion and Delivery of Projects” which include: the Efon -Alaaye -Erinmo –Iwaraja Road linking Ekiti and Osun States as well as Hadejia-Nguru –Gashua road linking Jigawa and Yobe States within the month of June 2022. The projects are expected to create easy transportation, ease of doing business and reduction in accident rate in the country. At the commissioning and handing over ceremony of Isoko Ring Road II covering Aviara – Uzere in Oturu -Uzere Community, Isoko South Local Government Area of Delta State, President Muhammadu Buhari who was represented by the Minister of State for Labour and Employment, Barr. Festus Keyamo said, “Our commitment to improving the ease of doing business, create jobs and prosperity to lift people out of poverty brings us here today because the results of our investment are manifesting." President Buhari remarked, “I can confidently say that as we enter the final lap of the tenure of the Buhari administration we are also entering a season of completion and delivery of projects.” The Minister of Works and Housing, Mr. Babatunde Fashola, SAN who was represented by the Deputy Director Highways South-South Ministry of Works and Housing Engr. Peter Umoren said,” My principal message to you all is that this is the first of the second phase of projects completion and handovers our country will be witnessing as we progress further in this season of completion and impact which started in the last quarter of 2022." “In this second phase of completion Mr. President has also approved that Ministers from various states where projects have been completed should represent him to perform the handover formalities. These projects represent major investments in road transport infrastructure, which is a commitment of the Buhari administration as a driver for economic growth and prosperity," he said. Earlier the Permanent Secretary Federal Ministry of Works and Housing, Mr.Bashir Nura Alkali who was represented by the Federal Controller of Works Delta State, Engr.Jimoh Olawole, said, ‘’ As part of President Muhammadu Buhari's development agenda of addressing road infrastructural development across the length and breadth of Nigeria , the Federal Government as a policy direction focused on the completion of several on-going projects to stimulate economic development, job creation and promoting local content. The focus is to link the major arterial roads to refineries, ports, tertiary institutions and high-volume commercial centres with a view to reducing travel times, vehicle maintenance costs, safety and security of commuters etc.” The Executive Governor of Delta State, Dr. Ifeanyi Okowa who was represented by the Delta State Commissioner for Works (Urban Roads and Highways), Engr. Omodon Noel remarked, " This event is important because this project underscores the need for strong collaboration between the Federal and State Government in the delivery of development projects. " He said, " At the peak of the raining season last year, a bridge on the Oleh - Uzere community, this Ring Road being commissioned today became the saving grace that provided access to the community." In his goodwill message, Comrade Ejoor Uweh representative of the President General of Uzere community expressed his gratitude by saying, "Special thanks to the President and all the people that contributed in one way or the other to facilitate the construction of the Isoko Ring Road to develop Isoko nation to an enviable height." The Area Manager of Levant Construction Nigeria Limited, the contractors of the road project, Mr. Ghassan Fiadel said, " Federal Government has invested so much on roads, bridges and infrastructure across this country. This very road is helping a lot in helping people to transfer food, properties within the communities around." He said, “The payment is not delayed at all within the period we worked on the road. We thank the Federal Government and hope to get more jobs from the country." A former Nigerian Union of Journalists (NUJ) Secretary, Comrade Emmanuel Uzere who is an indigene of the community said, " With this road we now have the presence of Federal Government in our area. Before this project, agrarian activities in this area suffered a lot, and the road has impacted a lot on Uzere people for good." A farmer and an artisan in the community Oghenerobor Ojo have this to say, " We are happy with this road. Before we couldn't get vehicles to convey us to Aviara from Uzere .We needed to trek for two hours but we are happy now we can move our farm produce from farm to different locations. Please , everyone should salute President Muhammadu Buhari for me. " A transporter in the locality, Aghraghra Francis expressed his joy with the project saying " My business as a transporter has improved because I no longer have issues with movement of goods and services due to impassable road." ...
Roads: FG Commission's 33 Kilometre Road Section linking Jigawa - Yobe States It was celebration galore, over the weekend in Jigawa State when the Federal Government commissioned the completed phase 2 (Kirikasama-Nguru) of the Hadejia- Nguru-Gashua road linking Jigawa and Yobe States. The commissioning of the completed section took place over the weekend in Birniwa town, Birniwa local government headquarters in Jigawa State. The commissioning tagged ''Season of Completion and Delivery of Projects' was performed by President Muhammadu Buhari, represented by the Honourable Minister of Water Resources, Engr Suleiman Adamu, FNSE. In his address, the President said, “it is our commitment to improving road transport infrastructure. It is also our determination to improve the ease of doing business, create jobs, wealth and prosperity in order to lift citizens from poverty " President Buhari described the over 33 Kilometre Road, which links Hadejia-Kirikasama in Jigawa State as a very important road that connects agrarian and trading communities, which to a large extent will ease the movement of their farm produce . He said, the road became a critical component of national road network for linking communities together, pointing out that the travel time has now reduced with the completion of the road. Accordingly, the President called on all road users not to abuse the road, pointing out that forms of road abuses such as: overloading of vehicles and trucks accelerates pavement damage, also spilling of petroleum products dissolves all the road components and allows penetration of water, worst still, converting the road shoulders to permanent parking places results in quick onset of road failure from the shoulder. The President pleaded with all road users to take responsibility and play their part in ensuring that they avoid these unwholesome practices, and make every effort to report them when they occur and act in a lawful manner to stop them. " Now that we have this new and well-built road, we owe it as duties to ourselves and to other road users to protect these facilities. One of those duties is to ensure that we drive in accordance with the law as stipulated in the Road Highway Code, " he said. In his remarks, the Minister of Works and Housing, Babatunde Raji Fashola, said that the phase 2 (Kirikasama-Nguru) of the Hadeja-Nguru Federal road project was among the other projects lined up for commissioning in the second phase under the season of completion and impact which started in the last quarter of 2021 The Minister who was represented by the Zonal Director Highway (Construction & Rehabilitation) North West, Engr Wasiu Adetayo Taiwo said the projects represent major investment in road Transport infrastructure, which is a commitment of the Buhari led-administration as a driver for economic growth and prosperity. He described the projects as visible and incontrovertible Assets and as proof of what Nigeria’s resources are being invested into from a combination of earned resources and borrowings. Accordingly, Fashola listed the other roads lined up for commissioning across the geo-political zones to include: Isoko Ring Road (Section II) covering Aviara -Uzere in Delta State; Nguru-Gashua-Bayamari (section I, phase II) covering Nguru-Gashua in Yobe State; Lafia-Obi-Awe-Tunga Road in Nassarawa State, and Gombe -Numan-Yola Road (Phase II) covering Gombe- Kaltungo in Gombe- State. In a welcome address, the Permanent Secretary, Federal Ministry of Works and Housing, Bashir Nura Alkali, represented by the Federal Controller of Works in Jigawa State, Engr. Atewolora Oladele Gabriel, said the project was part of President Muhammadu Buhari’s developmental agenda of addressing road infrastructural development across the length and breadth of Nigeria He said " Federal Government has a policy direction which was focused on the completion of several on-going projects to stimulate economic development, job creation and promoting local content. The focus is to link the major arterial roads to Refineries, Ports, tertiary institutions and high volume commercial centres with a view to reducing travel times, cost of vehicle maintenance, safety and security of commuters, " Alkali disclosed that the Ministry has successfully completed several roads and maintained several bridges to ensure that road users have a rewarding road travel experience, adding that several roads and bridges are at various stages of completion. He listed among other projects: the 2nd Niger Bridge and its approaching road, Dualization of Abuja-Kaduna-Kano, Loko-Oweto Bridge linking Nasarawa to Benue States, dualization of Enugu-Por-Harcourt Expressway, Bodo-Bonny Brigde, and Lagos-Ibadan Dualization projects. In his remark, Jigawa State Governor, Muhammadu Badaru Abubakar, expressed gratitude to the Federal Government for the numerous projects executed by the administration of President Muhamadu Buhari in Jigawa state. Governor Badaru was represented at the occasion by his deputy, Alhaji Umar Namadi . He stated that the road being commissioned today was a nightmare to the people before the intervention of the Buhari's administration, pointing out also the many other roads being constructed by the Federal Government in Jigawa State. " What do we have to say to Mr President. The many interventions by the Federal Government in Jigawa State has improved the lives of the people. Jigawa State is grateful for all the Interventions, including the Social Interventions, N Power, Trader Money etc " he said The Governor also commended the Minister of Works and Housing, Babatunde Fashola for what he described as his commitment in making things happened for the visibility of the Buhari Administration, stating that the Interventions have improved the social lives and economic status of his people. House of Representatives Member representing Kirikasama/Birniwa/ Guri Federal Constituency, the location of the project, Hon. Dr. Abubakar Hassan Fulata , appreciated the Federal Government for the many laudable projects in Jigawa State. Dr. Fulata said " the road project being commissioned today had defied many administrations for almost four decades. The road project budget was alot of money without commensurate result. President Buhari has now completed the road within a reasonable time. We are grateful to Mr President. Jigawa State is grateful for benefiting from the Federal Government's projects" In a goodwill message, the Emir of Hadejia and Chairman Jigawa State Council of Traditional Rulers, His Royal Highness Alh. Adamu Abubakar Maje expressed delight witnessing the commissioning of the project in his Emirate The Emir who was represented by the Galadiman Hadejia, Alh. Usman Abdul'aziz, commended President Muhamadu Buhari for ensuring completion of the project which he described as critical and important to the economy of the society. He said the road was critical and has opened the Hadejia Emirate to Yobe State and by extension to Borno State, adding that other projects such as water project, tomatoes factory and siting of some higher Institutions in the stated were also commendable. "We all know the importance of roads to the economic and social existence of every community and every society. We are grateful for the infrastructural projects. Hadejia Emirate got a large share of it. We also wish and pray for more" he said. In his vote of thanks, the Project Contractor, Mothercat Limited, Fady Khoury Hanna, expressed gratitude to the Federal Government and to the Minister of Works and Housing, Babatunde Raji Fashola, for the ample opportunity given to them to handle the project. Fady appreciated Jigawa and Yobe States Government for their cooperation, hospitality and making them feel at home during the construction, assuring the Federal Government of their commitment to deliver quality work at any time in any project they undertook. Testimonies from the people of the community and road users were also full of commendation and appreciation. Mallam Ali Alaska, a transporter narrated how terrible and difficult the road was before the rehabilitation. He appreciated the Federal Government for the road project. He said that there was no doubt the contractor has done a good work and the travel time has drastically reduced. ...
DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE
DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE
MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1
MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1