Federal Ministry of Works (FMW)
... building the backbone for Development ...
Follow Us:
Welcome To Federal Ministry Of Works.
Minister Federal Ministry Of Works Engr. David Umahi.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Mar
07
2026

LATEST PRESS

National Media Tour: FG Intensifies Renewed Hope Agenda with Strategic Road Projects Across Nasarawa State

The Federal Government has reaffirmed its intention to improve road infrastructure across the country as part of efforts to enhance economic growth, connectivity, and ease of movement for Nigerians. This assurance was reiterated during the continuation of the Federal Ministry of Works’ nationwide media tour and commissioning of emergency and special intervention projects in Nasarawa State.

Speaking during the tour, the Director of Information and Public Relations of the Federal Ministry of Works, Mal. Mohammed A. Ahmed, stated that the projects are part of the Federal Government’s strategic efforts to rehabilitate critical sections of its road network under the leadership of President Bola Ahmed Tinubu, GCFR. He explained that upon assuming office in May 2023, the present administration inherited 2,064 ongoing road projects, many of which had been abandoned due to funding challenges, and an inherited debt burden of about ₦13 trillion.

According to him, the Federal Government consequently prioritised 260 emergency and special intervention projects across the country to address critically failed sections of federal roads and areas affected by flooding and other natural disasters.
“These projects were initiated to quickly restore critical road and transport links to ensure seamless movement of people, goods, and services across the country,” Ahmed said.
He noted that the intervention projects are being executed under the leadership of the Honourable Minister of Works, Senator Engr. David Umahi, CON, FNSE, FNATE, is part of the administration’s broader infrastructure development drive under the Renewed Hope Agenda.

One of the projects commissioned during the tour was a 6-kilometre section of the road linking Agyaragu town to Sabon Kwara in Keana Local Government Area, Nasarawa South Senatorial District, Nasarawa State. The contractor, A.A. Albasu (Nigeria) Limited, commenced construction in November, 2022 and completed it in November, 2023. The project forms part of a 10.5-kilometre corridor serving the surrounding communities.

The construction works included earthworks, excavation and removal of existing culverts, and excavation to the required depth to receive blinding. Other works carried out include the provision of pipe culverts and lined drains, 200mm thick naturally occurring lateritic sub-base course materials, 100mm thick crushed stone base course, asphaltic concrete wearing course, surface dressing on shoulders, and lane markings.

Providing technical details of the project, the Federal Controller of Works in Nasarawa State, Engr. Ishaku Mamri, explained that the road had previously been in a deplorable condition, causing significant hardship for road users, residents, and traders, who rely on the route to transport goods and access nearby towns. He disclosed that the rehabilitated section was constructed to a standard width of 7.3 metres with shoulders, and that it includes approximately 4 kilometres of drainage infrastructure to ensure durability and effective water management. “The road was awarded in November, 2022 and completed in 2023. It has since been in use by the community and has significantly improved movement within the area,” he added. Engr. Mamri noted that residents have expressed appreciation for the intervention, while also appealing for the completion of the remaining four (4) kilometres of the alignment.

As part of the Media Tour, Engr. Ahmed Tijjani Aminu, a representative of the Council for the Regulation of Engineering in Nigeria (COREN), and the Chairman of the Nigerian Society of Engineers (NSE), Lafia Branch, Engr Simon Obagu were present. Also present was the Chairman of the Nigeria Union of Journalists (NUJ), Nasarawa State Council, Comrade Salihu Mohammed Alkali, who performed the official commissioning of the project, on behalf of the Honourable Minister of Works.

The media tour also included a visit to the ongoing Lafia Bypass project site, a 15.8-kilometre alternative route designed to ease traffic congestion within Lafia metropolis by providing a faster corridor for commuters travelling between Abuja, Makurdi, and the eastern parts of the country.

According to the Project Engineer for Messrs China Harbour Engineering Company (CHEC), Engr. Tijani Olalekan, the contract, which had previously stalled after being awarded by the past administration, fully recommenced in February, 2024 under the current administration and has now reached over 80 percent completion. It is expected to be completed before the end of the year.

The scope of work includes site clearance and earthworks, construction of hydraulic structures, sub-base, stone base, stone pitching, lined drains, asphaltic concrete binder course, as well as the relocation of electrical poles along the project’s corridor.

The Commissioner of Works, Housing, and Transport, Nasarawa State, Hon. Mu’azu A. Gosho, commended the contractor for the quality of work. Also present were the Chairman of the Nigerian Society of Engineers (NSE), Lafia Branch, Engr. Simon Obagu, Engr. Ahmed Tijjani Aminu, representing COREN; the NUJ Chairman in Nasarawa State, Salisu Mohammed Alkali; and community members, who all expressed satisfaction with the quality of the work executed.

At the Nasarawa–Toto axis, officials also visited ongoing rehabilitation works on the Keffi–Nasarawan Toto–Abaji road, a strategic route aimed at improving connectivity between the Federal Capital Territory, Nasarawa, and other neighbouring states.
The Controller explained that the road project, originally awarded in 2018, experienced delays due to inadequate funding but has since gained momentum following renewed commitment from the Federal Government.

The FCW further revealed that the project has been restructured into phases, with the initial Phase 1 nearing completion under the 2025–2026 budgetary provisions, while Phase 2, involving concrete pavement construction is set to commence, soon. The Federal Government recently approved the second phase of the project covering approximately 129.3 kilometres at a cost of about ₦203 billion, further underscoring the administration’s commitment to strengthening the nation’s road and transport infrastructure.

The Project Manager, Mr. William, as well as the Site Engineer, Engr. Daniel Aleyemi, assured the team of quality work, while expressing optimism that the project would be completed before the end of the month.

The Director of Information and Public Relations emphasised that road infrastructure development remains a central pillar of President Tinubu’s Renewed Hope Agenda, particularly under the priority area focused on expanding and improving the national infrastructure. He noted that the administration is also advancing four (4) Legacy Road Projects, including the Lagos–Calabar Coastal Highway, the Sokoto–Badagry Super Highway, the Calabar–Abuja Super Highway, and the Dualisation of Akwanga–Jos–Bauchi–Gombe Road, all aimed at transforming connectivity and stimulating economic development across the six (6) geopolitical zones of the country. All the roads will be on concrete pavements with solar street lighting and railways.

The nationwide media tour, he added, is designed to promote transparency, allow journalists and professional bodies to verify the quality of ongoing works, and enable Nigerians to see firsthand the progress being made in the delivery of critical infrastructure.

The Federal Government reiterated its commitment to sustaining the momentum in road construction, reconstruction, expansion, and rehabilitation to support economic growth, national integration, and improved quality of life for Nigerians.

Mohammed A. Ahmed
Director, Information and Public Relations.
7 March, 2026.

Nov
13
2019

Road: Trans Sahara Committee Inspects Roads Within Nigerian Territory The Trans-Saharan Road Liaison Committee (TRLC) has inspected some of the road projects within the Nigerian territory as part of activities lined up for the 70th session of the committee which took place in Abuja, Nigeria from the 11th -12th of November 2019 The Member countries of the TLC are; Niger, Mali , Algeria Chad ,Tunisia and Nigeria. Nigeria's Minister of Works and Housing, Mr. Babatunde Raji Fashola,SAN who conducted his colleagues round the project sites said “ it is the tradition of the committee that the host country should take other members on inspection of the road projects under its territory in order to see level of progress and compliance on the routes. Fashola explained that Nigeria accounts for over 1000 kilometets length out of the over 9000 kilometers roads in the six sub-saharan countries. He further explained that in compliance with the local content executive order, Nigerian companies are given preference over foreign companies in the award of the contracts. Accordingly the Minister also stated that there were nine highways at different levels of construction that would connect Nigeria with the rest of Africa along the Trans-Sahara routes, pointing out that the ultimate aim was to transform those roads to highways of vehicles and trucks to link them to the ports for ease of doing business. The Minister listed Lagos - Algiers as one of such routes that would connect Nigeria with other parts of Africa, saying that the route cuts across Lagos-Ibadan, Oyo , Ogbomosho, Ilorin, Jebba , Mokwa, Kaduna and Kano leading to the Niger Republic. The team inspected the rehabilitation works of Abuja-Kaduna-Zaria-Kano dual carriageway which is being handled by Julius Berger Nig Ltd, the 5.4Km Abuja –Keffi expressway and dualisation of Keffi-Akwanga -Lafia-Makurdi road being handled by China Harbour Engineering Company Limited. The delegation from the member countries on the inspection commended Nigerian Government for the local content policy in the construction industry, hoping that such could be replicated in other member countries. ...

Nov
12
2019

Reconstruction of Trans Sahara Highways within Nigerian Territory in Advanced Stage - Fashola Honourable Minister of Works and Housing,Mr. Babatunde Raji Fashola SAN, has disclosed that the reconstruction of the major highways that link Nigeria's borders with the six member states of the Trans Sahara Road namely: Chad, Niger, Tunisia, Mali and Algeria is 80% asphalted. Fashola made the disclosure at the opening  ceremony  of the 70th session and meeting of the Trans Sahara Road Liaison Committee (TRLC) which Nigeria is hosting in Abuja. The ministers in charge of roads in the six countries are taking part at the meeting. The objective of the meeting of the TRLC member countries was to discuss and share knowledge on how to improve African connectivity, integration and trade. Fashola  noted that the over 9000 kms Trans Sahara Road Which  serves about 37 regions in Africa and  connects about 74 urban cities and 60 million people across six countries if completed would create immense opportunities in Agriculture, information technology  and  the fashion industry among others, adding that most of the roads that were plied by horses and carmels are presently motorable. According to the Minister, “Now if you appreciate that these roads,  roads of horses and camels are now the roads of vehicles and trucks, you can imagine the opportunities that lie ahead as we converge here.” He further noted that Nigeria is part of the large urban network of opportunity as the rehabilitation and reconstruction of the Trans Sahara Road would intensify cultural and economic exchange of goods and services across the African region. Accordingly, the Minister also stated that the reconstruction  of these  major roads are due to their busy nature, adding that heavy duty trucks of about 5000 in number ply  these roads on a regular basis. He listed some roads in the trans sharan route such as:  the Abuja- Kaduna- Kano , Lagos - Ibadan-Ilorin-Jebba among others  which are at different stages of completion. In an address by the  President of the Federal Republic of Nigeria, Muhammadu Buhari delivered by his representative, the Minister of Police Affairs Alhaji Mohammed Dingyadi,the Mr.President reiterated the  committment of his administration to introduce change in Nigeria geared towards a sustainable and quality infrastructure development to drive economic development and job creation. He explained that  provision of  road infrastructure was meant to increase Nigeria’s trunks of roads  to ease the cost and time of doing business and improve  economic competiveness in Nigeria's  Economic Recovery Growth Plan (ERGP). The President, however, maintained that his administration “shares the vision of the Trans Sahara Road Liaison Committee to develop the section of the Trans Sahara road within their respective territories.” The President also charged the delegates attending the meeting to remain committed to the prompt delivery of the crucial development of road transport infrastructure for the benefit of the people in member states. In his address, the Secretary General of the Trans Sahara Road Liaison Committee, Mr. Ayadi Mohammed, commended President Muhammadu Buhari,  the Honourable Minister for Works and Housing Babatunde Raji Fashola SAN ,the Honourable Minister of State for Works and Housing, Engineer Abubakar Aliyu and the management and staff of the Federal Ministry of Works and Housing for their hospitality and reception given to the delegates. He added that the member countries of the Trans Sahara and Committee have the task to build excellent relationship that would stimulate trade in the region. ...

Nov
02
2019

Mobolaji Johnson : Fashola  Mourns Passage Of An Illustrious Pioneer The Minister of Works and Housing, Mr Babatunde Fashola SAN has expressed deep sadness and condoled with the Government and people of Lagos State over the death of the first Military Governor of the State, Brigadier- General Mobolaji Johnson. Fashola, who served for two tenures as the 13th Governor of Lagos State from 2007 – 2015, described General Johnson as an illustrious pioneer, a man of singular vision, integrity and unwavering duty   whose loss is “one that is shared by an entire nation.” According to the Minister, “General Johnson was a dedicated soldier and public servant and a loving husband and father. As the first governor of the newly created Lagos State in 1967, he faced immediate challenges in leading a restive federal capital territory. He handled those challenges with tremendous courage and unwavering grace.” Noting that the late elder statesman established a strong administrative structure for the State, Fashola declared : “Beyond governing a state which was at the heart of a divisive national civil war, General Johnson was an administrative trailblazer. Along with key civil servants like Adeyemi-Bero and Folarin Coker, he laid a template for civil service practices and procedures which set Lagos State apart as a centre of excellence.” Recalling his appeal, as Governor, during the launch of the Biography  of the late Brigadier Mobolaji Johnson titled, Lagos State-My Life of Service with Integrity, in 2010, that past leaders should document their periods of Stewardship, Fashola noted that such documentation that showed the great infrastructural strides like how the Lagos City Hall was built, how the Badagry Expressway was constructed, how the Adeniran Ogunsanya Shopping Complex was built, among several others would serve as inspiration to future leaders that things were successfully done before and could still be done again. Fashola said he would personally miss the wise counsel and support of GeneralJohnson. “During my own tenure as Lagos State Governor, General Johnson was always ready with counsel and advice. If there was any public event or occasion regarding the welfare of the state, his towering figure was certain to be found present,” he said.¥ “On behalf of my wife, Abimbola, we extend our deepest condolences to his entire family. His loss is one that is shared by an entire nation,” Fashola said. ...

First First First

LIVE ACTIVITY FEED

PUBLIC ANNOUNCEMENT


Nov
03
2025

  


PHOTO NEWS

Jun
02
2025

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

Click To View More Pictures

PHOTO NEWS

Apr
28
2025

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

Click To View More Pictures