Federal Ministry of Works (FMW)
... building the backbone for Development ...
Follow Us:
Welcome To Federal Ministry Of Works.
Minister Federal Ministry Of Works Engr. David Umahi.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Feb
13
2026

LATEST PRESS


WORKS MINISTRY DID NOT AWARD ABUJA–KADUNA ROAD CONTRACT TO MIKANO – UMAHI CLARIFIES

The Honourable Minister of Works, Engr. Sen. David Nweze Umahi, CON, FNSE, FNATE, has clarified that the Federal Ministry of Works did not award the Abuja–Kaduna Road contract to Mikano International Limited. The Minister stated that the contract was awarded to Infiouest International Limited, in line with due procurement processes and transparency standards.

The Minister made this clarification while briefing journalist on 12 Febuary, 2026 in the Ministry Confrence Room in Mabushi Abuja, also drawing public attention to the increasing rate of vandalisation of critical road infrastructure across the country. He noted that the Ministry has a responsibility to provide accurate information to the public and to protect national infrastructure from destruction.

Engr. Umahi expressed serious concern over widespread vandalism affecting roads, bridges, and related infrastructure nationwide. He cited recent cases along the Lagos Coastal Road corridor, where protective structures and road components have been deliberately damaged.

According to the Minister, flooding recorded in some sections of the coastal highway was largely caused by blockage of underground drainage channels with refuse, emphasizing the need for public cooperation in maintaining infrastructure.

He commended the Lagos State Government, security agencies, and the Nigeria Police for deploying personnel to safeguard critical infrastructure and combat vandalism.

Parking of heavy trucks on bridges creates structural stress, as bridges are not designed for static heavy loads. He disclosed that some offenders have already been arrested and are being prosecuted.

The Minister highlighted the Federal Government’s adoption of reinforced concrete road technology, which is expected to last between 50 and 100 years, compared to traditional asphalt roads. He commended President Bola Ahmed Tinubu GCFR, for supporting long-term infrastructure development and for approving several strategic road projects nationwide.

The Minister announced the
Extension of the Bodo–Bonny Road by 8.7km to link the East–West Road, using concrete pavement technology.

He added that Progress on major legacy road corridors including routes connecting Akwanga – Jos – Bauchi – Gombe – Maiduguri.
Expansion of CCTV surveillance on major bridges and highways to curb vandalism and enhance monitoring.
The Minister emphasized that federal road projects are distributed based on national development priorities, not regional considerations. He called on Nigerians to support national unity and protect public assets.

The Federal Government is considering stronger policies and collaboration with private sector partners and state governments to improve road maintenance and enforce compliance against illegal road obstructions and structures.

Addressing the status of NNPCL-funded road projects initiated under Executive Order 007 (April–May 2023), the Minister clarified that the Nigerian National Petroleum Company Limited (NNPCL) will no longer directly pay contractors for these projects. He announced that the Federal Ministry of Works has officially taken over both project supervision and payment responsibilities, in line with new federal directives.
The Honorable Minister disclosed that ₦127 billion has been released by Mr. President for the continuation of these projects, underscoring the administration’s commitment to completing inherited infrastructure initiatives. He noted that an estimated ₦7 trillion will be required to complete all NNPCL-funded projects, describing them as critical to national connectivity and economic development.

Sen. Umahi further revealed that the Federal Government inherited 6,604 ongoing federal road and bridge projects nationwide, with a projected ₦16.9 trillion required for their completion. He reiterated that President Bola Ahmed Tinubu has directed that all inherited projects must be completed, stressing that infrastructure development remains a top priority of the administration.

The Honourable Minister reaffirmed the Ministry’s commitment to transparency, efficiency, and accountability in the execution of these projects, assuring Nigerians that the government is determined to deliver quality infrastructure that meets international standards.

The Permanent Secretary, Federal Ministry of Works, Mr. Rafiu Adeladan, In his closing remarks, thanked members of the press for their continued partnership and commitment to national development.
He reiterated the Ministry’s commitment to transparency and urged the public and media to verify facts and provide constructive feedback to support improved service delivery.


 

Sep
09
2025

FEDERAL MINISTRY OF WORKS ADOPTS FUNDING PRIORITIZATION FRAMEWORK ON NNPCL INHERITED TAX CREDIT PROJECTS NATIONWIDE. -PROMOTES NIGERIA FIRST POLICY, SAYS CONTRACTS BELOW ₦20 BILLION TO BE DONE BY INDIGENOUS CONTRACTORS. As part of strategic plans towards sustainability in project funding and execution and in pursuance of the directive of the President of the Federal Republic of Nigeria, His Excellency, Bola Ahmed Tinubu, GCFR on strategic and systematic funding of inherited NNPCL funded projects, the Federal Ministry of Works has adopted funding prioritization framework to ensure the continued execution of road projects hitherto funded by Nigerian National Petroleum Company Ltd (NNPCL) under the Road Infrastructure Development and Refurbishment Investment Tax Credit Scheme. The Honourable Minister of Works, His Excellency, Sen. Engr. Nweze David Umahi, CON made this disclosure during his inspection visit to the ongoing dualization of the East-West Road (Section IIIA) from Eleme Junction, Port Harcourt to Onne Junction in Rivers State handled by Messrs RCC Nig Ltd dated 9th September 2025. Speaking during his visit, the Honourable Minister stated that the Federal Ministry of Works had compiled all the NNPCL inherited Tax Credit projects for strategic priority funding, noting that the most critical projects within the national economic corridor would receive precedence in the hierarchy of prioritization. “We are inspecting projects of federal government in Rivers State, and this particular one is the dualization of Eleme Junction to Onne Port Junction by RCC. Recall that one carriageway was completed and commissioned, even though there are a few things we ordered afresh like the retaining wall and hanging drainage. For the second carriageway with some bridges and flyovers, work has started on it. Let me say that this is part of the NNPC Tax Credit that has been stopped in terms of funding by NNPC. But graciously, we have compiled all the NNPC inherited Tax Credit projects, and we presented as Ministry of Works to Mr. President. And Mr. President has graciously directed that none of such works should stop now. However, as Ministry, we are going to do prioritization of the projects and look at the most critical of these projects within the national economic corridor like this one. And we are going to put it forward for immediate funding because the President directed that none of such projects should stop now.” He admonished contractors handling road projects under the Federal Ministry of Works to ensure speed, quality, compliance with specification and sustainability in project delivery and cautioned that the attention of the anti-graft agencies would be called to any case of violation of the regulations or terms and conditions set out under the contract of every project handled by the Federal Ministry of Works. He stated, “I have also noticed in some of the projects in Rivers State, and same with the Six Geo-Political zones, that contractors go ahead to put stone base and put binder course of asphalt, sometimes over 20 kilometres and leave the binder unprotected without putting wearing course. The binder is like a reinforcement to the road architecture. The wearing is the sealant that doesn't allow water to go beyond the surface. And so when you now put stone base, which has dust as designed, and you put binder, which is like a reinforcement, and you see that the composition of the binder asphalt has bigger stones, and it has holes, so the water penetrates. The moment it gets to the stone base, which has some dust, the road fails. It may technically look safe, but with time, it will definitely fail. And we've seen it in a number of roads we inspected. And what I've directed the Controller to do, and it's going to be nationwide, is that when you are putting binder and you have left it for more than two months, we are going to redo the certificate and remove all the binder and remove the stone base.” He directed that henceforth any project below the contract sum of ₦20 Billion would not be given to expatriate firms, and this he said is part of measures to promote the Nigeria First policy of Federal Government of Nigeria. He commended the construction company handling the Eleme - Onne project, Reynolds Construction Company (RCC) for the quality of work so far done and for working on the project despite the fact that NNPCL has stopped funding the project, but frowned at the slow pace of work which they said was affected by the rainy season. He restated that 15th December 2025 remains the agreed deadline for the project’s completion with no extension or Variation of Price (VoP) allowed. “On this project of Eleme Junction, the quality of the work is excellent. The pace of the work is totally not acceptable. And let me make it very, very clear to the contractor that this project can never be reviewed by a kobo. Neither can there be any variation of price or any other claims.” He expressed dismay over the destructive habit of packing heavy duty vehicles on the road by drivers and warned that forthwith punitive measures would be taken against such perpetrators. “Our roads are not designed to carry these heavy trailers that are parking on the road. And the press should help us on that. When I was coming yesterday all the way from Aba to here, I saw that the trailers are taking over the entire roads, putting their waste, destroying the pavements, and so on and so forth. So I'm going to write to our dear Governors to see what they could help us to do about it, and will also complain to the Inspector General of Police. Let us see what we can do about it. Mr. President is doing everything possible to right the wrongs in terms of road construction. We are doing quality roads now that are going to last from 50 to 100 years. But it's being destroyed by ourselves.” Earlier, the Federal Controller of Works in River State, Engr. Enwereama Tarilade (Mrs.) said the contractor handling Eleme- Onne road had completed the 15km Eket bound on the right carriageway and had moved to the left carriageway which is Port Harcourt bound for which 1km stretch had already been done on Continuously Reinforced Concrete Pavement (CRCP).  Projects visited by the Honourable Minister include, the rehabilitation of Enugu – Port Harcourt, Abia/Rivers State, contract No: 6252 being handled by China Civil Engineering Construction Company Limited (CCECC), the upgrading of the 15km section of the East-West Road (Section 111A) from Port Harcourt (Eleme Junction) to Onne junction in Rivers State, contract No: 701 being handled by Messrs. RCC Nig. Ltd and multiple sections of the Enugu-Port Harcourt Expressway, including the sections handled by Arab Contractors and China Civil Engineering Construction Company Limited (CCECC). Hon. Barr. Orji Uchenna Orji Special Adviser (Media) to the Honourable Minister of Works Works ...

Sep
03
2025

NIGERIA MOVES TO UNLOCK TRANSFORMATIVE INFRASTRUCTURE AND GROWTH WITH GLOBAL PARTNERS The Federal Government of Nigeria has reaffirmed its commitment to strengthening collaboration with the Islamic Development Bank (IsDB) to deliver transformative development projects across priority sectors, particularly infrastructure. This came during a high-level meeting with the Vice President of the Bank, relevant stakeholders, held in Abuja and hosted by the Honourable Minister of Finance and Coordinating Minister of the Economy, Mr. Wale Edun at the Ministry’s conference room, today, 1st september, 2025.  In his remarks, The Honourable Minister of Finance, Wale Edun welcomed the IsDB delegation, describing the Bank as a steadfast ally in Nigeria’s development journey since 2005.“Your visit marks a significant moment in our shared journey of partnership, progress, and purpose. Despite fiscal constraints, Nigeria has continued to honor its obligations, and we deeply value the Bank’s flexibility in aligning with our realities,” he said. The Minister noted the success of IsDB interventions across education, healthcare, infrastructure, agriculture, and innovation, stressing that these projects are “lifelines for communities, engines of growth, and symbols of hope.” He underscored the alignment between Nigeria’s bold economic reforms under President Bola Ahmed Tinubu and the IsDB’s 2026–2035 Strategic Framework.   The Honourable Minister of Works, Engr. David Umahi, CON, FNSE, who was represented by the Minister of State for Works,  Mohammed Bello Goronyo, Esq,  emphasized the administration’s prioritization of road infrastructure under the Renewed Hope Agenda. He highlighted the Ilela–Lagos–Sokoto–Badagry economic corridor, describing it as a strategic lifeline that connects Nigeria to the Niger Republic and other African countries: “This corridor is a vital economic artery that will boost trade, create jobs, and lift communities out of poverty. President Tinubu’s commitment to this project reflects his determination to drive Nigeria’s economic transformation,” he stated.  The Honourable Minister of State also confirmed that construction works have commenced on the Sokoto and Kebbi sections, with Hitech Construction achieving clearance and 25 kilometers of work on the Kebbi axis. Other projects cited included the Lagos–Calabar Coastal Highway, Calabar–Nasarawa–FCT corridor, and the Abuja–Kaduna–Kano Expressway, all of which require additional financing to accelerate delivery. Responding to issues raised in terms of road infrastructure, the Operations  Vice President of the Islamic Development Bank, Dr. Rami M. S. Ahmad, reaffirmed the Bank’s commitment to Nigeria’s infrastructure agenda. He stated that Infrastructure is a core pillar of our strategy, and we work from each country’s own priorities. For the road projects raised today, we will not allow delays to persist; where they can be re-scoped, we will act; where not, we will close them and move forward with new initiatives. The Ilela–Lagos–Sokoto–Badagry corridor and other key projects align with our mandate, and through the Country Engagement Framework, we are ready to accelerate their delivery,” he assured. In closing, the Honourable Minister of Finance expressed his profound gratitude to the IsDB team for their assurances and reiterated that  Nigeria’s ownership and alignment of priorities under the Country’s  Engagement Framework. He said, “It is our bank, our sovereignty, our projects, our priorities. Today, my colleagues from Education, Environment, Transportation, Works, Water Resources and Sanitation, and my team from the Ministry of  Finance, have given a comprehensive insight into our key priorities and legacy projects. The time has come to move beyond frameworks and concept notes to implementation, beginning with the signing of the Abia State Integrated Infrastructure Development Project,” he affirmed.  The Honourable Minister of State for Finance,  Dr. Doris Nkiruka Uzoka-Anite, in her closing remarks, expressed her appreciation for the depth of engagement achieved during the meeting . “This dialogue has enhanced the strength of our partnership and the vast potential that lies ahead. From infrastructure and human capital to Islamic finance and the Nigerian economy, the opportunities for collaboration are both strategic and urgent. As custodians of Nigeria’s public finance, we are committed to deploying every naira transparently, efficiently, and in line with our national priorities,” she stated. Clement Ezeora  For: Director Press and Public Relations.  2nd September, 2025. ...

Aug
31
2025

Goronyo Calls for Stronger Workplace Safety Culture as Stakeholders Rally Support Minister urges collective action, commends President Tinubu’s Renewed Hope Agenda, and is decorated as Fellow of OSHA The Honourable Minister of State for Works, Mohammed Bello Goronyo, Esq., has reiterated the Federal Government’s unwavering commitment to strengthening workplace safety standards in Nigeria, stressing that occupational health and safety must remain a national priority for sustainable development. Speaking at a national stakeholders’ workshop on Workplace Safety and Health held on 28th August 2025, at the Ministry's Hall, the Minister emphasized that workplace safety is not merely a regulatory duty but a shared responsibility that requires the active involvement of government, the private sector, labour unions, professional bodies, and society at large. “When safety measures and protocols are enforced, accidents reduce drastically, productivity improves, and the human development index records significant gains. Protecting human lives must be at the center of every workplace policy and practice,” Barr. Goronyo stated. The Minister acknowledged existing challenges such as weak enforcement, inadequate regulations, and low awareness, but called for stronger collaboration among stakeholders to adapt global best practices to Nigeria’s realities. He commended the Occupational Safety and Health Association (OSHA) for its leadership in promoting international standards, while also applauding President Bola Ahmed Tinubu’s Renewed Hope Agenda, which he said “is already yielding results across all sectors.” Highlighting Nigeria’s workforce as one of the nation’s greatest assets, Goronyo warned that the loss of lives and productivity due to unsafe work environments cannot be ignored. Research, he noted, shows that organizations prioritizing workplace safety enjoy higher employee morale, reduced injuries, and improved efficiency. The workshop also featured goodwill messages from senior stakeholders: The Permanent Secretary of the Federal Ministry of Works, Engr. Olufunsho Adebiyi (represented by the Director, Central Workshop and Equipment, Engr. Atule Isaac), stressed that workplace safety is especially critical in high-risk sectors such as construction, oil and gas, and manufacturing, as well as in the informal economy where enforcement is weak. He urged employers to treat safety as part of production costs while encouraging workers to adhere strictly to safety guidelines. He reaffirmed that the Ministry remains committed to ensuring that workplace safety is upheld across all its operations and projects. Also speaking, the President of OSHAssociation UK, Nigeria Chapter, Mr. Aderemi (JP, FIMC, CMC, MCArb, FOSHA), represented by the Chairman, Council of Fellowship (OSHAssociation), Dr. Dalhatu Mohammed, described health and safety as both a moral and economic responsibility. He urged stakeholders to embrace prevention over cure, embed a safety-first culture across workplaces, and reiterated the Association's guiding principles. Rear Admiral (Rtd.) BEE Ibe-Enwo, FOSHA, Chief Technical Officer, OSHA Nigeria, highlighted alarming statistics showing that fatalities from workplace accidents rose from 71 deaths in 1997–1999 to 238 deaths between 2014–2016, underscoring the urgency of sustained action. In recognition of his exceptional leadership and advocacy, Barr. Goronyo was formally decorated as a Fellow of the Occupational Safety and Health Association (OSHA). The prestigious honor reflects his outstanding commitment to advancing workplace safety, health standards, and the promotion of safer work environments in Nigeria. Responding to the conferment, the Minister described the fellowship as a call to greater responsibility, pledging to deepen his efforts in protecting workers’ lives, promoting safer workplaces, and ensuring that safety becomes an integral part of national development. Abdullahi Ameen Mohammed, For:  Director, Press and Public Relations 28th August, 2025 ...

First First First

LIVE ACTIVITY FEED

PUBLIC ANNOUNCEMENT


Nov
03
2025

  


OTHER NEWS

Feb
22
2023

Oyo People Eulogise FG For Infrastructure Development

The people of Ibadan, the capital of Oyo state were full of joy and gratitude as the Federal Government commissioned  and handed  over a 0.75 kilometre  internal road to the National Centre for Generic and Biotechnology Agency, ( NACGRAB) located at  the National Cereals Research Institute Complex in Ibadan in  Oyo State rehabilitated by the Federal Ministry of works and Housing.

Speaking at the occasion, the Honourable Minister of Works and Housing Mr. Babatunde Raji Fashola, SAN, represented by the Federal Controller of Works, Oyo State, Engineer Kayode Ibrahim revealed that Oyo State is benefitting tremendiously from the  federal government road projects. He said, " I can testify that a number of roads have received attention, from Lagos to Ibadan and Shagamu to Ibadan roads. We are pushing to finish them before May,2023."

Fashola added that  "When you go round the state you will see that work is going on in many places at a great speed." He said that the Ibadan-Ife - Ilesa road was a night mare to road users before now, adding that Iwo road to Asejire to Ife is also presently receiving massive attention .

The Minister also confirmed that the contract for the rehabilitation of Ibadan - Oyo road had been awarded and the contractors are ready to hit the ground running.

He also disclosed that "Reynolds Construction Company, (RCC) is working round the clock on the Oyo Ogbomosho road with the aim of connecting it to the highway at the end of this year." The Minister also disclosed that work is  on going at the Ogbomosho road because all obstacles had been removed and funds also   released. 

Babatunde Fashola in the same vain said that  construction work is currently on going in a session  at Oke - Ogun called Okerete from Shaki which is about a hundred kilometres, this previous administration had abandoned. 

He also said that Isaleadini road that was abandoned for long  and Okeohun road are receiving attention while road users are currently plying them freely with ease. 

The Minister said other projects implemented by the Buhari administration in Oyo State include, the school of Survey, an internal road at University College Hospital, UCH, Ibadan and Moor Plantation.

In his welcome address,  the Director of The National Centre for Generic and Biotechnology,( NACGRAB) Dr. Anthony Okere who was represented by Dr. Abisoye Ojo  expressed gratitude to the Federal Government for the internal road intervention project. The Director said access road to the Animal Generic Resource and Field in NACGRAB had worsened over the years due to gully erosion and transportion  of  farm equipments, livestock and their feeds as well as  mobility of staff and guests of the Centre had been a nightmare but with the rehabilitation of the road by the Federal Ministry of Works and Housing it has become a thing of the past.

Officials  of some other Federal organisations such as the National Cereal Institute, Regional Office of the Federal Ministry of Agriculture, Nigerian Institute of Animal Science with office and residential accommodation within the NCRI Complex expressed appreciation to the Federal Government for the work done. 

This road network will benefit about fourteen organisations both state and federal, who are being accommodated within the complex.

SPEECHES

Aug
24
2022

Opening Remarks By The Permanent Secretary, Federal Ministry Of Works And Housing, Bashir Nura Alkali, At The 28th National Council Meeting On Works, Holding In Kano, Kano State On Wednesday, 24th August, 2022

 Protocols

The Hon Com for Works & Infrastructure Engr Idris Wada Saleh

The PS Kánó State Min for Works and Infrastructure Arc Ahmed Salisu

Permanent Secretaries here present

President NSE here represented

MD FERMA

SOGOF
Federal Controllers of Works here present

President Surveyor’sCouncil of Nigeria

Directors from the FMWH and other MDAs both state and Federal

Reps of other agencies both state and federal

Members of the Press

Ladies and gentlemen

2.    I am pleased to welcome you to the 28th Meeting of the National Council on Works holding in Kano, Kano State which incidentally is also my home state. As you are aware, the theme for this year’s National Council Meeting is “Infrastructure, the Season of Completion”. The theme is apt and timely, considering the push by all governments at this point to complete and commission most of its roads and bridge projects initiated and/or inherited.

3.     Accordingly In order to ensure that the target of completing and commissioning of these projects is achieved, it has become necessary for all stakeholders to consider and provide creative and contemporary ideas and policy suggestions that will support the attainment of the above target. You may recall that a few weeks ago the National Council on Housing was also held in Sokoto where far reaching decisions were taken on sustainable development in the housing sector especially with a view to the provision of social housing and other related matters.

4. I must at this juncture thank our esteemed host, the Governor of Kano State, His Excellency Dr. Abdullahi Umar Ganduje, OFR (Khadimul Islam) and the good people of Kano State for the gesture of receiving us to deliberate on this crucial theme that was carefully chosen to ensure that the massive spending of public funds by governments at all levels in Highways and other roads infrastructure to ensure smooth mobility and access is duly accounted for through completed and commissioned road infrastructure across the country. It is of special note that the Kano State Government under his able stewardship has brought tremendous developments in the road sector that are worthy of emulation.

5 The Meeting is therefore significant as it will afford stakeholders the desired opportunities to identify some of the challenges in the highways and related sectors that could militate against successful completion and commissioning of roads in the country as this Administration winds up and to discuss strategies and possible practical solutions towards addressing them.

6. We are required to have the objectives of the National Development Plan 2021 - 2025 in mind as we look at ways of ensuring that road projects are completed and commissioned in order to galvanize national growth and sustainability. I am aware that our directors and other executives in the road sector have spent the last two days discussing these issue and these should form the basis for our discussions and our recommendations for the consideration of the council. Our recommendations should focus on restoring economic growth, the ease of doing business, local content utilization, investing in our people and creating a competitive economy through the availability of good and completed road network across the country.  

7. Distinguished delegates and officials, the timing of this meeting, therefore, is very auspicious as it affords us the opportunity to think through and make necessary arrangements as well as take critical steps to ensure that road infrastructure projects are completed, commissioned as well as maintained throughout their lifespan. This will also ensure that money spent on roads and bridges impacts on the Nigerian economy and the citizens positively.

8. Finally, Let me take this opportunity to thank all those other officials and experts who have made this council meeting a success especially the Hon Comm Kánó State Ministry of Works and Infrastructure, the Permanent Secretary, Directors from the FMWH and other Federal and State MDAs, Our Dev Parners, the Local Organizing Committee, the Press and Security Agencies. I thank you most sincerely.

9. On this note, I once again welcome you all and wish us fruitful deliberations.

10. Thank you

 

PHOTO NEWS

Jun
02
2025

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

Click To View More Pictures

PHOTO NEWS

Apr
28
2025

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

Click To View More Pictures