Federal Ministry of Works (FMW)
... building the backbone for Development ...
Follow Us:
Welcome To Federal Ministry Of Works.
Minister Federal Ministry Of Works Engr. David Umahi.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Jul
07
2026

LATEST PRESS

MINISTER UMAHI: LAGOS–CALABAR COASTAL HIGHWAY DESIGNED TO MITIGATE, NOT CAUSE FLOODING

 

The Honourable Minister of Works, Engr. David Umahi, CON, FNSE, FNATE, has dismissed claims that the Lagos–Calabar Coastal Highway is responsible for flooding in parts of Lagos. He insisted that the project is designed to improve drainage and facilitate the evacuation of floodwaters from shoreline communities.

Speaking during an on-the-spot assessment of the completed and ongoing sections of the Coastal Highway with Members of the National Assembly, Senior Special Assistants to the President (SSAs-P), Officials of the Federal Ministry of Environment and the media, he explained that the Ministry had earlier held discussions with Officials of the Lagos State Government on the need for dredging and other environmental mitigation measures to address flooding in the affected areas.

The Minister attributed the persistent flooding largely to *indiscriminate dumping of refuse, blockage of drainage channels and manholes, and gross violations of environmental regulations* by some residents. He stressed that the highway itself is not the cause of flooding but rather part of its long-term solution.

_"You can see people blocking manholes and creating hazards to the environment. Many complaints about flooding are caused by human activities, not the road project,"_ the Minister emphasised.

Engr. Umahi assured stakeholders that the Federal Government, in collaboration with the Lagos State Government, is implementing *environmental remediation measures*, including dredging, drainage improvement, and strict enforcement of the approved “Right of Way.” He warned that structures obstructing drainage channels or violating the approved setbacks would be removed.

According to the Minister, the Lagos–Calabar Coastal Highway incorporates *modern engineering features*, including adequate culverts, drainage systems, and embankments designed to manage stormwaters effectively. He further explained that the project complements other flood-control interventions such as those around the *Aqua Atlantic development and Oshodi*.

Engr. Umahi informed that the visit is coming at the instance of the directive of *President Bola Ahmed Tinubu, GCFR*, whose administration remains committed to protecting lives, properties, and critical infrastructure, while promoting sustainable development.

The Minister announced that a *Stakeholders' Engagement* involving the Senate and House Committees on Works, the Federal Ministry of Environment, Office of the Surveyor General of the Federation, Lagos State Government, representatives of concerned Associations of Landlords and other relevant Government Agencies, is scheduled for today, Tuesday, 7 July, 2026. The engagement aims to address environmental concerns, step up awareness campaigns on environmentally friendly practices and the dangers of the unfriendly ones, as well as deepen collaborative efforts in flood management.

He commended *Members of the National Assembly, the Governor of Lagos State, the Minister of Environment, SSAs-P (Community Engagement), Staff of the Ministry, and Hitech Construction Company, and other stakeholders* for their cooperation and assured residents that blocked drainage channels and refuse dumps along the project corridor would be cleared.

The *SSAP on Community Engagement, South West, Moremi Ojudu,* called for collective responsibility in addressing environmental and human factors, emphasising the President's commitment to environmental sustainability. The *Director of Environmental Impact Assessment,* Federal Ministry of Environment, highlighted the growing impact of climate change and the unique environmental challenges facing Lagos. On the Environmental Impact Assessment of the Project, she confirmed that approval was given before its commencement.

Commenting, the Minority Whip of the Senate, Sen. Onyekachi Nwaebonyi stated *the history of flooding in Lagos is as old as the city itself, and we have seen, as a Parliament, that the reason for the flooding is not the Coastal Highway.”*He advised that the opinions of environmental experts be adhered to in finding remedial and preventative solutions to a global problem.

In their separate remarks, the *Chairman of the Senate Committee on Works, Senator Allwell Onyesoh*, and the *Chairman of the House Committee on Works, Hon. Akin Alabi* commended the Minister's swift response to Mr. President's directive. They observed that flooding existed before the commencement of the Coastal Highway, ascribing it to the effects of global warming, requiring proactive solutions.

To further safeguard the completed sections of the Highway, the Minister directed the *Federal Controller of Works, Lagos State, Engr. Olufemi Dare* to ensure full compliance with environmental safety standards. He also announced the recruitment of *40 personnel — 20 for day duty and 20 for night* — to monitor the highway, prevent stealing and vandalisation of road furniture, and discourage illegal dumping of refuse.

Engr. Umahi concluded by guaranteeing residents along the alignment that all environmental concerns raised during the inspection would continue to receive prompt attention through sustained stakeholder engagement and effective mitigation measures.

 

 

Feb
18
2024

Umahi Gives Termination Notice to Contractor Handling a Section of Enugu-Port Harcourt Highway for Non-Performance ....Minister commends President Tinubu for funding highway rehabilitation, construction projects. The Honourable Minister of Works, Sen. Engr. Nweze David Umahi, CON, has directed that 14 days termination notice be issued to Messrs. China Civil Engineering Construction (CECC) which is handling the Abia Section of Enugu-Port Harcourt Highway currently undergoing rehabilitation for reason of non-performance.   The Honourable Minister gave the directive this Sunday when he inspected the progress of work at Ozuaku, after Imo bridge along Enugu- Port Harcourt expressway.   According to Sen. Umahi “I've just directed that they should issue them 14 days termination notice using all due process on construction. After 14 days, if they fail to do what we have asked them to do, then we will have to do the termination notice.”   Adding “We will no longer tolerate the situation where contractors will put blank ranks on site. And they will be escalating construction costs by delaying the completion of project date.”   Continuing, he said “and we have reached an agreement in Ministry of Works that in the coming weeks, all non-performing contracts using due process will be terminated and re-awarded.”, he disclosed.   The Honourable Minister explaining the reason why contractors should demonstrate commitment said, “We let them know the suffering of Nigerians. We are here to help them, and we will do everything to help them,” he stressed.   Sen. Umahi then observed that “the cost of non-completion of this project has a lot to do with contractors. Where contractors stay on projects over and over and be pretending, thereafter, they come to request for augmentation every year refusing to leave the site.”   He however assured that “we will force them out of site either on the terms of completion or on the terms of termination.This is what we are going to do.” Stressing the imperative for the Ministry to deliver quality and good highways to Nigerians, the Honourable Minister averred that “it is very important to appreciate all the efforts of Mr. President who has been providing funds for our road infrastructure projects; which is very, very good.”   Sen. Umahi added that despite over 3,000 road projects inherited by this administration, President Tinubu must be commended for providing huge resources for our road network stating, “so it's kudos to Mr. President and it shows that Mr. President is very, very sensitive to our road infrastructure needs. And so we must do everything to support the Renewed Hope Agenda of Mr. President, irrespective or notwithstanding any blackmail,” he declared.   Meanwhile, the Honourable Minister has lauded Arab Contractors, the contractor carrying out the ongoing rehabilitation of work on the 56km Abia State section of the Enugu -Port Harcourt highway for quality of work done with words of encouragement.   He said “the moment a contractor is performing very well, then you are a friend and that's the bottom line,” he submitted.   In the same vein, the Honourable Minister has described as excellent the job performance of Messrs CGC Nig. Ltd handling Enugu State axis of the dual carriage after his inspection of the roads.   While commending the contractor, consultant and the Controller of Works for job quality, Sen. Umahi praised the contractor for the quality of work and equipment, while requesting that  the ongoing work on one section of the highway must be completed by middle of March as agreed. ...

Feb
17
2024

President Tinubu Directs Works Minister to Interface with Cement Manufacturers Over Increase in Price   .....Umahi re-inspects Contractor’s work on East-West Road.   President Bola Tinubu has directed an immediate interface with major cement manufacturers in the country over rising price of cement, says the Honourable Minister of Works, Sen. Engr. David Umahi, CON.   Speaking to journalists Saturday after the latest round of inspection section 3 of the ongoing rehabilitation of East-West highway, the Honourable Minister disclosed that President was seriously concerned with current situation of increase in cement prices.   Sen. Umahi observed about the current price of cement that “some are still selling sometimes, you know, 10,000 naira sometimes 12,000 naira; and so, on and so forth.” He added that “So it's not healthy for us. So, Mr. President has directed that we should interface with them, look at their problems, and then see who is, you know, ripping off Nigerians and see how we can help them, the transporters and then the manufacturers.”   “And that's what we're going to do on Monday,” in the meeting with Dangote Plc, BUA Plc, Lafarge Plc and others.   While commending the level of work on the East-West highway, he informed that “our job as a ministry is to encourage the contractor to do a good job according to design and according to the expectation of Nigerians.”   Continuing, he noted the impact of new engineers deployed by the Contractor, “he is a very well qualified, registered engineer. And we have met on other projects and technically he is very good. So, I am very happy for that.”   On the need to expedite work on the project, the Honourable Minister said “there is an increase in the number of sections that we are working on, because of how urgent this job is, we should have more sections. They have opened about five sections. We should have almost all the sections being worked upon.”   Commenting on the percentage of work done by the Contractor, the Honourable Minister said “well, we can't talk in terms of percentage. If we get all the quality jobs like this, then I'll go to sleep, because this is the major.”   According to him, “the foundation of every structure is more important than the structure itself. So, we are more interested in getting this done.   “When this is done, to lay the concrete, it's not going to be difficult at all. But this is the most difficult.”   He assured that the coming of rains should not be a stumbling block to the progress work, noting that a different design would be deployed, “and that's what we are doing in a lot of our interventions on the East-West Road.”   Sen. Umahi used the opportunity to reiterate that the tax credit scheme is still continuing saying “it is very obvious, and we've said it, you know, that the President never stopped any of the project, not NNPCL tax credits. He never.”   “In fact, he has also, based on the first module, given approval that we can review the projects,” he stressed.   The Honourable Minister however emphasized that “we are bound to review it. And we've started reviewing it. And we've reviewed this one. Fortunately for us, the contract of this one has not increased, even though we have redesigned it”.   Earlier, the Honourable Minister, Sen. Umahi attended Senator Barinada Mpigi’s thanksgiving service held in his hometown, Okoroma in Tai Local Government Area of Rivers State. Senator Mpigi represents South-East senatorial zone of Rivers State in the Senate. ...

Feb
16
2024

Implementation of Road Infrastructure Development and Refurbishment Investment Tax Credit (Tax Credit) Scheme on Course The Honourable Minister of Works, His Excellency Sen Engr Nweze David Umahi CON has restated the commitment of the Federal Government in the implementation of the Road Infrastructure Development and Refurbishment Investment Tax Credit (Tax Credit) Scheme. The Honourable Minister made this clarification   in a Press briefing after a meeting he had with the Chairman, Federal Inland Revenue, (FIRS) Mr. Zacch Adedeji, FCA and the Group Chief Executive Officer of Nigeria National Petroleum Company Limited, NNPCL, represented by the Chief Financial Officer, Umar Isa Ajiya in his office on 16th February 2024.   Speaking to Press men, the Hon. Minister said that the President of the Federal Republic of Nigeria, His Excellency, President Asiwaju Bola Ahmed Tinubu GCFR has not only said that the implementation of the Tax Credit Scheme should continue, including private, NNPC and NLNG, but has also approved the review of the projects under the Scheme due to inflation. The Minister said that the statement of the Chairman of FIRS that the project would be completed but would not be expanded was misconstrued by some media quarters as saying that the projects under the Scheme would be stopped.  He further reiterated that the Scheme is highly beneficial and that the implementation framework is encapsulated in the Executive  Order No. 007 of 2019 of the Federal Government of Nigeria.   Part of their agreement was that " all the NNPC projects on road infrastructure as started, should not be expanded, but should continue to the tune of N2.59 trillion. It was also agreed at the beginning of this Executive Order, and it was very clear that the N2.59 trillion was not the total cost of the project. Sometimes it's about 40% funding, sometimes it's about 50% funding. So, ab initio, the cost of the project up to completion was not N2.59 trillion. Now, we have scoped the entire project and then put a review on it, and the funding gap is N2.7 trillion."   "We agreed that three of us would make a joint memo to Mr. President to suggest that the N2.7 trillion funding gap be channeled to the National Assembly for approval and then the method upon which we get the money."   While thanking the Chairman of FIRS and the GCEO NNPCL for their commitment to the Scheme, he noted some of the challenges they discussed such as the problem of methodology for programme implementation and their resolve to adopt a more robust approach to solve the problem. He also said that part of their resolution was that non-performing contracts shall be terminated.    He said "contractors should go back to site and  we are going to unequivocally terminate contracts that are not performing in the coming weeks and this we  will do definitely and we are going to encourage even the local contractors especially those who can do concrete roads to come forward and register and we patronize them".   While commending  FIRS for the funding,  he further expressed, " We are happy that this NNPCL project will be completed, we have agreed  on the private Tax Credit and he has also given a blessing  that it should not be expanded  beyond  the  last seven projects that were initiated by the last administration and that we should go ahead to review  the likes of  Dangote,  BUA, MTN and then close it." ...

First First First

LIVE ACTIVITY FEED

PUBLIC ANNOUNCEMENT


Nov
03
2025

  


OTHER NEWS

Oct
16
2020

Quality Engineering Education Ensures Delivery of World Class Infrastructure – Engr Aliyu

Minister of State for Works and Housing, Engr Abubakar Aliyu has stated that focus on quality engineering education will ensure the delivery of world class infrastructure in order to better the lives of citizens

The Minister was speaking as a Special Guest of Honour at the 18th International Conference and Annual General Meeting, (AGM) , of the Nigerian Institution of Civil Engineers (NICE), which was held in Abuja, with the theme “ Reform of Engineering Education: A Strategy for Sustainable Development in Nigeria.

In his reaction to the theme of the Conference, he said “… it is only fair that we focus on quality engineering education in order to ensure the delivery of world class infrastructure to better the lives of our citizens”

Engr. Aliyu also explained that, it is only through a better adoption and adaption of Engineering that we can share in the good life that it offers in other climes, and this he said can solely be achieved through quality Engineering education

Accordingly, the Minister noted that Sub-Saharan Africa seriously lacks engineering capacity and relies heavily on imported expertise, which he said was attributable to insufficient output from training institutions, poor- quality education, and lack of practical experience among graduates.

He said that according to UNESCO landmark report on Issues, Challenges, and Development Opportunities, Nigeria produces 3,500 engineers a year, a modest number relative to its population, but suffers significant unemployment among them because of the lack of the requisite training.

However, the Minister assured the delegates that the administration of President Muhammadu Buhari, in line with its change mantra, is committed to development of the engineering profession considering its critical role in bringing about sustained economic growth.

He added that this administration has heavily invested on Research and Development generally and particularly on engineering education, however only modest achievement was made due to challenges that are huge but not insurmountable.

He also pointed out that synergy and harmonization of programmes, cooperation and collaboration can link Nigerian engineers’ consultancy services to global practices and marketing frameworks

Earlier, in a welcome address, the National Chairman of the Nigerian Institution of Civil Engineers (NICE), Engineer, Mrs Aishatu Aliyu Umar stated that the annual Conference which is the second in her tenure is exceptional to Civil engineers who gathered from different sectors of the economy to deliberate on the sustainable ways to enhance the profession.

She added that the conference is also an opportunity for the engineers to individually analyse their performance, asses impact and restrategise on ways to practice the profession for sustainable development of the nation

Engineer Umar described the 2020 theme as well thought out considering the fact that the World is being reshaped for better technological advancement and Nigeria cannot continue to be left behind.

While delivering an opening address, the President of the Nigerian Society of Engineers, (NSE), who was also the Chairman of the occasion, Engineer Babagana Muhammed described the annual conference and AGM as a gathering of professional engineers for the advancement of engineering practice in Nigeria in line with the global best practice.

Engineer Muhammed urged engineers to talk to stakeholders in their respective states on the water bill so as to give it the necessary support that will be in the interest of the people. He charged Nigerians who have the wherewithal to give back to society especially those that enjoyed free education.

Among the dignitaries that graced the occasion were: Engineer Umaru Bago Tafida, the Emir of Lapai and Royal Father of the day, Engineer Alimasuya  Rabiu, President of COREN, Michael Jiang Yigao, Chairman/MD CCECC, Engineer Chris Okoye, Chairman/Principal Consultant CCGE Ltd

Speeches

Feb
12
2018

Speech by the Honourable Minister Mr. Babatunde Raji Fashola san during the Commissionning of 100MVA, 132/33kv Transformer at Katampe Substation on February 12, 2018

Protocol

Transmission Company of Nigeria (TCN) is responsible for conveying electricity from the Generation Companies (GenCos) who produce at power stations in various locations to over seven hundred trading points where the Distribution Companies (DisCos) receive it and distribute it to consumers nationwide. The GenCos can now produce 7,000 MW, with more capacity coming. This Administration’s focus on delivering Incremental Power requires that TCN build and maintain the capacity and operational flexibility to transmit more than the GenCos can produce, to ensure stable and reliable power delivery to the DisCos and other customers connected directly to the National Grid.

As part of the program, another milestone has been achieved here in the capital city of Abuja with the installation of additional 1x100MVA Transformer at Katampe and another of the same capacity at Apo. The capacity of the Katampe 132/33kV substation, prior to this installation, was 120MVA. Therefore, with this installation, the capacity has been raised to 220MVA. Similarly, the Apo 132/33kV substation has been raised from 190MVA to 290MWA.

The two transformer projects, executed by Messrs. MBH Power Limited, are part of the Nigeria Electricity and Gas Improvement Projects (NEGIP) financed by the World Bank.

With the commissioning of the two 100MVA, 132/33kV Transformers, the communities listed below are expected to experience remarkable improvement in power supply. Gwarinpa, Life Camp, Jabi, Kado, Wuye, Maitama, Mpape, Katempe 1 and II, Jahi, Mabushi Garki, Gudu, Guzape, Asokoro, Apo Resettlement, Wumba, Apo Mechanic Village and part of Lugbe and Nnamdi Azikwe International Airport all located within the FCT Abuja.

With this development, TCN has not only established adequate Transformer capacity to serve these parts of Abuja but has also provided the necessary redundancy in line with the requirements of N-1 reliability criterion at both Katampe and Apo substations.

The installation of the two 100MVA, each at Apo and Katampe will also increase the total wheeling capacity of TCN, which was last simulated in the December 2017 to slightly above 7,000MW.

TCN also has advertised for upgrading the capacity of Central Area 132/33kV Substation. This project is part of the Nigerian Electricity Transmission Project (NETAP) financed by the World Bank as a successor to NEGIP.

TCN is also implementing the Abuja Transmission Scheme (ATS) financed by Agence Francaise De Development (AFD). The procurement process for the projects under the scheme has reached an advanced stage.

Five new Substations and a the third 330kV transmission line into Abuja in addition to Shiroro-Abuja and Ajaokuta-Abuja 330kV transmission line will be constructed as part of ATS. Two of the new Stations 330/132/33kV Substations under ATS will be sited at the West Main (Lugbe) and New Apo, while the three new 132/33kV substations will be sited at Lokogoma, Kuje and Gwarinpa. They are expected to cater for the transmission needs of Abuja in a long while.

I wish to thank the Honourable Minister of FCT for the cooperation he accorded TCN, which made this commissioning possible. TCN and the Ministry will continue to rely on the support and cooperation of the Honourable Minister of FCT, as we strive to meet the electricity requirements of Abuja, which is gradually transforming into a mega city. There is need to plan for the future expansion of Power Transmission and Distribution Infrastructure in the city.

Let me use this occasion to recognize the important collaboration that exists between FGN and Government of Japan under which Capacitor Banks worth over $10 million are being installed at Apo and Keffi substations. The Capacitor Bank in Apo, rated 22.5MVar is currently 80% completed. It will significantly improve the quality of power supply from Apo substation. The same collaboration is expected to also completely rehabilitate Apapa, Akangba, Isolo and Ikeja West Substations in Lagos.

In conclusion, on behalf of my colleague-Ministers and indeed the entire staff of the Ministry of Power, Works and housing, I congratulate TCN for successfully installing the 1X100MVA Transformer at Katampe and for the installation of another at Apo substation. The Ministry will continue to support its agencies, including TCN, to deliver Incremental Power to Nigerians.
Thank you.

Mr. Babatunde Raji Fashola SAN
Honourable Minister of Power, Works and Housing

PHOTO NEWS

Jun
02
2025

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

Click To View More Pictures

PHOTO NEWS

Apr
28
2025

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

Click To View More Pictures