Federal Ministry of Works (FMW)
... building the backbone for Development ...
Follow Us:
Welcome To Federal Ministry Of Works.
Minister Federal Ministry Of Works Engr. David Umahi.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Jul
09
2026

LATEST PRESS

UMAHI, EKITI GOVERNOR DISCUSSES STRATEGIC ROAD SECTOR DEVELOPMENT

The Honourable Minister of Works, David Nweze Umahi, CON, FNSE, FNATE, has restated the Federal Government's commitment to equitable infrastructure development across Nigeria, adding that the Renewed Hope administration of President Bola Ahmed Tinubu, GCFR, is ensuring that no state is left behind in the delivery of road and bridge projects. He also attributed the overwhelming support for the ruling party to the visible achievements of President Tinubu's administration, particularly in the area of infrastructure development.
He noted that the President has demonstrated fairness in the distribution of road projects across the 36 states and the Federal Capital Territory, stressing that communities that had previously gotten little or no Federal Government road intervention are now benefiting.

The Minister recalled that during his eight-year tenure as Governor of Ebonyi State, there were no significant federal road projects in the state, adding that similar situations existed in Ekiti and several other states. He commended President Tinubu for changing the narrative through his inclusive approach to nationalist development.

Engr. Umahi assured the Governor that all subsisting contracts in Ekiti State would be executed strictly in accordance with engineering principles and measurements, emphasising that contractors were selected transparently, in line with the Public Procurement Act. He further asserted that the Ekiti State Government would be kept fully informed to enable effective monitoring of project implementation.

He further reaffirmed the Ministry's commitment to delivering durable and high-quality road infrastructure that will enhance economic activities, improve connectivity, and support the Renewed Hope Agenda of President Tinubu.

Speaking earlier, the Governor of Ekiti State expressed profound appreciation to President Tinubu and the Honourable Minister for the numerous road infrastructure interventions in the State.  He recalled that following his appeal to the President, through the Honourable Minister, approval was granted for the reconstruction of the Ado–Iyin–Aramoko road, a project that had remained uncompleted for several years despite repeated promises by successive administrations. He noted that contractors were mobilised to the site within weeks of the approval, demonstrating the President's commitment to prompt project execution.

Governor Oyebanji also stated that the swift commencement of the project generated widespread appreciation among the people of Ekiti State and strengthened public confidence in the Federal Government's commitment to infrastructure development.
He also thanked President Tinubu for approving the construction of the Ado–Ijan–Ikole Road, describing it as another strategic route that will significantly improve transportation and economic activities within the State and beyond.

The Governor disclosed that, since the creation of Ekiti State nearly three decades ago, no administration has demonstrated such a remarkable level of commitment to the state's infrastructure development as the current one. According to him, the people of Ekiti now have a renewed sense of belonging as a result of the Federal Government's numerous interventions in roads and other critical sectors.
Oyebanji described his visit to the Ministry as one of appreciation, conveying the gratitude of the people of Ekiti State to the President and the Honourable Minister for their dedication to improving the nation's road landscape.

The meeting further underscored the strong collaboration between the Federal Government and Ekiti State Government in advancing infrastructure development for the benefit of citizens and national economic growth.
 

Sep
07
2023

"Fight on turning to Concrete is a continuous one - Umahi Engineer David Umahi, the Minister of Works has said that the fight on turning to the use of Concrete Technology in road construction is a continuous one.   The Minister made this statement while on inspection tour of the Rehabilitation of Outstanding Section of Onitsha - Enugu Expressway under the Road Infrastructure Tax Credit Scheme - Contract no 7629 on September 6, 2023.   In an interview with Journalists, he gave reasons for using this concrete technology to be loaded with a whole lot of benefits, as being durable with a life span of over fifty years (50), and that it can stand for these number of years before it will require maintenance more than bitumen imported into the Country that are more of sub-standard which cannot stand the number of expected years, also it's cheaper to build with much local content sourced materials. In his words " I have looked at the cost of bindal cause, the wearing costs on our roads, it is safer doing it on concrete, it's going to be cheaper, Niger Cat are doing it that's why I directed that the right-hand side of the Enugu - Onitsha Expressway be done on concrete".   He directed that Enugu Section lll - Port-Harcourt expressway by Messrs. CGC Nig Ltd also that the second carriage way be totally done on concrete, "we are safer on concrete in the South East and that's what we are going to be doing" he added.   Umahi frowned at the costing of Ozalla - Isu - Onitsha and additional 3km with bridges to cost fifteen billion naira, he instructed that the work be brought back to be looked at. " I saw the road leading to Ozalla - Isu - Onitsha, I'm very shocked that four bridges and 3km additional road is said to be costing fifteen billion, I believe strongly that there's no other way it will cost us more than three - four billion.   He made it known that contractors should stay aside when budget is too expensive and budgeting process is low because it's unhealthy for the contractor. " What I want to do when a budget is too expensive and budgeting process is very low, the contractors can stay aside like what we are witnessing ten to fifteen years, it's not healthy for the contractor, because he is losing money on equipment and maintaining the work".  "Ogbulafor - Okalagun roads because it was awarded in 2010, the whole shoulders are gone".   Earlier, the contractor while explaining the work, said it will be completed by April 2025 and also that there was no problem of funding. ...

Sep
07
2023

FG Orders the Completion of Carriage Ways Before Working on Spurs... The Honourable Minister of Works, Senator Nweze David Umahi has directed the contractors working on Federal roads in the South East Region to concentrate on the completion of carriageways first before working on the spurs to ensure the speedy completion of the project for use.   He made the declaration at the inspection of the construction of the Enugu – Onitsha Expressway in Enugu and Anambra States by MTN Nigeria Communication Plc, The Rehabilitation of Old Enugu – Onitsha Road (Opi Junction – Ukehe – Okpatu – Awhum, Abor –Udi – Oji to Anambra border and many other road construction projects at the ongoing inspection tours of all the federal roads project going on in the region.   The Minister ordered that the remaining portion of the roads still under construction be done using concrete pavement as he noticed that some of the road shoulders are already cracking because the quality of bitumen in use is of low quality and adulterated.   “I will allow the portions already laid with asphalt but the failing road shoulder should be replaced with concrete carriage, I know what I am saying, the quality of bitumen in this country is low and adulterated. We will not give up the fight till we get to the level where after construction, the road stays for 30 – 50 years before we talk of maintenance” he said.   Umahi maintained that the use of concrete technology in road construction is cheaper, safer and reduces the longer time contractors have to stay on site trying to patch failed portions after the project completion, and that with the use of concrete pavement, no one goes back to check if the road is failing or not because road failure when concrete is in use is laughable.   “It is safer doing it on concrete and cheaper, I believe strongly that when a project is so expensive it keeps the contractor a longer time on site because he will keep delaying to get all his payment meanwhile there is no money to pay him so he keeps staying on site doing nothing.   The Minister directed all contractors that have left their site because of payment to quickly and immediately move back to site or he will terminate the contract noting that the monies released already to the contractors from what he was told is supposed to complete the carriageways before requesting for additional money.   “I am optimistic that the money available will complete the work, come with your bill of quantity so we review it and give you proper directive, move back to site immediately to continue your work within 7 days or I terminate the contractor, you cannot say we are owing you and because of that you stop work” He said”.   Umahi promised the contractors that availability of fund is not going to be a challenge when they do their own part.  He added that he will be meeting with the funding partners and the one being financed through appropriation, all will be given attention.   “You said there is no money to complete the project, it is my duty to chase the debt, it is yours to go back to site.  I guarantee that the money will be paid, I will meet with the financers and we will do what we are supposed to do”.   The Minister demanded that the Director Highways South East, Engr. Bede Obioha brings up the entire project for review to see how they will put ideas together to ensure that all the outstanding projects be completed and be open for usage.   During his briefing, the Operations Manager, Niger Cat Construction Company Ltd. Engr. Fadi Mosaad welcomed the Minister and commended the Minister’s directives on the use of concrete pavement saying it’s going to help considering the soil texture and the terrain of the zone.   The projects visited are: Rehabilitation of old Enugu – Port Harcourt Road (Agbogugu – Abia Border spur to Mmaku, Rehabilitation of Oji – Achi – mmaku – Awgu – Ndeabgor Road section 1 in Enugu State, Construction of Ugwueme – Nenwenta – Mkwe – Ezere – Awunta – Obeagu – Mgbidi Nmaku Road in Enugu State, construction of Enugu – Onitsha Expressway in Enugu and Anambra States, The Rehabilitation of Old Enugu – Onitsha Road (Opi Junction – Ukehe – Okpatu – Awhum, Abor –Udi – Oji to Anambra. ...

Sep
05
2023

The Ongoing Rehabilitation of Ozalla - Akpugo - Amagunze - Ihuokpara - Nkomoro - Isu - Onicha (Enugu - Onitsha) With A Spur to Onunwere in Enugu State Is Commendable - Umahi Minister of Works Engr. Dave Umahi has commended the ongoing rehabilitation of Ozalla - Akpugo -Amagunze - Ihuokpara - Nkomoro - Isu - Onitsha (Enugu - Onitsha) with a spur to Onunwere, Enugu State, by Arab contractors Nigeria Limited.   The Minister made the commendation while on inspection tour of the road on Tuesday September 5, 2023.   He pointed out some faults on the road to be as a result of using bad asphalt which led to the failure of the road, so the contractor has been directed to go back, redesign 1.6 kilometer and ensure the needed attention on rigid pavement on the right-hand side.   While addressing Pressmen, Umahi, attributed the major problem to be funding. In his words, "but I will acknowledge that our major problem is the issue of funding, there is no way any annual budget can fund it with Sukuk, it's difficult. So, we have to work out issues and see how we can source for the money". He added.   In his address, Director Highways in charge of the South East, Engr. Bide Obioha shed more light on the contract work. ...

First First First

LIVE ACTIVITY FEED

PUBLIC ANNOUNCEMENT


Nov
03
2025

  


OTHER NEWS

May
31
2018

Abeokuta Substation Gets New 60MVA Transformer To Improve Electricity

The yearning to ensure qualitative and stable power to Nigerians has made the Federal Government to upgrade the 132/33KVA Abeokuta Transmission Substation with the installation of a new 60 Mega Volt Ampere (MVA) capacity transformer to boost electricity supply in Abeokuta and its environs.

Addressing the Minister of State II Power, Works and Housing, Surveyor Suleiman Hassan Zarma, who was on an inspection tour to the substation recently, the Assistant General Manager Transmission, Papalanto Sub – Region of the Transmission Company of Nigeria (TCN), Engr. Adeonipekun Adesina said the transformer upon its complete installation would complement the three existing ones at the station.

According to him, the station has 3 transformers of 30MVA each, making a total of 90MVA. But with the new one, the station will now have a 150MVA wheeling capacity.  “It used to be a 90MVA Substation. But with the introduction of the new transformer, there will be more power to deliver to the masses and there will be steady supply of electricity”, Adeonipekun said.

Adeomipekun disclosed that the transformer when energized, would improve power supply to Abeokuta Township, Imeko, and Lagos Road, part of Sagamu and University of Agriculture, Abeokuta. In his address, the Minister re-affirmed the Federal Government’s commitment to increasing power supply in the country. Saying “the Federal Government is investing in the expansion of transmission capacity through the TCN by building more substations and expanding existing ones”, adding that the transformer which is installed by the Transmission Company of Nigeria (TCN), under the National Integrated Power project (NIPP) of the Federal Government is aimed at driving the industries, boosting the economy, creating employment opportunities to our teaming youth in Abeokuta and the country in general.

Speeches

Sep
25
2016

Keynote Address Presented At The 32nd Annual Conference And General Meeting Of The African Union For Housing Finance (AUHF)

Theme: Housing and Africa’s Growth Agenda at PDTF Centre, Central Business District, Abuja, 14th -16th September, 2016. By The Honourable Minister of Power, Works & Housing; Babatunde  Raji  Fashola, SAN.

Protocols

I am delighted to address you on the occasion of this 2016 Annual Conference and General Meeting of the African Union for Housing Finance (AUHF) holding in Abuja, Nigeria. The political will and momentum of the present administration in her housing sector agenda are further invigorated by this conference taking place few months after the June 2016 National Housing Summit. You will recall that the outcome of the recent National Housing Summit identified Housing Finance as one of the major pillars necessary for realizing Affordable housing delivery in Nigeria apart from others like Land, Concessions/incentives, Off-taker Strategy and General Skills Acquisition. It is indeed, heartwarming and reassuring to note that AUHF is an association of Mortgage Banks, Building Societies, Housing Corporations and other organizations involved in mobilizing funds for housing on the African continent. Also that the goals of AUHF includes promoting and facilitating housing finance and unlocking its multiplier effects on National economies, hence leading to Africa’s economic growth. I understand that the Conference attracts stakeholders from across the African Continent, all with the purpose of advancing investment in affordable housing.

2. Let me begin by thanking the Nigerian Mortgage Refinance Company (NMRC) and other partners for hosting this important conference. The hosting of AUHF 2016 conference in Nigeria could not have come at a more auspicious time than now that Nigeria needs aggressive unleashing of new housing finance investments and opportunities. I will also like to thank all the stakeholders and experts from Africa and around the world for coming together to proffer solutions to the age long challenge of providing housing finance for Africans, especially Nigerians that are facing harsh economic challenges.

3. Housing, we know is critical to every human development and fundamental right of every citizen. Therefore, Housing is central to this Administration’s policy thrust. However, housing a population of over 180 million is an arduous task that cannot be left for Federal Government alone, especially now that the Government’s revenue and the economy is  under pressure.  The fund to support the construction and mortgages for the end-users is a big challenge for the government. The production cost versus the selling price of the present housing stock is beyond the reach of majority of Nigerians.  Demand for affordable housing has grown over the years as a result of population explosion, rural-urban drift and search for higher quality of life. This demand has rapidly overwhelmed the supply capacity of existing Government resources. Many years of inadequate investment and poor maintenance culture have left Nigeria with a significant housing deficit which is slowing down the country’s development and economic growth and will clearly require close collaboration from stakeholders like the AUHF. The above demanding task is the mandate of my Ministry, Federal Ministry of Power, Works and Housing. Therefore, all stakeholders especially the Private sector and AUHF must play major role in this process of creating innovative housing finance in Nigeria.

4. Every Nigerian’s dream is to have a roof over their head! Hence, for an average Nigerian "owning a house" is a mark of economic success and security.  Housing is also believed to be a long term investment that protects that investment against high inflation and the unpredictable economic down turn. Therefore, provision of housing is a major tool to reduce corruption. Why is it so difficult for the average Nigerian to realize this dream? Lack of Housing Finance in the public and corporate institutions and double digit housing loans are the major culprits while others include land for housing, population explosion, high cost of building materials, inflation that brings about unemployment and decreased purchasing power of the low and medium income earners.

5. The major housing Finance trends and developments in the Nigerian market can be summarized by tracing the historical tendency of the influence of the financial sector in the housing industry. In 1956, a Secondary Mortgage Institution called Nigerian Building Society (NBS) assumed the role of the main conduit for housing finance delivery. NBS was a British and Nigeria partnership arrangement. Nigeria’s housing finance development can be classified under major political periods, namely pre-independence (1914-1960), post-independence (1960-1979) and a second and subsequent civilian administrations (1979 to date). However, the mortgage institutions decree No. 53 of 1989 led to the establishment of the following; Primary Mortgage Institutions (PMI) as mortgage savings for on-lending property development and mortgage creation. And, the Secondary mortgage institution, the Federal Mortgage Bank of Nigeria (FMBN), to function as the Apex mortgage institution for regulation.  While the National Housing Policy of 1991 was a bold step by the Federal Government of Nigeria to address the challenge of lack of finance for housing development and mortgage.  The National Housing Fund (Act. No. 3) of 1992 is a collating reservoir of long term funds in terms of monthly contributions from workers in the public and private sectors. Unfortunately, most Nigerians see mortgage loans from Government as part of their share of the "national cake" leading to high default rates. This has forced the Government to encourage prospective home owners to approach commercial banks who regrettably have high interest rates.  Thus, the Government who is supposed to be a major player in the provision of homes is now seemingly not on the frontline. The Government established the Nigerian Mortgage Refinancing Company (NMRC) to help in reducing the cost of mortgage loan by improving market efficiency.

6. From the inception of Government initiative in organized housing finance system to date, only a meager sum have so far been injected to the system. This accounts for less than 0.5% of the Gross Domestic Product (GDP) as compared to other climes (like United Kingdom, South Africa etc) due to the inability of financial systems in providing low cost finance that meets the need of low and medium income earners. Therefore, the Secondary Mortgage institution (FMBN) should be strengthened by ensuring full compliance with the National Housing Funds (NHF) Act by affected stakeholders, like the Central Bank, commercial banks, insurance companies, Mutual and Trust Fund administrators.  However, I am happy to note that with the greater participation of the private sector in housing and embracing the new initiatives of this Administration, the journey to sustainable housing delivery is on course.

7. Ladies and Gentlemen, it may interest you to note that the current Administration has taken cognizance of the housing sector as an important area requiring priority attention for reinvigoration and revitalization. This accounts for the appreciable budgetary allocation to the sector in the current annual estimate. This vision is increasingly being energized by the Federal Ministry of Power, Works and Housing. Only recently, the Ministry organized a National Housing Summit, where stakeholders met and examined the numerous constraints militating against the provision of affordable housing in Nigeria and proffered a clear, sustainable and strategic blueprint to mitigate same. Identified as a critical factor in the provision of affordable housing was lack of access to construction finance by developers including high risk in current mortgage finance structure which does not support the buying-off of houses to enable developers recoup their investments on time. The Summit resolved that there was need for necessary machinery to be put in place to promote appropriate construction finance schemes. AUHF members are hereby challenged in this regard. In the summit also, various definitions of affordable housing were adduced. However, the consensus from these definitions revealed that there is no one-size-fit all definition for Affordable Housing. The indices that should be used for defining Affordable Housing would include Segregation, Stratification, Classes of people and their income bracket, not more than one-third net household income of the target group and equity contribution of end-users.

8. I am happy to note that despite the challenges that housing delivery has encountered in the country over the years, the renewed vigor and policy re-orientation of this Administration have set the agenda for Housing revolution. In this regard, the Ministry has produced six (6) designs of one bedroom, two-bedroom, three-bedroom flats, bungalows and condominiums that will represent the Nigerian House which responds to our cultural diversity. Another key area of achievement is the pursuit and promotion of local content and standardization of building components such as doors, windows, tiles, roof boards and other accessories to be produced by local manufacturers as part of our support for local industries SMEs and in pursuit of diversification and job creation. Effort is already being made to embrace and deploy modern technology to mass production of housing in all the States of the Federation and FCT using the Traditional procurement platform and the Contractor Finance Initiative model, to reduce the housing deficit.

9. To make the Housing Sector attractive, viable and stimulate growth, the present Administration plans to de-risk lending to approved Housing Developers. This will entail the government providing guarantees and other credit enhancement to developers. Government therefore plans to issue promissory notes to reduce Developers financing requirements. Government recognizes that provision of leverage and guarantees are critical in attracting private sector funds into the industry thereby creating thousands of affordable houses each year as well as generate considerable employment and commercial activities. These are some of the far reaching contribution of the Finance Minister during the Housing Summit.

10. Ladies and Gentlemen, I wish to state here that much discussion has been held on the housing deficit. There is therefore need to change the story to begin to discuss the housing opportunities. Regardless of issues facing the sector, real estate projects are increasingly being launched and completed in Nigeria. With the present Administration’s many incentives, new investors are expected in the market to continue to deliver positive results.

11. It is on this note that I call on all stakeholders, especially members of the African Union for Housing Finance here present to join hands with the Federal Government towards the realization of its objectives in providing affordable housing to the people. As agent of change, members are enjoined to borrow a leaf from Nigeria and influence their respect home governments to domesticate or localize their housing options to reflect the peculiarities and expectations of the people as well as provide the private sector the needed impetus to invest in the sector.

12. Finally, I wish to state that though the challenges to the sector are real and obvious, we are convinced that with the renewed commitment of this Administration, coupled with strengthened collaborations with all stakeholders in the industry, the desired revolution in the housing sector will be achieved in not too distant future.

13. I wish you all very engaging and thoughtful deliberations and thank you for listening.

PHOTO NEWS

Jun
02
2025

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

Click To View More Pictures

PHOTO NEWS

Apr
28
2025

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

Click To View More Pictures