“THE WORST IS OVER; OUR GDP IS GROWING MORE THAN OUR POPULATION. THAT MEANS WE HAVE A FUTURE” - UMAHI TELLS NANS — As Nigerian Students Induct Him as Grand Patron, Hail Him as “One of the Finest” in Tinubu’s Renewed Hope Cabinet The Minister of Works, Senator Engr. David Umahi, CON, has declared that Nigeria is now seeing stronger economic outlook under President Bola Ahmed Tinubu, noting that the country’s Gross Domestic Product (GDP) is now growing faster than its population. Umahi made the declaration on Monday, August 10, 2026, at the headquarters of the Federal Ministry of Works in Abuja, while speaking after he was formally inducted as Patron of the National Association of Nigerian Students (NANS). The minister described the development as a positive indication of Nigeria’s economic prospects, saying, “I was enthused to find out that our GDP is growing more than our population. That means we have a future.” The NANS leadership, led by its President, Dist. Comr. Akinteye Babatunde Afeez, GCNS, had earlier commended Umahi for his contributions to national infrastructure and described him as “a worthy member of the Renewed Hope Cabinet and, indeed, as one of the finest public servants Nigeria has produced in the contemporary era.” The students said the recognition was not merely ceremonial but a reflection of Umahi’s visible contribution to road infrastructure and national development under President Bola Ahmed Tinubu’s administration. According to NANS, the roads and bridges being delivered under Umahi’s supervision are directly connected to the lives of Nigerian students, affecting their mobility, access to educational institutions, examinations, internships, businesses and employment opportunities. The students specifically cited major projects including the Abuja-Kaduna-Kano Expressway, Abuja-Kaduna-Minna route, Enugu-Port Harcourt Expressway and Lagos-Calabar Coastal Highway as examples of projects they said demonstrate the Federal Government’s commitment to improving national connectivity. Afeez also disclosed that NANS had studied project reports of the Federal Ministry of Works covering the period between May 2023 and May 2026 and expressed its intention to embark on nationwide project tours to inspect completed and rehabilitated projects. He said the students would use their platforms to communicate the impact of the projects to millions of Nigerian students, Nigerians and the wider world. Responding, Umahi challenged Nigerian students and young people to look beyond political sentiments and examine the policies and achievements of the Tinubu administration objectively. “We have had somebody say, ‘President Tinubu is tired.’ How do you know he is tired? I am part of President Tinubu. The Minister of Interior, the FCT, all the ministers and all the SSAs are vibrant and working. So how do you just jump at that conclusion?” The minister urged Nigerians to demand concrete alternatives from those criticising the administration. “If you say that the President is not doing well, what is your alternative?” he asked, stressing that political promises must be backed by clear plans and a credible mission. He also called on students and other young Nigerians to take a position on issues affecting the country, arguing that remaining neutral in the face of visible progress was not always the right approach. “You may say that you are not politicians or that you will not take sides, but this is the time to take sides in our national affairs. It is time to take a stand,” Umahi said. On the economy, the minister acknowledged that the macroeconomy was only beginning to recover but urged Nigerians to consider the condition of the economy before the present administration took office and assess the reforms objectively. “You may say that the macroeconomy is just beginning to recover. What was it like before the President took over? Everybody agrees that the macroeconomy is being fixed. It is up to you to dissect the ongoing reforms and take a position.” Umahi also pointed to developments in the education sector, saying the stability being witnessed under the Tinubu administration had created an environment in which students were able to continue their studies without the disruption of nationwide strikes. “For the first time, students never went on strike. Never. Look at the stability of Nigeria. That has never happened throughout the history of this country.” “Where is the subsidy money?” Umahi explains Addressing questions surrounding the removal of fuel subsidy and where the resulting resources were being deployed, Umahi pointed to the scale of ongoing infrastructure projects across the country. He cited the Abuja-Kaduna-Zaria-Kano road, which he said covers 375 kilometres and, when measured as a dual carriageway, amounts to 750 kilometres. According to the minister, more than ₦200 billion has already been spent on the project, with 480 kilometres of the dual carriageway completed and further sections nearing completion. “For the first time, we have been able to complete 118 kilometres of concrete pavement within 30 months. That has never happened,” he said. The Minister said the remaining works were expected to be completed by November, noting that the two projects on the route have a combined cost of ₦752 billion, with more than 80 percent already paid. He also highlighted the Sokoto-Zamfara-Zaria corridor, the Benue-Ninth Mile road, and the Bodo - Bonny Island road as examples of projects receiving significant attention under the Tinubu administration. On the Bonny Island project, he said: “For the first time, people will move from the island to the mainland in Bonny Island, where the LNG is produced. A project costing ₦280 billion under President Bola Ahmed Tinubu has been completed. The 39.7-kilometre road is fully done, and the people of Bonny are very happy. They are no longer dying at sea. They are now driving through the land.” The minister also spoke extensively about the administration’s legacy road projects, including the Lagos-Calabar Coastal Highway and the expanded Northeast Fourth Legacy Project. He disclosed that the Northeast project, originally running from Akwanga through Jos, Bauchi, Gombe and Biu, had been extended through Yobe to Maiduguri, adding another 400 kilometres to the project. Umahi defended the Lagos-Calabar Coastal Highway against criticisms, saying the project was strategically important to the Niger Delta and would be completed. “I do not know why people are attacking the Lagos-Calabar Coastal Highway. After all, this is coming from the Niger Delta, where the oil is coming from. Why is nobody attacking the other three Legacy Projects, but this one is being attacked? That is unfair and unrealistic. That project will be completed. In fact, over 50 percent of the entire stretch is already under construction.” The minister also used the occasion to speak about the development of the Southeast, saying President Tinubu had deliberately embarked on projects aimed at integrating the region into the national infrastructure network. “The Southeast, for the first time, is being remembered, and I thank the people in the Southeast because sometimes I say, ‘Listen, our people should not be sentimental.’” He said the administration’s approach to the region was intentional and urged the people of the Southeast to work with other parts of the country. “The President has a good intention to integrate the people of the Southeast, and I have to be very honest with you. If I were not a minister from the Southeast, we would not have been able to get the projects we have secured. It is intentional on the part of Mr. President. Go and right the wrongs of the Southeast.” Umahi cited the Enugu-Onitsha Expressway and Enugu-Port Harcourt Expressway among the major projects transforming connectivity in the region. He also disclosed that President Tinubu had approved the re-scoping and reconstruction of the Lokoja-Benin-Warri corridor, covering a total of 401 kilometres. The minister was particularly direct in urging the students to support President Tinubu in the 2027 election, arguing that Nigerians should support the administration if they believe its policies are producing results. “I want you to take a side. If you say you are on the list of a coalition and you say that what we are doing is good, then we have to take a stand to vote for the President in the coming election.” Umahi also urged Nigerians to look beyond political rhetoric and focus on practical solutions to the country’s challenges. “Listening to others should not mean allowing yourselves to be insulted or blackmailed. Cheap talk will not solve our problems. Nobody is saying what he or she can do differently. The worst is over. The darkest part of the night is an hour before dawn.” He pointed to the decline in food prices as one of the developments Nigerians should consider in assessing the economy, recalling that a 50-kilogramme bag of rice, which he said had risen above ₦80,000 and at some point reached ₦100,000, was now selling at about ₦58,000. Umahi also stressed the administration’s commitment to transparency in the execution of road projects, saying the Ministry of Works had opened its projects to scrutiny by anti-corruption agencies. “Now, why are we doing this? Transparency. We have turned these projects over to the ICPC. They have gone round. We are ready for constructive criticism, and where necessary, we will make amends.” He added that the Ministry had also written to the Economic and Financial Crimes Commission (EFCC) to inspect its projects. “We have nothing to hide in this administration.” The minister urged NANS to organise a major student engagement across the geopolitical zones where students could ask questions directly and hear the government’s explanations on its policies and projects. “Let me defend this administration. Organise it and let me come. Move students from across the zone to a central point where we can talk to them and address their concerns. We have to deliberate on the issues. We have to debate them. Ask your questions, and we will answer them.” He said he would attend such engagements with some ministers and Senior Special Assistants to the President, stressing that students were important stakeholders in the country’s future. Umahi further challenged young Nigerians to take responsibility for protecting public infrastructure and contributing positively to national development. “See something, say something. Together, we can take back our country because it belongs to us.” He said the responsibility for the performance of government should be placed on the officials directly responsible for specific sectors, rather than on the President for every operational issue. “I am here because the President gave me the responsibility to be in charge of roads and bridges. If I do not do it, I should be the one to be blamed, not the President. I am not the President. The President has divided himself into a number of his appointees. These appointees should be the ones to answer and take responsibility.” The minister concluded by thanking the students for the recognition and expressing his readiness to deepen collaboration with NANS. “I want to thank you very much.“ He described the students as important partners in the national development process and encouraged them to remain informed, ask questions and hold leaders accountable. The NANS President, in his address, said the association considered Umahi worthy of its patronage because of his record of public service, infrastructure delivery and commitment to national development. He said the roads being constructed under Umahi’s leadership would outlive the present administration and continue to serve generations of Nigerians. “History will not remember public officers merely because they occupied important offices. History will remember them for what they built, what they changed and the lives they touched.” Afeez formally welcomed Umahi into the NANS family as Patron, describing the partnership between the student body and the Federal Ministry of Works as an opportunity to bring government projects closer to young Nigerians and deepen informed national discourse.
“Let him finish. Let him take back our country. Let him reposition our country.”
UMAHI, NIGER GOVERNOR STRENGTHEN COLLABORATION TO FAST-TRACK FEDERAL ROAD PROJECTS The Honourable Minister of Works, H.E. Sen. Engr. David Umahi, CON, FNSE, FNATE, has reiterated the Federal Government’s determination to accelerate the delivery of ongoing Federal road and bridge projects in Niger State, following a high-level meeting with the Governor of Niger State, His Excellency, Farmer Umaru Mohammed Bago. Speaking during the meeting held at the Ministry’s headquarters, Mabushi-Abuja today, 28 January, 2026, the Minister commended Governor Bago for his untiring efforts toward infrastructure development and urban renewal across Niger State. He noted, with appreciation, that many of the state government's interventions are on Federal road corridors that directly benefit the citizens. Engr. Umahi acknowledged the numerous challenges associated with Federal roads in the State, stressing that road infrastructure development is a shared responsibility, irrespective of jurisdiction. He praised the significant interventions in areas such as Bida, Minna, and Suleja, describing them as impactful urban renewal efforts that have enhanced mobility and boosted economic activities. The Minister assured the Governor of the Federal Government’s strong support, particularly on key projects including the Minna–Suleja Road (71km), which has received approval from the Bureau of Public Procurement (BPP) and is awaiting consideration by the Federal Executive Council (FEC). He disclosed that President Bola Ahmed Tinubu, GCFR, has personally directed that the project be prioritised and assured that any advance intervention funds expended by the Niger State Government would be refunded. On the Jebba and Lambata Bridges, the Minister informed his August visitor that integrity tests and work on the expansion joints are ongoing. Engr. Umahi stressed the urgent need to curb indiscriminate parking, trading activities, and traffic congestion on bridges, which accelerate their structural deterioration. “Bridges are not designed to carry static loads but built for the dynamic flow of traffic,” he advised. He announced plans to engage key stakeholders, including transport unions and tanker drivers, to safeguard national assets and extend the lifespan of bridges. The Minister further disclosed that all ongoing NNPC-funded road projects, nationwide, have now been approved for takeover by the Ministry, in line with Mr. President’s directive. Funding templates are currently being finalised to ensure the seamless continuation of works on such projects. He also directed officials of the Ministry to provide comprehensive status reports on all Federal road projects in the state to enable prompt interventions, where required. Earlier, Governor Bago expressed appreciation to the Minister and his team for their responsiveness and collaborative approach. He highlighted the strategic importance of Niger State as Nigeria’s central corridor linking the North and South, with over 100,000 trucks traversing major routes in the State on a daily basis. The Governor raised concerns about severe traffic congestion, infrastructure degradation, and security challenges along critical corridors, such as Jebba–Lambata–Minna–Suleja. He called for urgent attention to the structural integrity of the Jebba Bridge and other heavily trafficked bridges, emphasising the need for structural testing, traffic control measures, and accelerated rehabilitation works to avert potential disasters. Governor Bago also commended the Federal Government for the ongoing concrete pavement works on the Abuja–Kaduna Expressway and urged that similar durable solutions be applied to other major highways in the country. Both leaders reaffirmed their commitment to sustained collaboration to fast-track federal road projects, enhance road safety, stimulate economic activities, and improve the quality of life for the people of Niger State and Nigerians at large. ...
FG Insists on Speed and Quality as Goronyo Inspects Sokoto–Gusau–Zaria Road Project The Federal Government has reaffirmed its determination to ensure the timely and high-quality delivery of the Sokoto–Gusau–Funtau–Zaria Road Project, warning that contractors who fail to meet agreed timelines and specifications risk sanctions. The Honourable Minister of State for Works, Rt. Hon. Bello Muhammad Goronyo, Esq., stated this on Sunday, 25th January, 2026, during an on-the-spot assessment of reconstruction works along key sections of the 750-kilometre highway spanning Sokoto, Zamfara, Katsina and Kaduna States. Speaking during the inspection of sections from Dange to Shuni in Sokoto State, and onward through Talata Mafara, Maru and Bungudu in Zamfara State, the Minister stressed that the Federal Government would not tolerate undue delays on projects of critical national importance. According to him, the inspection exercise was conducted in line with the directive of President Bola Ahmed Tinubu, GCFR, to ensure strict compliance with approved standards, value for money, and early delivery of projects meant to ease transportation challenges and stimulate economic activities. “I am personally leading senior officials of the Ministry across these states to verify the quality of work being delivered and to ensure that contractors live up to their responsibilities,” Rt. Hon. Goronyo said. He added, “I am also representing the Honourable Minister of Works, Engr. Dave Umahi, GCON, to assess the level of work done and the degree of compliance with approved specifications.” While noting that some sections of the project recorded commendable progress, the Minister expressed concern over the overall pace of execution, stressing the need for contractors to accelerate work in order to reduce hardship faced by road users. He cited the Sokoto–Tureta–Mafara section, which has attained about 27 per cent completion, as relatively encouraging, but expressed dissatisfaction with the Mafara–Maru–Gusau section, where progress stands at approximately 16 per cent, describing it as unsatisfactory. The Minister warned that the Federal Government is prepared to restructure the project scope on underperforming sections, including restricting contractors to shorter distances and reassigning outstanding portions to more competent firms if noticeable improvement is not achieved. Rt. Hon. Goronyo explained that earlier challenges linked to compensation for affected properties had been resolved, crediting the intervention of Governor Ahmed Aliyu of Sokoto State for facilitating payments and ensuring community cooperation. He also acknowledged the role of the National Security Adviser, Malam Nuhu Ribadu, in coordinating security support that has enhanced safety for workers and equipment along the corridor. Reiterating the Federal Government’s broader infrastructure strategy, the Minister noted that the adoption of concrete pavement technology under the Tinubu administration is aimed at delivering more durable, cost-effective, and long-lasting road infrastructure nationwide. He further highlighted the ongoing 1,068-kilometre Sokoto–Badagry Super Highway Project as a landmark initiative that revives the long-standing vision of former President Shehu Shagari, adding that it would significantly enhance connectivity, boost trade, and promote national integration. Rt. Hon. Goronyo commended President Bola Ahmed Tinubu, GCFR, for infrastructure development the priority it deserves, describing road infrastructure as a critical enabler of economic growth, national integration and shared prosperity. He noted that the President’s unwavering commitment to revitalising key transport corridors across the country is already yielding tangible results under the Renewed Hope Agenda. Goronyo also praised the Honourable Minister of Works, Engr. Dave Umahi, GCON, for his hard work, visionary leadership and dedication to delivering the mandate of the Ministry, adding that the ongoing reforms and adoption of durable construction standards reflect a clear focus on value, sustainability and long-term impact. “The Renewed Hope Agenda is about results. Nigerians deserve roads that last and projects that are completed on time, and this administration is committed to delivering just that,” the Minister stated. The inspection tour was accompanied by top management staff of the Ministry of Works, including Mr. U.B. Ekong, Director, Highways Construction and Rehabilitation, and Mr. C.A. Ogbuagu, Director, Highways Planning and Development. The Minister and his team also engaged with host communities, assuring residents that remaining compensation and project-related concerns would be addressed to ensure smooth and uninterrupted execution of the project. ...
FG RECORDS SIGNIFICANT PROGRESS ON KEY ROAD PROJECTS IN JIGAWA STATE In accordance with one of the eight items on the Renewed Hope Agenda of the Administration of His Excellency, President Bola Ahmed Tinubu, GCFR, which is the enhancement of infrastructure and transportation as enablers of growth, a Media Tour of ongoing projects in the North West Zone has been concluded with Jigawa State. The Tour also featured the Commissioning of Emergency/Special Intervention Projects in the State. The exercise showcases the Federal Government’s determination to deliver critical road infrastructure to Nigerians, with substantial progress recorded on several ongoing works and the pouring of encomiums by host communities across the states. Speaking in Gumel, the Federal Controller of Works (FCW), Jigawa State, Engr. Yusuf Mahmoud, disclosed that work is progressing on the Reconstruction of the Kwanar Danja–Tsalle–Hadejia Road. The project, being executed by Gerawa Global Engineering (Nigeria) Plc, is a 117-kilometre (Phase 1) reconstruction awarded in February 2022. The scope of work includes reconstruction of the existing carriageway, construction of lined drains, and installation of culverts to improve drainage, enhance road durability, and protect adjoining communities from flooding. Engr. Mahmoud explained that although the project was initially scheduled for completion in February 2025, delays were encountered due to challenges related to advance payment and budgetary provisions. He, however, noted that these issues have since been fully resolved, enabling the contractor to return to the site with renewed momentum. “It has attained about 75 per cent completion, with nearly 79 kilometres already reconstructed. Construction is ongoing simultaneously from the Gumel and Hadejia ends, with two teams (gangs) deployed to fast-track delivery,” he stated. The Project Manager of the company, Engr. Ibrahim Abubakar, confirmed that the company has mobilised extensive equipment, multiple asphalt plants, and deployed more personnel along the remaining alignments to accelerate completion. “With all challenges being surmounted, we are working with two construction gangs from both ends of the road. Our target is to complete the project before December 2026, ahead of the revised completion date of February 2027,” he confirmed. He further assured a cordial relationship with host communities, explaining that temporary work stoppages during peak rainy periods were unavoidable due to safety and technical considerations. The Chairman, Nigeria Union of Road Transport Workers (NURTW), Gumel Branch, Salisu Muhammed, alongside another stakeholder, Mas’ud Usman, expressed satisfaction with the work, noting that travel time and cost of transportation, as well as vehicle maintenance have significantly reduced compared to the previous condition of the road. They commended the present administration for its commitment to road infrastructure development. The team also assessed progress on the Kunya–Kanya–Babura–Babban Mutum Road, a 47-kilometre rehabilitation project being executed by CRCC Construction Company (Nigeria) Limited. While briefing, the FCW, Engr. Mahmoud disclosed that the project has reached 82 per cent completion, with about 37 kilometres already rehabilitated. The remaining sections are expected to be completed within the year, following the resolution of earlier challenges. He noted that upon completion, the road will significantly boost cross-border trade due to its proximity to the Nigeria-Niger border, facilitate the movement of agricultural produce, and enhance regional connectivity. The Project Manager of the construction firm, Mr. Du For, highlighted the strong collaboration between Nigeria and China, assuring that the company remains committed to executing the project in tandem with approved specifications. Members of the benefiting communities on the corridor and road users thanked the Federal Government for hearing their complaints and for its inclusivity. Malam Audu Ibrahim stated that “The Government is trying and we really like the President because of the road. It has opened up business opportunities,” he added. In addition, the Chairman, Nigeria Union of Journalists (NUJ), Jigawa State Council, Comrade Ismail Ibrahim, commissioned, on behalf of the Minister of Works, the Special Repairs of the Kano State Border–Dutse–Kiyawa–Bauchi State Border Road, an emergency intervention project approved under the 260 Emergency Road Projects. The project commenced in March, 2024 and was completed in December 2024, restoring the road from a severely deteriorated condition to a safe and motorable state. A community representative, Mustapha Isah, expressed appreciation for the quick response, while appealing for the provision of additional drainage infrastructure to address perennial flooding challenges. At the conclusion of the National Media Tour to the North-West, the Senior Special Adviser to the President (SSA-P) on Community Engagement, North-West, Hon. Abdullahi Tanko Yakasai, once again, commended the Federal Government for prioritizing road infrastructure in Jigawa State, describing the projects as critical to the state’s agrarian economy. He added that the projects align with the Renewed Hope Agenda of President Bola Ahmed Tinubu, GCFR, and commended the Honourable Minister of Works, Sen. Engr. David Umahi, CON, FNSE, FNATE, the Minister of State, Bello Muhammad Goronyo, Esq., and all stakeholders for their sustained efforts to improve Nigeria’s road infrastructure. ...
6th Babatunde Raji Fashola (BRF) GABFEST To Hold June 28
As part of efforts targeted at creating a platform for the active involvement of the youth in Nigeria’s future, the 6th Babatunde Raji Fashola (BRF) Gabfest will hold next week, Tuesday 28th June, at 11a.m as a ZOOM Webinar (bit.ly/gabfest6).
The BRF Gabfest which holds in honor of the 59th birthday celebration of Legal practitioner and Public Servant, the Honorable Minister of Works and Housing, Babatunde Raji Fashola, SAN, is expected to have in attendance stakeholders from the public and private sectors, as well as members of the general public.
This year’s event which is themed: ‘What am I voting for?’ is anticipated to have numerous attendees and is open to members of the public via a registration link (bit.ly/gabfest6).
The BRF Gabfest will feature 6 speakers on a panel, who will offer constructive insights cut across both the public and private sector, and offer the audience a chance to also engage on issues pertaining to the theme.
Now in its 6th year, the goal of the BRF Gabfest is to create an interactive platform where the role of the youth in Nigeria’s future will be discussed and heard. It is targeted at those who are sincerely concerned about the future of Nigeria, and the role young people have to play in that future.
REMARKS BY THE HONOURABLE MINISTER OF WORKS AND HOUSING, MR BABATUNDE FASHOLA, SAN AT THE PROJECT COMPLETION AND HAND OVER ON TUESDAY, 21ST JUNE, 2022 AT UZERE VILLAGE, DELTA STATE
On behalf of the Federal Government of Nigeria and President Muhammadu Buhari, I bring good tidings to the peoples and Government of Delta State, who will be impacted by the Isoko Ring Road that our President will hand over today.
My principal message to you all is that this is the first of the second phase of project Completion and Handovers our country will be witnessing as we progress further in this season of completion and impact which started in the last quarter of 2021.
In this second phase of completion Mr. President has also approved that Ministers from the various States where projects have been completed should represent him to perform the handover formalities.
The other handing over formalities that will follow these formalities which we flagged-off in Ekiti and Jigawa States, will also be in:
Yobe for Section II and Phase I of the Nguru – Gashua – Bayamari Road covering Gashua to Bayamari; Section I, Phase II covering Nguru to Gashua;
Nasarawa for Lafia – Obi – Awe – Tunga Road; and
Gombe for Phase II of the Gombe – Numan –Yola Road covering Gombe – Kaltungo.
These projects represent major investment in road Transport infrastructure, which is a commitment of the Buhari administration as a driver for economic growth and prosperity.
They are visible and incontrovertible Assets in proof of what Nigeria’s resources are invested in, from a combination of our earned resources, and borrowings.
This occasion affords the opportunity to restate that in addition to other innovative sources of funding, our Budgetary provisions are also being diligently applied to complete projects such as these.
I want to express deep gratitude to the Ministry of Finance, and the members of the National Assembly, especially the Chairmen of the Senate and House Committees on Works in the 8th and 9th Assembly for their support.
To our staff and contractors who have worked very hard to bring these projects to conclusion I also say thank you, as I cannot fail to acknowledge the cooperation of the host communities where these projects pass through or are hosted.
I hold them out as examples of what peace can achieve, and the investments that collaboration and some sacrifice can deliver if we embrace partnership with Government.
Ladies and Gentlemen, none of these would have been possible without the support of Ministers in the Federal Executive Council during debates over the projects.
To all Ministers in the first term and this current term, I express gratitude on behalf of the Ministry of Works and Housing for your support.
To the President and Vice President who preside for long hours over the Council meetings, your leadership is now bearing fruits and the evidence of change is now manifesting.
Ekiti/Osun, Gombe, Yobe, and Nasarawa among several other States bearing witness and there is more to come.
Thank You.
BABATUNDE RAJI FASHOLA, SAN
MINISTER OF WORKS AND HOUSING
DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE
DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE
MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1
MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1