Federal Ministry of Works (FMW)
... building the backbone for Development ...
Follow Us:
Welcome To Federal Ministry Of Works.
Minister Federal Ministry Of Works Engr. David Umahi.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Mar
24
2026

LATEST PRESS

UMAHI DECLARES AN END TO YEARS OF DEADLY TRAPS AND GRIDLOCK ON THE ENUGU–ONITSHA EXPRESSWAY, SETS MARCH 31 DEADLINE FOR REOPENING

The Honourable Minister of Works, Senator Engr. David Umahi, CON has declared that the long-troubled Enugu–Onitsha Expressway is fast shedding its grim past, as the Federal Government intensifies a sweeping infrastructure upgrade across the South-East under the President, His Excellency, Senator Bola Ahmed Tinubu, GCFR. 

Umahi made the declaration on Monday, March 23, 2026, during an inspection of ongoing projects in Enugu, including the Enugu–Onitsha Expressway and the Eke-Obinagu Flyover, where he expressed confidence that the era of consistent fatal accidents, endless traffic, and public frustration along the road is coming to an end.

“I’m going round the six geopolitical zones assessing what is possibly to be commissioned before May 29th by Mr President. There are mega project that the President will be available for before May 29th and we mean it,” the Minister said.

Once regarded as one of the most dangerous highways in the region, the Enugu–Onitsha road had for years been plagued by tanker explosions, loss of lives, and economic disruptions. But Umahi said decisive intervention by the Tinubu administration has changed the trajectory.

“Now this route, the Enugu-Onitsha expressway, you recall that when we came on board, everyday, people were talking about this road. There were a lot of tanker accidents, a lot of people died and so forth. But my joy is that the whole thing is a past story, because the President has swinged into action,” he stated.

The Minister disclosed that the dual carriageway, which spans 107 kilometres on each side, is undergoing a major structural shift, with a significant portion being converted from asphalt to concrete to ensure durability.

“It is not only that we are repairing this road… about half of it is going on to be concrete. I have no confidence in asphalt I continue to say it. By the time the asphalt fail we will have 50 percent of the road still intact and if it fails within the second tenure of the president then be rest assured that we will fix it,” he said.

He added that the same approach is being extended to sections in Anambra State, including the head bridge axis, where an initial asphalt design is being replaced with concrete pavement to align with modern highway standards.

“At the head Bridge we have 39k, we’re changing that to concrete so that we can have this coastal road type of road pavement there in Anambra and here in Enugu,”.

Beyond reconstruction, the project is also being enhanced with solar-powered street lighting and environmental features aimed at improving safety and sustainability.

“So that is going to happen but then not only that. We are putting solar light both for the one that was constructed before us and the one that is being done by us. Within the first one week we will have solar light up to this 1km and we continue we are also going to plant trees which is very important,” he added.

The Minister urged the people of the South-East to recognise the level of federal intervention in the region, noting that such attention to infrastructure was previously lacking.

“The people of South East have to be very grateful to Mr President. The reason is that we never had it like this. I was governor for 8 years and I can’t think of any Federal road project in Ebonyi State,” he said.

He also cautioned against divisive narratives, warning that some actors were misleading the public for selfish interests.

“I want to ask our people to be very very careful, there are people that pretend that they are helping us but they actually inciting us against government… we need to know when people are genuinely interested in our case,” he said.

Calling for sustained support for President Tinubu, Umahi described the ongoing works as part of a broader effort to correct past neglect and integrate the South-East more fully into national development.

“Let us allow this man that have started to right the wrong metted on us as the people of Southeast in the past. Let us allow him the next four years and we will be very much fully integrated,” he stated, adding, “To know the revolution that is going on in infrastructure… this is the Biafra we are looking for.”

As a major milestone, the Minister directed that the Enugu–Onitsha Expressway be reopened for public use on or before March 31. 

“I have given the controller the authority, by the 31st or before, he should call the press to open this road, call the people of South East… let them know that this road is open for travel and that will be our Easter celebration,”.

Addressing concerns over project costs, Umahi clarified that the Ministry of Works does not unilaterally determine project pricing, noting that approvals pass through multiple regulatory layers, including the Bureau of Public Procurement and the Federal Executive Council.

“I’m not the final authority when it comes to the cost of a project, there are layers of approval, the Bureau of Public Procurement, their own stands and not my own,” he explained.

He maintained that the standard being applied to the Enugu–Onitsha project is consistent with major road projects across the country.

“The same road architecture as the Lagos-Calabar coastal highway and the Sokoto-Badagry Super Highway… so no discrimination with the president, everybody is the same,” Umahi said.


 

Nov
25
2019

Ember Months: Fashola Directs Controllers, Contractors To Embark On Rehabilitation Of Identified  Portions For Better Travel Experience * FERMA, Contractors to embark on special repairs of identified bad portions of highways * FRSC road audit gives an overview of identified damaged portions of roads across the zones * Corps to embark on enforcement of road traffic rules, plans a mass enlightenment on the issue soon In a move aimed at achieving shorter travel time and better travel experience, in the coming Yuletide months across the country, the Minister of Works and Housing, Mr. Babatunde Fashola SAN, has rallied all concerned road infrastructure stakeholders into action for the annual Ember Months operations to ensure safe and pleasurable journey on the nation’s roads during the period. Presiding over a result-focused meeting in Abuja, which had the Corps Marshal of the Federal Road Safety Corps, Dr. Boboye Oyeyemi, representatives of Federal Road Maintenance Agency (FERMA), Government Contractors and the Federal Controllers of Works from the States, Fashola gave directives to the contractors handling the various roads to remobilize to sites for special works promising that they would receive some payment before the end of the year. In his opening remarks, at the Ministry’s Conference Room, Mabushi venue of the meeting, the Minister said it was expedient for the major stakeholders in the road sector to brainstorm over the issue of smooth travel experience for commuters as the Christmas and New Year Festivities were around the corner adding that there was need to ensure safety for those travelling by road across the country. He recalled that the Ministry started preparing for the rainy season early in the year before the exit of the last administration adding that inspections carried out about March and April revealed rise in water levels in some areas, failures of portions of the roads, washouts and other damages on the roads. Noting that the major challenge on the roads during the Dry Seasons was the spiral increase in the volume of vehicular traffic, he pointed out that the increase was most pronounced at the approach of Christmas and the New Year when, according to him, people travel for family reunions, wedding ceremonies, business transactions  and other activities. The Minister said the meeting was therefore aimed at building a synergy among the major stakeholders, FERMA, Federal Controllers and the FRSC, adding that with the gradual rounding off of the Rainy Season and the onset of dry weather, contractors would return to sites with the purpose of stabilizing such portions while FERMA would also escalate action in providing palliatives to damaged areas. Fashola said the presence of the Corps Marshal of the FRSC at the meeting was to brief participants on the portions of the roads that need urgent attention based on a Road Safety Audit it conducted, while FERMA would also make a presentation on its strategies to achieve smooth travel experience during the EMBER months adding that the contractors were expected to take note of such briefs for immediate response. The Minister, also said some of the Directors would speak to some of the roads in their zones that were responded to under emergency conditions during the Rainy Season. Throwing more light on the need for the meeting, he told his audience, “Because our work is interconnected, the contractors on one hand, the Federal Roads Safety Corps, on the other hand, who are on the roads every day, managing traffic, interface with the commuters, our maintenance agency, FERMA, I thought that, as we normally do every year before December, we should all meet again as we get out of the rainy season and start planning for the EMBER month. “The benefit of this Season is that the weather is dry, more building and construction work can take place, quarrying will be able to progress, stabilization work will be easy as water recedes; but the major problem of the season will be vehicular traffic, people travelling on holidays, importers and exporters moving more goods to meet the season’s demands; all those who want to eat turkey, celebrate marriages and all of that. We must plan for those people; that is why we are here”, he said. Before yielding the floor to the Corps Marshal of the FRSC to give an overview of his commission’s audit on the roads, Fashola urged contractors to take note of the report in order to know where to intervene especially on roads that fall within the purview of their ongoing contracts or which are contiguous with their contracts so they could carry out emergency works on such roads to enable smooth travel experiences for commuters during the festive season. He also told the FRSC to ensure that drivers without driving license were not allowed on the roads. Giving an overview of the audit report compiled by his commission about the conditions of certain portions of the roads that need urgent attention across the country, the Corps Marshal of the FRSC, Dr. Boboye Oyeyemi, said the audit was necessitated by the need to evolve strategies to ensure that the heavy movement of citizens usually associated with the end of the year did not lead to road traffic crashes, injuries and fatalities. According to the FRSC boss, “In line with this, 2019 Operation Zero was initiated to vigorously enforce road traffic rules and educate road users while embarking on strategic engineering to reduce road traffic crashes on Nigerian roads”, adding that as a build up to previous engagements on road audit and implementation of agreed recommendations, a survey of critical corridors was made nationwide to identify areas in urgent need of attention. Stating that road traffic management during festive period deserved adequate attention “as Nigerians across board are always on the road for business, pleasure and celebration”, Boboye said the repairs of the identified bad parts on the major corridors would go along way to aid smooth vehicular  movement during the festive period and consequently reduce injuries and fatality on Nigerian roads. The Corps Marshal, who enjoined commuters to obey traffic rules and signs, especially on roads under construction or rehabilitation, in order to achieve sanity on the roads, however, warned that the FRSC would enforce the law on the roads during the period. He added that the Corps would soon embark on mass enlightenment of the public before enforcing the law. Others who made remarks at the meeting included the Controllers, who gave account of the roads under their jurisdiction, a representative of FERMA who gave a brief account of the strategy of the agency to contribute to smooth travel experience during the festive season and the Contractors who pledged their willingness to return to their project sites.   ...

Nov
25
2019

Yuletide: Fashola Meets With Stakeholders on Fixing Major Arterial Roads   .... charged Housing Controllers for result The Honourable Minister of Works and Housing, Babatunde Raji Fashola,SAN has met with the major stakeholders in the implementation of the Ministry's plan for the repairs of major arterial roads across the country in view of the upcoming Yuletide season. The meeting was aimed at reviewing the state of all on-going construction and rehabilitation work on the major arterial roads with a view to facilitate ease of movement during the Yuletide season. In attendance at the meeting were:  the Corps Marshall  of the Federal Road Safety Corp, Oyeyemi Boboye, officials of the  Federal Roads Maintenance Agency (FERMA), Directors of the Federal Ministry of Works and Housing, State Controllers of Works and Housing, Contractors for some on going road projects accross the six geopolitical zones of the country. The Minister stated that the meeting was necessary in view of the demand of the up coming season for high vehicular movements, more people traveling and increased activities of both importers and exporters on our major roads. He explained that, it was the responsibility of the ministry to ensure all necessary things were done and put in place in order to facilitate easy and smooth movement of travellers during the season. While enjoining  the Federal Road Safety Corps  to intensify campaigns on over speeding and unlicensed drivers on our highways, Fashola advised that the Corps should apprehend and prosecute violators of highway rules and regulations for sanity and orderliness by road users. The Minister added that whenever there was ordeliness on our hihhways by road usere accidents on our roads would be reduced. Fashola directed his Ministry's Director of Highways Construction and Rehabilitation  to list out all key arterial roads that need urgent attention and commence action immediately. In his remarks, the Corps Marshall of the Federal Roads Safety Corp, Oyeyemi Boboye told the meeting about the arrangement  put in place by his  agency to facilitate movement of travellers during the season and also listed  some of the arterial roads and the diversions proposed . The contractors handling the arterial roads assured the Honourable Minister of their cooperation to continue with the construction and rehabilitation work on the affected roads for ease of movement during the Yuletide season and after. Some of the arterial roads to be fixed include the following among others:Ibadan- Lagos, Abuja-Kaduna-Kano,Shagamu-Mowe, Abraka-Agbor,Benin-Asaba,Auchi-Benin,Calabar-Nkom,Ogoja, Calabar-Itu-Uyo, Kontagora-Minna,Abuja-Lokoja,Oybomoso-Ilorin,Jos-Panshin,Enugu- Onitsha. Some of the contractors that attended the meeting included: Julius Berger Nigeria Limited, Setraco, RCC,Mother Cart Nigeria Limited,CGC Nigeria Limited,Salini Nigeria Limited, CGCG among others. Federal Controllers, on zonal basis,  particularly those overseeing the  major arterial roads made presentation on their plan of action for the season, and the Contractors handling such areas also explained the efforts in place to collectively ensure effective implementation as desired by the Ministry. Meanwhile, in a separate meeting with the Housing Sector Controllers, the Minister charged them to be more committed and productive to ensure that  all ongoing  National Housing projects  being executed by the Ministry were completed by 2020. Fashola noted that the controllers would be reckoned with completed projects, advising that they should work more to facilitate the job of the contractors to deliver by removing all obstacles that hinder the process. While reminding them of the value addition and muliflier effects of any project on the people of the benefiting community, the Minister pointed out that thousands of people in the benefiting Community  of any project would be taken out of poverty because they were engaged as labourers, artisans  etc . Clarifying further, Fashola stated that President Buhari's desire was to see value for all monies spent for Nigerians in order to appreciably reduce poverty in Nigeria. ...

Nov
19
2019

Reward For Hard Work Is More Work-Fashola The Hon. Minister of Works and Housing, Babatunde Raji Fashola has said that the reward for hard work is to be given more work to enhance productivity and service delivery. He stated this at the 2018 Recognition and Reward Ceremony organised for staff of Federal Ministry of Power Works and Housing on Tuesday 19th November 2019 at Idiris A Abudulkadir Auditorium, National Universities Commission, Abuja. Fashola explained that the essence of the award was to inspire the awardees to work harder, bring about healthy competition and in turn increases productivity. The Minister noted that the 100 million jobs to be created by the President Buhari’s led Administration was not for the government alone but a call to duty by all Nigerians. “He said, ‘’Those people whom you will never meet but who by act of fate pass through a place you help to build may earn their living from there.  This implies that whatever you are doing, do it well to favour others.  Own the environment, own the space and do the best you can” Fashola further directed that in subsequent award ceremonies, Team Award (completed projects) should be added among recipients. He congratulated the award recipients and encouraged other staff to emulate them to join hands together to move the nation forward. During his opening remarks, the Permanent Secretary Federal Ministry of Woks and Housing, ably represented by the Acting, Permanent Secretary, Federal Ministry of Power, Ahmed Abdul noted that recognition/award is an important tool embedded in the Public Service Rule to motivate and reward excellent performance of staff in ministries, departments and agencies (MDAs) He reiterated that the cardinal objectives of the event were to motivate staff of the ministry towards achieving greater performance/productivity, influence personal commitment and proper conduct. The representative of the Chairman Federal Civil Service Commission and the Commissioner for Osun and Oyo State, Engr. Fatai Adebayo Olapade stated that the reward for diligence and hard work was clearly stated in Chapter 15 of the Public Service Rule.  He said it was given to staff to motivate them to put in their best based on merit and fairness. The categories of award given were, Most Outstanding Director of the Year, Best Performing Senior Staff Award, and Most Hardworking Junior Staff Award.  In all a total of 47 officers from Power, Works, & Housing Sectors were awarded.   The award was for 2018 and the three ministries were together then.  The recipients were given plaques cash and other items such as grinding machines and refrigerators. Responding on behalf of his fellow awardees, the Director Highways Planning and Development Engr. Chukwubuikem Uzor who bagged the award as the most outstanding director of the year 2018 in the Ministry thanked the Minister, Permanent Secretary for initiating the idea of recognition and award for deserving staff of the Ministry. He further praised them for their support and thorough guidance which had made  the staff of the Ministry better  in discharge of their duties. ...

First First First

LIVE ACTIVITY FEED

PUBLIC ANNOUNCEMENT


Nov
03
2025

  


PHOTO NEWS

Jun
02
2025

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

Click To View More Pictures

PHOTO NEWS

Apr
28
2025

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

Click To View More Pictures