Federal Ministry of Works (FMW)
... building the backbone for Development ...
Follow Us:
Welcome To Federal Ministry Of Works.
Minister Federal Ministry Of Works Engr. David Umahi.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Mar
24
2026

LATEST PRESS

UMAHI DECLARES AN END TO YEARS OF DEADLY TRAPS AND GRIDLOCK ON THE ENUGU–ONITSHA EXPRESSWAY, SETS MARCH 31 DEADLINE FOR REOPENING

The Honourable Minister of Works, Senator Engr. David Umahi, CON has declared that the long-troubled Enugu–Onitsha Expressway is fast shedding its grim past, as the Federal Government intensifies a sweeping infrastructure upgrade across the South-East under the President, His Excellency, Senator Bola Ahmed Tinubu, GCFR. 

Umahi made the declaration on Monday, March 23, 2026, during an inspection of ongoing projects in Enugu, including the Enugu–Onitsha Expressway and the Eke-Obinagu Flyover, where he expressed confidence that the era of consistent fatal accidents, endless traffic, and public frustration along the road is coming to an end.

“I’m going round the six geopolitical zones assessing what is possibly to be commissioned before May 29th by Mr President. There are mega project that the President will be available for before May 29th and we mean it,” the Minister said.

Once regarded as one of the most dangerous highways in the region, the Enugu–Onitsha road had for years been plagued by tanker explosions, loss of lives, and economic disruptions. But Umahi said decisive intervention by the Tinubu administration has changed the trajectory.

“Now this route, the Enugu-Onitsha expressway, you recall that when we came on board, everyday, people were talking about this road. There were a lot of tanker accidents, a lot of people died and so forth. But my joy is that the whole thing is a past story, because the President has swinged into action,” he stated.

The Minister disclosed that the dual carriageway, which spans 107 kilometres on each side, is undergoing a major structural shift, with a significant portion being converted from asphalt to concrete to ensure durability.

“It is not only that we are repairing this road… about half of it is going on to be concrete. I have no confidence in asphalt I continue to say it. By the time the asphalt fail we will have 50 percent of the road still intact and if it fails within the second tenure of the president then be rest assured that we will fix it,” he said.

He added that the same approach is being extended to sections in Anambra State, including the head bridge axis, where an initial asphalt design is being replaced with concrete pavement to align with modern highway standards.

“At the head Bridge we have 39k, we’re changing that to concrete so that we can have this coastal road type of road pavement there in Anambra and here in Enugu,”.

Beyond reconstruction, the project is also being enhanced with solar-powered street lighting and environmental features aimed at improving safety and sustainability.

“So that is going to happen but then not only that. We are putting solar light both for the one that was constructed before us and the one that is being done by us. Within the first one week we will have solar light up to this 1km and we continue we are also going to plant trees which is very important,” he added.

The Minister urged the people of the South-East to recognise the level of federal intervention in the region, noting that such attention to infrastructure was previously lacking.

“The people of South East have to be very grateful to Mr President. The reason is that we never had it like this. I was governor for 8 years and I can’t think of any Federal road project in Ebonyi State,” he said.

He also cautioned against divisive narratives, warning that some actors were misleading the public for selfish interests.

“I want to ask our people to be very very careful, there are people that pretend that they are helping us but they actually inciting us against government… we need to know when people are genuinely interested in our case,” he said.

Calling for sustained support for President Tinubu, Umahi described the ongoing works as part of a broader effort to correct past neglect and integrate the South-East more fully into national development.

“Let us allow this man that have started to right the wrong metted on us as the people of Southeast in the past. Let us allow him the next four years and we will be very much fully integrated,” he stated, adding, “To know the revolution that is going on in infrastructure… this is the Biafra we are looking for.”

As a major milestone, the Minister directed that the Enugu–Onitsha Expressway be reopened for public use on or before March 31. 

“I have given the controller the authority, by the 31st or before, he should call the press to open this road, call the people of South East… let them know that this road is open for travel and that will be our Easter celebration,”.

Addressing concerns over project costs, Umahi clarified that the Ministry of Works does not unilaterally determine project pricing, noting that approvals pass through multiple regulatory layers, including the Bureau of Public Procurement and the Federal Executive Council.

“I’m not the final authority when it comes to the cost of a project, there are layers of approval, the Bureau of Public Procurement, their own stands and not my own,” he explained.

He maintained that the standard being applied to the Enugu–Onitsha project is consistent with major road projects across the country.

“The same road architecture as the Lagos-Calabar coastal highway and the Sokoto-Badagry Super Highway… so no discrimination with the president, everybody is the same,” Umahi said.


 

Dec
10
2019

Fashola Urges Nigerians To Be Patient The Minister of Works and Housing, Babatunde Raji Fashola, SAN has called on Nigerians to be patient and show understanding on the condition of the roads as a lot is being done to ease the pain Nigerians go through while plying them. The Minister made this call when he granted audience to the executive and trustee members of the Public Transport Owners of Nigeria Association [PTONA], in his office. Fashola said, “The entire transportation network of road, sea and air is important to the governmentand the President. We have been having meetings with various stakeholders in the transport sector to make life easier for the people.” He further said, “We met with our contractors and work is ongoing in many roads.There is a distance between approval and construction of roads, by the time all these work is completed all we are saying will be a thing of the past, please be patient.” The Minister expressed his readiness to work closely with all stakeholders. He said “We are stakeholders, we need to work together, if it works for you, itworks for us”. Earlier, the leader of the delegation Engr. Isaac Uhunmwaghu disclosed that all major transport owners belong to the association which he said was formed to work closely with government to make life easier for road users. Engr. Uhunmwaghu praised the Minister saying, “We in PTONA thoroughly appreciate you for what we know about you in the past 12 years. We are however sad that despite all your efforts and best intentions, the perception by Nigerians about travelling on the road is extremely negative presently.” He attributed this negative perception to insecurity and bad roads. He expressed the support of his association for the recent demand by the Hon. Minister for additional funding of N255.6 bn for roads. The group also expressed their support for the re-introduction of tolls on all highways in the country. The association suggested that vehicle sensor embedded to it should be used. Uhunmwaghu said toll gates will not only generate virtually all the funds for roads constructionand maintenance but have punitive charges for excessive load carrying vehicles responsible mostly for the quick destruction of our roads. He urged the Minister to give special attention to the following roads: Lagos- Abuja, Lagos –Port-Harcourt, Port-Harcourt to Abuja and Abuja to Kano road. He also urged the Ministryto give priority to major arterial roads. ...

Dec
03
2019

FG Undertaking 524 Highway, Bridge Projects Nationwide – Fashola * Every State including FCT has at least 3 ongoing Highway, Bridge projects being executed by FG * 80 Projects prioritized, to enhance ease of doing business * Projects include 27 Sovereign SUKUK Funded, 47 scheduled for substantial completion in 2020/2021, 4 major bridges and 2 roads leading to the ports * Also 43 Federal Tertiary institutions benefiting from rehabilitation of internal roads, 10 already completed The Minister of Works and Housing, Mr. Babatunde Fashola SAN, has updated the Federal Executive Council on the ongoing road and bridge construction/rehabilitation projects nationwide, highlighting 80 of them as priority projects scheduled for completion in the 2020-2021 fiscal year. Fashola, who gave the updates in a presentation he made before the Council, said a total of 524 road and bridge projects were currently going on across the country adding that every State in the Federation including the FCT has at least three such ongoing projects. He listed those on priority to include 27 financed with Sovereign SUKUK Fund, 47 scheduled for substantial completion in 2020/2021 and other priority projects, two roads leading to the ports and four major bridges. Giving reasons for the prioritization of the 80 projects, the Minister who explained that it would improve the ease of doing business in the country, declared, “The projects on completion will bring about reduced travel time, lower vehicle operating costs and improve the comfort of road users as well as improve the ease of doing business in the country and ultimately boost the Nigerian Economy”. He noted that Federal roads and bridges (categorized from A1 to A9) are major arterial routes that connect all states in Nigeria including the Federal Capital Territory, adding that the routes and bridges linked cities with high economic activities and carried majority of Heavy Goods Vehicles which gradually dispersed through the link routes to different parts of the country. The Minister listed the roads to include Lagos-Ibadan-Ilorin-Jebba-Kotangora-Jega-Sokoto-Niger Border as A1; Warri-Benin-Lokoja-Abuja-Kaduna-Kano-Daura-Niger Border as A2; Port Harcourt-Aba-Umuahia-Okigwe-Oturkpo-Makurdi-Akwanga-Jos-Bauchi-Maiduguri-Gamboru as A3 and Calabar-Ikom-Ogoja-Katsina Ala-Jalingo-Yola-Bama-Maiduguri as A4. Also listed are Lagos-Otta-Abeokuta-Ibadan as A5; Onitsha-Ihiala-Owerri—A.3 Junction at Umu Uyo as A6; Chikanda, Kosubosu-Kaiama-Kishi-Ilorin as A7; Mayo Belwa-Ganye-Serti-Mayo Selbe-Gembu as A8 and Jibiya-Katsina-Kano as A9. Prioritized road projects being funded through the Sovereign SUKUK Fund, Fashola said, include Abuja-Abaji Road(Section 1,International Airport Link Road Junction-Sheda Village Junction),  Abuja-Lokoja Road Section IV (Koton Karfi-Lokoja), Dualisation of Obajana Junction-Benin Phase 2: Section 1 (Obajana Junction to Okene) , Construction of Oju/Loko-Oweto Bridge to Link Loko and Oweto  with approach roads, Reconstruction of Bida-Lambata Road in Niger State and Dualization of Suleja-Minna Road Phase 11 in Niger State. They also include Kano-Maiduguri Road (Section ii, iii and iv), rehabilitation of outstanding section of Onitsha-Enugu Expressway: Amansea- Enugu State Border, Dualization Of Obajana Junction-Benin Phase 2: (Section ii, iii and iv), Rehabilitation of Enugu-Port Harcourt Road Section iv: Aba-Port Harcourt, and Dualization Of Yenegwe Road Junction-Kolo-Otuoke-Bayelsa Palm (20km). Others include Dualization of Ibadan-Ilorin (Section ii) in Oyo State, reconstruction of the outstanding Sections of Beni-Ofosu-Ore-Ajebandele-Shagamu Expressway Phase iii, pavement strengthening and asphalt overlay of Ajebandele- Ijebu Ode-Shagamu Road in Ogun State. Some of the projects scheduled for substantial completion in 2020/2021 and other priority projects, according to the Minister, include rehabilitation of Alesi-Ugep (Iyamoyung-Ugep) Section in Cross River State, construction of Yenegwe-Okaki-Kolo-Nembe-Brass Road and completion of rehabilitation of Ada-Okere-Ukoni-Amedokhiom Old Road, Uromi, Edo State. Also included are the rehabilitation of Odukpani-Itu-Ikot Ekpene Road in (Section i) and Odukpani-Itu Bridge Head in Cross River State, construction of Bodo-Bonny Road with a bridge across the Opobo Channel, in Rivers State, rehabilitation of Odukpani Junction-Akpet Central Section of Calabar-Ikom-Ogoja Road in Cross River State, rehabilitation of Oshogbo-Ilesha Road in Osun State, Dualization of Abeokuta-Ibadan Road, and reconstruction of Apapa-Wharf Road in Lagos State, among others. The four bridges under the priority projects are construction of Ibi Bridge, completion of construction of Chanchangi Bridge along Takum-Wukari Road in Taraba State, construction of Ikom Bridge  in Cross River State and emergency rehabilitation/maintenance of Third Mainland Bridge in Lagos, while the two roads leading to ports are the construction of Agaie-Katcha-Barro Road in Niger State and construction of Baro Port to Gulu Town in Niger State. The brief also provided a detailed  record of ongoing road and bridge projects in the 36 states of the Federation and the Federal Capital Territory. Some of the tertiary institutions where the Ministry is currently intervening on roads, according to the report, include the University of Benin where work is ongoing on the rehabilitation and Asphalt Overlay/Construction of Reinforced Concrete Drains and Kerbs and Asphatic Surfacing of three Car parks of 1.1KM Internal Road. Similar work include the ongoing Rehabilitation and Asphalting at Bayero University, Kano State, Federal University Oye Ekiti, Ekiti State, University of Maiduguri, in Borno State, Federal University Lokoja, Kogi State, Federal College of Education, Katsina, Katsina State, Federal University of Technology, Owerri and the University College Hospital, Ibadan, Oyo  State. Others include Kaduna Polytechnic, Kaduna State, Internal Road at Federal University Gashua, Yobe State and rehabilitation and asphalt overlay of 2.3 km Internal Road at Federal University Otuoke, Bayelsa State, among others. The Minister, however, told Council that in order to accomplish the objective of completing the prioritized projects in scheduled time, an additional N255.6 billion would be needed to close the funding gap for the projects pointing out that the amount was the difference between the appropriation for the project in the 2020 Budget, which stands N157.05 billion and the actual estimate for the completion of the projects which stands at N412.64 billion. ...

Nov
27
2019

Fashola Underscores Importance of Accurate Data for Developmental Issues Works and Housing Minister Babatunde Raji Fashola has said that, accurate data survey, collection and analysis would go along way in addressing developmental issues in the country He made this remark while playing host to the Managing Director/Editor in Chief of the Folio Communications Ltd, the Publishers of Daily Times Newspaper and his team who paid him a courtesy visit in his office The Minister stated that "we need research, knowledge and data analyst to report factual information for developmental issues in the country" While noting that many developmental issues and planning were not based on the right data, Fashola encouraged the media houses to invest in strong data collection and employ data analysts in order to have a more credible and informed news materials Accordingly, the Minister implored the media to fund investigative journalism and to always confirm the authenticity of their reports, so that they could properly advise government on policies and to change the negative mindset of the people On the need for the media to have a strong and credible data base, Fashola listed online polls, university campuses and international sites as parts of the areas where reporters can gather their data. Reacting on the vision of the new management envisaging Daily Times for tomorrow's audience, Fashola advised the management to give consideration to sports, entertainment, colleges with heavy activities and invest more on columnist and IT so that the newspaper can be relevant in finding new audience in young people. Responding to a question on the issue of building collapse in the country, Fashola listed; error of design; construction mistake or abuse; malpractice, improper soil test and abuse of law and order, as majorly factors responsible. He enjoined the professional bodies in the sector to live up to expectation by sanctioning erring  builders In his remarks, Minister of State Works and Housing Engr Abubakar Aliyu, blamed the activities of quacks in the built industry as responsible for building collapses. He pointed out that the purpose of any building, residential or commercial must always be stated at the on set before getting approval He explained that building for schools, disco hall and residential houses  are completely different  in design and structures, and whatever goes wrong should be the responsibility of the structural engineers who must ensure the building stands Earlier in his remarks, Aliu Akoshile, the Managing Director/Editor- in Chief, Daily Times, told the Minister that they came to specifically explore opportunity for collaboration with the Ministry and seek its support. He told the Minister that the new management of Daily Times under his leadership had re-positioned the medium which  brought the paper higher in the global ranking. The Editor -in-Chief also disclosed that Daily Times intends to form a veritable platform with the public sector by dedicating a page weekly on the efforts of the government in infrastructural delivery in the country He explained that it was their own way of supporting the government and to change the mindset of people about the current development in the nation. ...

First First First

LIVE ACTIVITY FEED

PUBLIC ANNOUNCEMENT


Nov
03
2025

  


PHOTO NEWS

Jun
02
2025

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

Click To View More Pictures

PHOTO NEWS

Apr
28
2025

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

Click To View More Pictures