National Media Tour: FG Intensifies Renewed Hope Agenda with Strategic Road Projects Across Nasarawa State The Federal Government has reaffirmed its intention to improve road infrastructure across the country as part of efforts to enhance economic growth, connectivity, and ease of movement for Nigerians. This assurance was reiterated during the continuation of the Federal Ministry of Works’ nationwide media tour and commissioning of emergency and special intervention projects in Nasarawa State. Speaking during the tour, the Director of Information and Public Relations of the Federal Ministry of Works, Mal. Mohammed A. Ahmed, stated that the projects are part of the Federal Government’s strategic efforts to rehabilitate critical sections of its road network under the leadership of President Bola Ahmed Tinubu, GCFR. He explained that upon assuming office in May 2023, the present administration inherited 2,064 ongoing road projects, many of which had been abandoned due to funding challenges, and an inherited debt burden of about ₦13 trillion. According to him, the Federal Government consequently prioritised 260 emergency and special intervention projects across the country to address critically failed sections of federal roads and areas affected by flooding and other natural disasters. One of the projects commissioned during the tour was a 6-kilometre section of the road linking Agyaragu town to Sabon Kwara in Keana Local Government Area, Nasarawa South Senatorial District, Nasarawa State. The contractor, A.A. Albasu (Nigeria) Limited, commenced construction in November, 2022 and completed it in November, 2023. The project forms part of a 10.5-kilometre corridor serving the surrounding communities. The construction works included earthworks, excavation and removal of existing culverts, and excavation to the required depth to receive blinding. Other works carried out include the provision of pipe culverts and lined drains, 200mm thick naturally occurring lateritic sub-base course materials, 100mm thick crushed stone base course, asphaltic concrete wearing course, surface dressing on shoulders, and lane markings. Providing technical details of the project, the Federal Controller of Works in Nasarawa State, Engr. Ishaku Mamri, explained that the road had previously been in a deplorable condition, causing significant hardship for road users, residents, and traders, who rely on the route to transport goods and access nearby towns. He disclosed that the rehabilitated section was constructed to a standard width of 7.3 metres with shoulders, and that it includes approximately 4 kilometres of drainage infrastructure to ensure durability and effective water management. “The road was awarded in November, 2022 and completed in 2023. It has since been in use by the community and has significantly improved movement within the area,” he added. Engr. Mamri noted that residents have expressed appreciation for the intervention, while also appealing for the completion of the remaining four (4) kilometres of the alignment. As part of the Media Tour, Engr. Ahmed Tijjani Aminu, a representative of the Council for the Regulation of Engineering in Nigeria (COREN), and the Chairman of the Nigerian Society of Engineers (NSE), Lafia Branch, Engr Simon Obagu were present. Also present was the Chairman of the Nigeria Union of Journalists (NUJ), Nasarawa State Council, Comrade Salihu Mohammed Alkali, who performed the official commissioning of the project, on behalf of the Honourable Minister of Works. The media tour also included a visit to the ongoing Lafia Bypass project site, a 15.8-kilometre alternative route designed to ease traffic congestion within Lafia metropolis by providing a faster corridor for commuters travelling between Abuja, Makurdi, and the eastern parts of the country. According to the Project Engineer for Messrs China Harbour Engineering Company (CHEC), Engr. Tijani Olalekan, the contract, which had previously stalled after being awarded by the past administration, fully recommenced in February, 2024 under the current administration and has now reached over 80 percent completion. It is expected to be completed before the end of the year. The scope of work includes site clearance and earthworks, construction of hydraulic structures, sub-base, stone base, stone pitching, lined drains, asphaltic concrete binder course, as well as the relocation of electrical poles along the project’s corridor. The Commissioner of Works, Housing, and Transport, Nasarawa State, Hon. Mu’azu A. Gosho, commended the contractor for the quality of work. Also present were the Chairman of the Nigerian Society of Engineers (NSE), Lafia Branch, Engr. Simon Obagu, Engr. Ahmed Tijjani Aminu, representing COREN; the NUJ Chairman in Nasarawa State, Salisu Mohammed Alkali; and community members, who all expressed satisfaction with the quality of the work executed. At the Nasarawa–Toto axis, officials also visited ongoing rehabilitation works on the Keffi–Nasarawan Toto–Abaji road, a strategic route aimed at improving connectivity between the Federal Capital Territory, Nasarawa, and other neighbouring states. The FCW further revealed that the project has been restructured into phases, with the initial Phase 1 nearing completion under the 2025–2026 budgetary provisions, while Phase 2, involving concrete pavement construction is set to commence, soon. The Federal Government recently approved the second phase of the project covering approximately 129.3 kilometres at a cost of about ₦203 billion, further underscoring the administration’s commitment to strengthening the nation’s road and transport infrastructure. The Project Manager, Mr. William, as well as the Site Engineer, Engr. Daniel Aleyemi, assured the team of quality work, while expressing optimism that the project would be completed before the end of the month. The Director of Information and Public Relations emphasised that road infrastructure development remains a central pillar of President Tinubu’s Renewed Hope Agenda, particularly under the priority area focused on expanding and improving the national infrastructure. He noted that the administration is also advancing four (4) Legacy Road Projects, including the Lagos–Calabar Coastal Highway, the Sokoto–Badagry Super Highway, the Calabar–Abuja Super Highway, and the Dualisation of Akwanga–Jos–Bauchi–Gombe Road, all aimed at transforming connectivity and stimulating economic development across the six (6) geopolitical zones of the country. All the roads will be on concrete pavements with solar street lighting and railways. The nationwide media tour, he added, is designed to promote transparency, allow journalists and professional bodies to verify the quality of ongoing works, and enable Nigerians to see firsthand the progress being made in the delivery of critical infrastructure. The Federal Government reiterated its commitment to sustaining the momentum in road construction, reconstruction, expansion, and rehabilitation to support economic growth, national integration, and improved quality of life for Nigerians. Mohammed A. Ahmed
“These projects were initiated to quickly restore critical road and transport links to ensure seamless movement of people, goods, and services across the country,” Ahmed said.
He noted that the intervention projects are being executed under the leadership of the Honourable Minister of Works, Senator Engr. David Umahi, CON, FNSE, FNATE, is part of the administration’s broader infrastructure development drive under the Renewed Hope Agenda.
The Controller explained that the road project, originally awarded in 2018, experienced delays due to inadequate funding but has since gained momentum following renewed commitment from the Federal Government.
Director, Information and Public Relations.
7 March, 2026.
HONOURABLE MINISTER OF WORKS, SUCCESSFULLY REPAIRS AND REOPENS THE FAILED SECTION OF INDEPENDENCE BRIDGE LAGOS, INTRODUCES POLICY OF STAKEHOLDER ENGAGEMENT/FEEDBACK MECHANISM BEFORE APPROVAL FOR CLOSURE OF FEDERAL ROADS NATIONWIDE In keeping with the abiding sense of responsibility and proactiveness of the Renewed Hope administration of the President of the Federal Republic of Nigeria, His Excellency, Bola Ahmed Tinubu, GCFR the Honourable Minister of Works, His Excellency, Sen. Engr. Nweze David Umahi, CON has fixed the failed section of Independence bridge, Lagos, which was closed for repairs on 2nd April 2025, and which closure caused untold hardship to Lagosians due to gridlock, necessitating the visit of the Honourable Minister of Works on 3rd April 2025 less than 24 hours of the incident. In his speech to mark the opening of the bridge for traffic, the Honourable Minister said it was God's grace and enablement that informed the timeous success recorded in fixing the bridge. He noted that the reason for the closure of the bridge was not for pleasure but for a technical failure of the approach slab, which affected the strength and utility of the bridge. He, however, expressed displeasure that the right procedure for the closure was not followed, and that was the reason why the public was taken unawares. He said, "So, the reason for the closure was not for pleasure. It was because it became very dangerous for commuters to use the place. But we didn't do it in the right way. And now, we had a design for the project, and I've looked at the design that we intended to use by using God's wisdom and grace and experience, and we have agreed to redesign the project. It's going to be redesigned as one span in a bridge." He thanked Mr. President for his purposefulness in leadership that inspires passion, responsiveness, and proactiveness in handling matters that affect Nigerians. He also thanked the Governor of Lagos State, the engineers of the Federal Ministry of Works in Lagos, the contractor handling the bridge repair (Buildwell Nig Ltd), and Hitech Nigeria Ltd. for their cooperation and support and assistance that saw to the successful reopening of the bridge. He equally thanked Lagosians, the press and other well-meaning Nigerians and stakeholders who showed concern over the plight of Nigerians affected by the closure of the bridge. He said, "So, we remain grateful to Mr. President. We also thank the Governor for his intervention and understanding and the information given to Lagosians that has drastically reduced bottlenecks all over the lsland. We are grateful. We are grateful for Hitech. Hitech gave us a lot of support, materials, and equipment. We are very thankful to Hitech. All through the night, they were bringing materials, they were bringing equipment. We also thank very highly our partner Buildwell, in this expert bridge. I absolve them of any blame in this circumstance. I'd rather thank them. They have been working in the past three days and nights, and we are grateful for their cooperation and for the partnership that has helped us to restore this bridge. And, of course, to Chief Elumelu and some other prominent Nigerians like Dangote, for their calls and encouragement. They even requested that they send their planes to carry us, and we said no" The Honourable Minister used the opportunity to roll out a new policy direction on measures to follow before a federal road is closed nationwide. He stated that going forward, a feedback mechanism through stakeholders' engagement would be a condition precedent that must take place before approval for closure of federal bridges/roads of essential utility such as those in Lagos State. He mentioned among others that the person seeking such closure must state "what is to be done on that place and then will state the technical problems and the technical solution. He will be able to put up all these exposures to the public. So, we request comments from the public and tell them how long it is going to last. And so, with this feedback, everybody is in the know, and then we'll be able to do that." ...
FG Flags Off Access Road to Second Niger Bridge (Phase 2A), Reinforces Commitment to Infrastructure Development The Federal Government through the Federal Ministry of Works has officially flagged off the Construction of a 17.55-Kilometre Access Road to the Second Niger Bridge (Phase 2A) in Asaba, linking the South South Zone to the South East. This milestone event underscores the administration’s unwavering dedication to enhancing national road infrastructure and fostering economic growth. Speaking at the ceremony, the Honourable Minister of Works Engr (Sen) David Umahi CON, FNSE, FNATE lauded the host State Government for its commitment to infrastructure development, emphasising that governance is about improving the lives of the people. He commended the Edo State Governor’s proactive approach to addressing road infrastructure needs, acknowledging the numerous ongoing projects, including three major flyovers in Warri town. "Your state is a construction site. You have demonstrated that leadership is about responsibility, not excuses. Instead of blaming the Federal government, you are taking proactive actions. That is highly commendable," he stated. Engr. Umahi further highlighted the Federal Government’s broader vision for road infrastructure, revealing that multiple strategic road projects are either ongoing or in the pipeline, nationwide. These include the Lagos-Ibadan Expressway, the Benin-Asaba Expressway, the Sokoto-Gusau-Katsina-Kaduna corridor, the East-West Road, the remaining section of Abuja-Kaduna-Zaria-Kano Dual Carriageway, amongst others. He assured that the 9-kilometre extension of the just-flagged off Reconstruction of the Benin-Asaba Expressway to the 2nd Niger Bridge requested by the State Government has been approved. To ensure the security and sustainability of the newly constructed roads and bridges, the Government has implemented advanced surveillance measures, including the installation of CCTV cameras along the Access Roads and the Bridge. These cameras will be linked to the offices of the Governors of the concerned States to monitor activities and prevent vandalism. Additionally, the project will incorporate solar-powered streetlights to enhance visibility and security. The Minister reiterated the administration’s commitment to prioritising inherited projects and delivering impactful infrastructure to Nigerians. He emphasized that under President Tinubu's Renewed Hope Agenda, road projects nationwide are receiving unprecedented attention, ensuring seamless connectivity and economic progress. "All major road projects inherited by Mr. President are ongoing. He has given them priority attention. This administration believes in continuity and results, not political excuses," he stressed. The project, he continued, is part of a broader national infrastructure strategy aimed at connecting key economic zones and improving transportation efficiency. The government has assured that funding is secured, with 30% of the contract sum ready to be paid, while strict timelines and performance monitoring will be enforced to ensure timely delivery. The Delta State Governor, Rt. Hon Sheriff Francis Oborevwori, while acknowledging the presence of dignitaries at the occasion, stated “It is an honor and privilege to stand before you today, representing His Excellency, Senator Bola Ahmed Tinubu, GCFR the President of the Federal Republic of Nigeria. This occasion is not just about flagging off a road project—it is a testament to this administration’s unwavering commitment to economic development, national integration, and infrastructure renewal. “The construction of the Access Road is a major step towards strengthening our nation’s connectivity. This road will ease movement, facilitate trade, and enhance economic opportunities for the people of Delta, Anambra, and beyond. It is yet another proof that under this administration, infrastructure development remains a top priority for fostering economic growth and national unity. I want to, especially, commend the government and people of Delta and Anambra States for their collaboration in ensuring the success of this project. Your support and cooperation are crucial in making this vision a reality. Infrastructure development is not just the responsibility of the Federal Government requires the collective effort of all stakeholders, including the State Governments, Local Communities, and Private Sector Partners,” says the President. The Governor added “To our esteemed contractors, I urge you to ensure the highest standards of quality and timely completion of this project. This is not just a road; it is a legacy of progress that will serve generations to come.” He extended his gratitude to all present-the traditional rulers, community leaders, and all who have contributed in one way or another to the realisation of the initiative. “Your support and dedication to the success of this project reflect our shared commitment to building a better, more connected Nigeria. As we look forward to its completion, let us all continue to work together for the development of our great nation,” Governor Oborevwori concluded. ...
Flag-off of the 125-KM Benin-Asaba Dual Carriageway: A Game Changer in Road Development The Federal Government has officially flagged off the reconstruction of the 125-kilometre Benin-Asaba Expressway, a vital road corridor in the southern part of the country. The event, which took place on Sunday, 21st March 2025, was performed on behalf of the President, His Excellency Bola Ahmed Tinubu, GCFR, by the Edo State Governor, His Excellency Sen. Monday Okpebholo. In his Address, the Honourable Minister of Works, Engr. (Sen.) David Umahi, CON, FNSE, FNATE disclosed the project's significance in enhancing transportation, economic growth, and regional integration. He highlighted the Federal Government's commitment to improving road infrastructure as a means of boosting national development and integration, noting that the partnership driving the project would enhance the safety and efficiency of travel while unlocking the economic potential of the region. “This project will generate significant economic benefits, including job creation and an improved standard of living for the people. I urge all stakeholders to work, collaboratively, to ensure the successful and timely completion of this critical infrastructure,” the Minister stated. He also added that "The Benin–Asaba Expressway Project, is more than a road. It is an ambitious Dual Carriage, solar-lit that is to be fully funded by the private sector under a Public-Private Partnership (PPP) agreement." On behalf of the government and good people of Edo and Delta States, the Minister expressed deep appreciation to His Excellency, President Bola Ahmed Tinubu, GCFR for his leadership and unwavering support for infrastructure development in the region and the nation, at large. He also commended the Minister of Finance and Coordinating Minister for the Economy, Chief Wale Edun, and the Infrastructure Concession and Regulatory Commission (ICRC) for modifying an alternative funding option, outside the national budget, that would guarantee the timely execution of Federal road projects. He officially handed over the Engineering Design and Instruments of Authority for the contract to the Concessionaire, Africa Plus Partners (Nigeria) Limited, while canvassing for support in the 2027 Presidential polls. In their various Goodwill Messages at the epoch-making ceremony, the Governor of Delta State, represented by his Deputy, His Excellency Monday Onyeme, the Senator representing Edo North and former Governor, H.E. Adams Oshiomole, the Commissioner of Police, Edo State and representative of the Transport Union, eulogised Mr. President for the life-changing project, promising to vote for him in 2027, overwhelmingly. The Governor also pleaded with Mr President to extend the alignment to the Onitsha Bridge. In his closing remarks, the Governor of Edo State commended the Federal Government's commitment to infrastructure development, noting that the Renewed Hope Administration of President Tinubu has prioritised road construction as a catalyst for economic transformation. He acknowledged the efforts of the Ministries of Works and Finance in driving infrastructure renewal across the country. “The impact of quality infrastructure cannot be overstated. It is the foundation upon which socio-economic growth and development are built. I commend President Tinubu’s administration for its visionary leadership in making this project a reality,” the Governor stressed. The flag-off of the Benin-Asaba Expressway is a giant leap in Nigeria’s journey towards bequeathing a modern, efficient, and well-maintained road infrastructure to the citizenry. The Federal Government remains resolute in completing this project on schedule, ensuring that citizens and businesses benefit from improved connectivity and its associated economic opportunities. The Highway Development and Management Initiative (HDMI) is a strategic infrastructure development programme of the Federal Ministry of Works designed to encourage private sector participation in the development, rehabilitation, and maintenance of Federal highways across the country. Through this Initiative, the government aims to enhance operational efficiency, accountability, and financial sustainability, ensuring that all stakeholders - the government, private investors, and road users - benefit from improved road networks. As a Public-Private Partnership (PPP) model, HDMI is structured to attract long-term sustainable investments for the expansion, modernisation, and effective utilisation of Nigeria's road infrastructure. It facilitates the design, construction, operation, management, and maintenance of Federal highways, ensuring that all infrastructure and assets within the designated rights of way are efficiently developed and maintained, leveraging private sector expertise and funding. It further seeks to enhance road quality, improve connectivity, boost economic activities, and ultimately create a safer and more reliable road transportation network for Nigerians and other users. The Benin-Asaba alignment, a 125-kilometre Dual Carriageway beginning from AIF Roundabout in Benin City, Edo State, and terminating at Summit Junction in Asaba, Delta State, serves as a major link between the South-East, the South-South and some parts of the South-West of Nigeria. It is a vital artery connecting vibrant economic regions of the country. The total project cost required for the rehabilitation and value-added concession of the Expressway will be funded by the Benin - Asaba Expressway Concession Company Limited - Africa Plus Partners (Nigeria) Limited Consortium (APPNLC) with a 30-month completion period. In attendance were many stakeholders, including the Permanent Secretary, Federal Ministry of Works, Engr. Olufunsho Adebiyi, FNSE, Directors-General of the Infrastructure Concession and Regulatory Commission (ICRC) and the Bureau for Public Enterprises (BPE), members of the National and State Assemblies, members of the Edo State Executive Council, Traditional Rulers, Party and Opinion Leaders, Market Women, Transport Workers, to mention but a few. ...
FG Committed To Development Of Quality Education Through Quality Infrastructure - Fashola
..... 1.06 km internal roads with reinforced concrete culverts and drains handed to AKTH
.... CMD lauds Buhari for the intervention
Minister of Works and Housing, Babatunde Raji Fashola SAN, has said that the Federal Government will remain committed to the development of Education in the county through the provision of quality infrastructure.
The Minister spoke in Kano while handing over 1.06 km internal road, including construction of reinforced concrete culverts and drains at the Aminu Kano Teaching Hospital, Kano (AKTH), Tuesday, March 22, 2022.
Fashola was represented by the Federal Controller of Works in Kano State Engr. Yahaya Baba Ali.
He said " it is undebatable that the quality of education will be impacted by the quality of infrastructure and the learning environment and those who doubt it should simply listen to some of the feedback from students in the schools where this type of intervention has taken place".
The Minister stated further that President Buhari's administration has successfully intervened in the internal Road networks of 46 Tertiary Federal institutions and handed over 29 as at 2021.
Accordingly, he said that another 17 tertiary institutions Internal roads are now ready to be handed over, while work is ongoing on 30 roads in similar institutions across the country making a total of 76.
Earlier, in his welcome address the Chief Medical Director AKTH Prof. Abdulrahaman Abba Sheshe expressed happiness an important project of this magnitude has been executed in the teaching hospital, pointing out that it will allow easy access for patients seeking medical treatment in different parts of the hospital.
" We are indeed very happy that the Federal Government under President Muhammadu Buhari through the Federal Ministry of Works realized the importance of this project which was carried out through special Intervention, the result is what we are seeing all around the hospital today" he said.
In his remarks, the Chairman Board of Directors, AKTH, represented by Dr. Dahiru M.D Shehu said he is hopeful that the present administration will continue to bring in more projects to the hospital.
" I thank Pesident Muhammadu Buhari, the Minister of Works and Housing Babatunde Raji Fashola for the road which will help in the development of the Health Sector in the country" he said.
He also commended the administration of President Muhammadu Buhari for the support given to the hospital in terms of improvement of the health care system in the country.
In an interview, the Principal Iman Academy AKTH Mallam Zakariya'u Muhammad thanked President Buhari and the Minister of Works and Housing for the internal road.
He said " this has brought relief to the people. Before the intervention visitors to this hospital suffer from dust due to the bad road and during raining season patients and pupils finds it difficult to access the road".
The ward head in the Hospital, Alhaji Sulaiman Shehu, expressed his happiness for the intervention and thanked the government for removing the pains of the people while using the road, saying that they can now move freely on the road.
President Muhammadu Buhari’s Acceptance Speech Of The 2021 Trophee Babacar Ndiaye
Ladies and Gentlemen,
This is an auspicious African day, in the capital city of Africa’s most populous nation.
It is an African day of Pride, where the story of Africa’s long-awaited Renaissance begins to unfold inside her largest country by population and GDP.
It is a day of Pride for the African Union and Her Dreams for the continent. The policies and programmes that have been inaugurated over the years are beginning to bear fruits and results.
The Trans African Highway programme, launched in 1971 sought to connect the whole of African through a major system of Nine (9) highways, the TAH1 to the TAH9 covering an aggregate distance of 56,683km.
The African Development Bank, a financial institution set up to support the African Countries in their developmental objectives.
The African Continental Free Trade Area Agreement set up to create a unified, borderless market of over one billion people to facilitate intra-African Trade.
I am delighted to report that Nigeria is playing her membership and leadership role in all of these institutions and in the pursuit of achieving their objectives.
Only a few days ago in the city of Lagos, our private sector opened a 3,000 metric tonne granular Fertilizer Company to support Farmers and Agriculturalists on the African continent and beyond.
Our collaboration with the African Development Bank has been productive and results are now manifest in projects like the Mfum-Bamenda Bridge that connects Nigeria and the Republic of Cameroon. I also acknowledge the support of the Bank in financing Feasibilities, Consultancies and Pre-construction work on the Lagos-Abidjan Corridor comprising Nigeria, the Republic of Benin, Togo, Ghana and Cote d’Ivoire which is part of Trans African Highway No. 7 from Dakar in Senegal to Lagos in Nigeria.
I am happy to report that the Nigerian sections of this highway is now under construction on the Lagos-Badagry corridor through our local financing institution such as the Tax Credit Scheme introduced by Executive Order No. 7; and in collaboration with the Lagos State Government.
I am able to report that apart from Trans African Highway No. 7, Nigeria is also connected by Trans African Highways No. 2, Algiers to Lagos and Trans African Highway No. 8, Lagos – Mombasa.
The East to West crossing of Nigeria across the Second River Niger Bridge which will be finished this year is a major investment by Nigeria on the Lagos-Mombasa Trans African Highway, as is the Enugu – Abakaliki to Mfum Highway.
The 375Km Abuja to Kano that is now under construction is Nigeria’s major part of the Trans African Highway No. 2; Algiers to Lagos.
Apart from these Trans African connections, we are rebuilding, expanding or replacing strategic Highways and Bridges across our country.
The Apapa-Oworonshoki Highway in Lagos is strategic for trade and business facilitation to support our busiest and largest Sea Port in Apapa and Tin Can Island.
The Suleja-Minna Highway is critical to our petroleum distribution network and access to strategic petroleum products Depot in Niger State; and it is receiving attention, while the Calabar-Itu-Odukpani unlocks access to agricultural produce and supports mining and extractive activities for construction, in the South South and South East of Nigeria.
Ladies and Gentlemen, these are only examples of over 13,000Km of Road and Bridge construction, expansion and rehabilitation nationwide.
They have been a major boost for the growth of our economy, keeping people at work; driving a supply value chain, stimulating productivity at Quarries, Cement Factories, Steel Factories, and the Petroleum sectors for lubricants, fuel and bitumen.
Our most recent GDP results of 3.40%, the biggest in the last 7 years clearly show that the construction sub-sectors and related sub-sectors of the economy were among the big performers of the growth surge.
Very evidently, infrastructure investment is good for the economy.
By building Roads, we are building Economies.
The founding vision of African Leaders is coming to fruition, Evidence of the African Renaissance is being showed today in Nigeria.
The Trophee Babacar Ndiaye 2022 at the 7th Edition of Africa Road Builders symbolizes this Renaissance.
On behalf of the Federal Republic of Nigeria, I accept the Africa Road Builders Award for the Hope, Prosperity and Progress that it symbolizes.
State House
Abuja
DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE
DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE
MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1
MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1