Federal Ministry of Works (FMW)
... building the backbone for Development ...
Follow Us:
Welcome To Federal Ministry Of Works.
Minister Federal Ministry Of Works Engr. David Umahi.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Feb
13
2026

LATEST PRESS


WORKS MINISTRY DID NOT AWARD ABUJA–KADUNA ROAD CONTRACT TO MIKANO – UMAHI CLARIFIES

The Honourable Minister of Works, Engr. Sen. David Nweze Umahi, CON, FNSE, FNATE, has clarified that the Federal Ministry of Works did not award the Abuja–Kaduna Road contract to Mikano International Limited. The Minister stated that the contract was awarded to Infiouest International Limited, in line with due procurement processes and transparency standards.

The Minister made this clarification while briefing journalist on 12 Febuary, 2026 in the Ministry Confrence Room in Mabushi Abuja, also drawing public attention to the increasing rate of vandalisation of critical road infrastructure across the country. He noted that the Ministry has a responsibility to provide accurate information to the public and to protect national infrastructure from destruction.

Engr. Umahi expressed serious concern over widespread vandalism affecting roads, bridges, and related infrastructure nationwide. He cited recent cases along the Lagos Coastal Road corridor, where protective structures and road components have been deliberately damaged.

According to the Minister, flooding recorded in some sections of the coastal highway was largely caused by blockage of underground drainage channels with refuse, emphasizing the need for public cooperation in maintaining infrastructure.

He commended the Lagos State Government, security agencies, and the Nigeria Police for deploying personnel to safeguard critical infrastructure and combat vandalism.

Parking of heavy trucks on bridges creates structural stress, as bridges are not designed for static heavy loads. He disclosed that some offenders have already been arrested and are being prosecuted.

The Minister highlighted the Federal Government’s adoption of reinforced concrete road technology, which is expected to last between 50 and 100 years, compared to traditional asphalt roads. He commended President Bola Ahmed Tinubu GCFR, for supporting long-term infrastructure development and for approving several strategic road projects nationwide.

The Minister announced the
Extension of the Bodo–Bonny Road by 8.7km to link the East–West Road, using concrete pavement technology.

He added that Progress on major legacy road corridors including routes connecting Akwanga – Jos – Bauchi – Gombe – Maiduguri.
Expansion of CCTV surveillance on major bridges and highways to curb vandalism and enhance monitoring.
The Minister emphasized that federal road projects are distributed based on national development priorities, not regional considerations. He called on Nigerians to support national unity and protect public assets.

The Federal Government is considering stronger policies and collaboration with private sector partners and state governments to improve road maintenance and enforce compliance against illegal road obstructions and structures.

Addressing the status of NNPCL-funded road projects initiated under Executive Order 007 (April–May 2023), the Minister clarified that the Nigerian National Petroleum Company Limited (NNPCL) will no longer directly pay contractors for these projects. He announced that the Federal Ministry of Works has officially taken over both project supervision and payment responsibilities, in line with new federal directives.
The Honorable Minister disclosed that ₦127 billion has been released by Mr. President for the continuation of these projects, underscoring the administration’s commitment to completing inherited infrastructure initiatives. He noted that an estimated ₦7 trillion will be required to complete all NNPCL-funded projects, describing them as critical to national connectivity and economic development.

Sen. Umahi further revealed that the Federal Government inherited 6,604 ongoing federal road and bridge projects nationwide, with a projected ₦16.9 trillion required for their completion. He reiterated that President Bola Ahmed Tinubu has directed that all inherited projects must be completed, stressing that infrastructure development remains a top priority of the administration.

The Honourable Minister reaffirmed the Ministry’s commitment to transparency, efficiency, and accountability in the execution of these projects, assuring Nigerians that the government is determined to deliver quality infrastructure that meets international standards.

The Permanent Secretary, Federal Ministry of Works, Mr. Rafiu Adeladan, In his closing remarks, thanked members of the press for their continued partnership and commitment to national development.
He reiterated the Ministry’s commitment to transparency and urged the public and media to verify facts and provide constructive feedback to support improved service delivery.


 

Dec
06
2025

REJOINDER: PAYMENT OF ALL CONTRACTORS BY 20TH DECEMBER, 2025 The attention of the Federal Ministry of Works has been drawn to a distortion of information in the media, especially Channels Television, where it was alluded that the Minister of Works, Sen. (Engr.) David Umahi, CON, FNSE, FNATE said that all local contractors will be paid by 20th December, 2025. Let it be on record that the Minister of Works does not speak for the Minister of Finance and Coordinating Minister for the Economy, Mr. Wale Edun, who is in charge of all payments to contractors handling Federal Government projects. However, the true position of facts is that the Minister of Works on Thursday, 4th December, 2025, while inspecting ongoing works on the three (3) Sections of the Mararraba-Keffi Expressway, which are some of the NNPC Tax Credit projects taken over by the Ministry in terms of funding, commended the contractors for the excellent work and assured them that after verification by the Independent Corruption and other Related Practices Commission (ICPC), the Ministry, through the Ministry of Finance, will commence the payment of all generated certificates before the 20th of December, 2025. He also appealed to Contractors handling such projects not to stop work in any part of the country. Inasmuch as the Federal Government is making concerted efforts to pay most of the verified inherited debts, the Federal Ministry of Works is not in a position to set a deadline for payment nor to speak on behalf of the Minister of Finance and Coordinating Minister for the Economy. The media is hereby invited to correct such misinformation. Mohammed A. Ahmed, Director, Press and Public Relations. 6th December, 2025. ...

Nov
09
2025

FG Decries Road Vandalism, Reaffirms Commitment to Record Completion of Abuja-Kano Expressway The Federal Government has expressed deep concern over the rising cases of vandalism and misuse of newly constructed and ongoing road projects across the country, warning that such irresponsible acts threaten the lifespan and safety of critical national infrastructure. Minister of State for Works, Hon. Bello Muhammad Goronyo, Esq., issued the warning on Saturday, 8th November 2025, during a holistic inspection visit to the Outstanding Sections of the Abuja–Kaduna–Zaria–Kano Expressway project, where he condemned the destructive activities of some hoodlums along the completed and active sections of the road. The Minister, in particular, decried instances of individuals removing safety railings, damaging concrete pavements, or converting portions of the highway into refuse dumps and drying grounds—especially around the Jaji Bridge corridor in Kaduna State. “Maintenance begins with discipline and public responsibility,” Goronyo stated. “We have observed people cutting through newly completed road sections or tampering with vital components. These acts of vandalism must stop immediately,” he warned. In this vein, he urged traditional rulers, community leaders, and residents to take collective ownership of public infrastructure and ensure that such national assets are protected from misuse, adding that the government’s huge investments in road development must be safeguarded for future generations. “The Renewed Hope Administration of His Excellency, Asiwaju Bola Ahmed Tinubu is committing enormous resources to the building of durable roads across the country. Every act of vandalism or road abuse undermines national progress and the deployment of taxpayers’ money to other critical national priorities,” the Minister emphasised. Reaffirming the government’s resolve to complete the Abuja–Kaduna–Zaria–Kano Expressway within record time, Goronyo described the project as a flagship of President Tinubu’s Renewed Hope Agenda, designed to enhance trade, promote unity, and strengthen economic integration between the Northern and Southern regions of the country. He disclosed that the Section I (Abuja-Kaduna) of the project, spanning 144 kilometres, is progressing steadily across several active sections - from Tungan Maje and Jere to Katari, Kakau, Gonigora, and Agogo Junction—with significant work already completed in drainage, reinforcement, and the construction of the shoulders. “So far, about 26 kilometres of continuous rigid concrete pavement and 15 kilometres of binder and wearing course have been completed,” the Minister revealed. “The President has made it clear that funding will not be a constraint. It is now a matter of work and getting paid,” he informed the contractor, Messrs. Infiouest International Limited. In line with the President’s directive for durable infrastructure, the Acting Director, Highways, Bridges and Design at the Ministry, Engr. Musa Sa’idu explained that the project design was upgraded from flexible (asphalt) to rigid (concrete) pavement, capable of lasting for about a century and withstanding the stress of heavy-duty and overloaded vehicles. He further disclosed that a recycling approach is being used to strengthen the substructure, by mixing milled asphalt with stone base and cement to improve durability and minimize environmental impact. Mr. Robert Turner, Senior Project Manager of the company, reaffirmed their commitment to engineering excellence and set a target, adding that work is progressing seven days a week, with plans to introduce night shifts to accelerate completion. “We are determined to deliver this project ahead of schedule. The government has demonstrated exceptional consistency in funding, and we are matching that commitment with performance,” Turner assured. Concluding the inspection tour at the additional location of the Kano end of the alignment, the Minister reiterated that the Abuja–Kano Expressway remains one of the most strategic road corridors in the nation, symbolising Mr. President’s unwavering commitment to infrastructural renewal, national security, and economic prosperity. “This project is dear to the President’s heart. It is not just a road - it is a lifeline for trade, social and political integration, as well as national unity. Every Nigerian must play a part in protecting it,” Goronyo declared. Earlier at the end of Section II (Kaduna-Zaria), which has been completed and handed over by the previous contractor, the  Minister detoured to inspect another ongoing construction work on the Unguwar Iliya-Bagudu-Kwantakaran-Tsiga-Bakori Road with Kadabo Bridge in Kafur Local Government Area of Katsina State. He expressed satisfaction with the progress of work, which has an approximate length of 17.3 kilometres, starting from Tsiga Town and passing through the Barde community. The scope of work includes the construction of a single carriageway and three reinforced concrete bridges. Briefing the Minister on the Project, the Federal   Controller/Engineers’ Representative, Engr. Muhammad I. Matinja and the Project Manager for Messrs. Halis Matrix Limited, Engr. David Omotosho expressed optimism about the progress of work, assuring that it will be completed on time and according to its design. **Mohammed A Ahmed, ** Director Press and Public Relations.  9th November 2025. ...

Nov
07
2025

OYEBANJI DECLARES OPEN 30TH NATIONAL COUNCIL ON WORKS   - MINISTER COMMENDS PRESIDENT TINUBU AND EKITI GOVERNOR FOR INFRASTRUCTURE STRIDES  The 30th Meeting of the National Council on Works (NCW) officially commenced in Ado-Ekiti, Ekiti State, with Governor Biodun Abayomi Oyebanji declaring the event open on Thursday, 4th November 2025. The Council, which drew participation from Honourable Commissioners of Works and Permanent Secretaries from the 36 States of the Federation, focused on advancing transparency, innovation, and sustainable infrastructure delivery across Nigeria. In his address, Governor Oyebanji expressed satisfaction with the remarkable progress recorded by his administration in road construction and rehabilitation, describing it as a “road revolution” that has opened up communities, enhanced connectivity, and improved access to markets, schools, and healthcare facilities. He reaffirmed Ekiti State’s commitment to infrastructural excellence and inclusive development, noting that hosting the NCW was a recognition of the State’s growing reputation for innovation and good governance. “Since inception, our administration has made deliberate efforts to invest in infrastructure as a key driver of economic growth and social development,” he stated. “We appreciate President Bola Ahmed Tinubu for his interventions on Federal roads in our State, which we have complemented through the repair of the Ado–Iworoko–Ifaki dual carriageway,” he added. The Minister of Works, Engr. David Umahi, CON, FNSE, FANTE, represented by the Minister of State, Mohammed Bello Goronyo, Esq., commended both President Tinubu and Governor Oyebanji for their shared commitment to infrastructure renewal. He described their collaboration as a reflection of the Renewed Hope Agenda’s success in fostering synergy between the Federal and State Governments for sustainable national development. The Minister expressed profound appreciation to the Government and the good people of Ekiti State for graciously hosting the 30th Council. He commended the Governor for providing an enabling environment for collaboration and dialogue, describing Ekiti as a hub of responsible governance and infrastructural innovation. He also acknowledged the unwavering commitment of President Bola Ahmed Tinubu, GCFR, to infrastructure renewal under the Renewed Hope Agenda, which has empowered the Ministry to deliver transformative projects that enhance connectivity, stimulate economic growth, and restore public confidence. He particularly applauded Governor Oyebanji for the successful completion of the Ekiti Agro-Allied International Airport, describing it as a landmark project that has repositioned the State for economic growth and investment. Reflecting on the Council’s theme, “Discipline, Transparency and Innovation in Engineering Practice,” the Minister emphasised the need for a renewed mindset in public service and infrastructure delivery. He stressed that discipline builds trust, transparency ensures accountability, and innovation drives sustainability in modern engineering. He further revealed that the Ministry is adopting advanced technologies, including digital project monitoring, geotechnical mapping, drone-assisted planning, and the use of climate-resilient materials, to meet Nigeria’s evolving infrastructure needs. “Infrastructure is more than concrete and steel or asphalt, it is the backbone of our economy and a bridge to opportunities. “Through discipline, transparency, and innovation, we will deliver roads that reflect our people’s aspirations,” he promised. The Council, chaired by the Minister of State reviewed 67 memoranda, out of which 62 were adopted. These memoranda had undergone robust deliberations during the three-day Technical Sessions preceding the main event, which included Meetings of Directors and other Stakeholders, as well as those of the Permanent Secretaries. The meetings underscored enhanced policy coordination, institutional strengthening, innovation-driven engineering, and transparency in project delivery. Among key resolutions reached were: * Adoption of a National Monitoring, Evaluation and Control (MEC) Framework to ensure value-for-money and accountability. * Directive for Ministries, Departments, and Agencies (MDAs) to publish project details and progress updates on official websites for transparency. * Approval for the constitution of a National Road Infrastructure Coordination Committee (NRICC) to harmonize efforts across agencies and prevent duplication of contracts. * Recommendation for increased adoption of Public-Private Partnership (PPP) models in road and bridge infrastructure. * Endorsement of the use of solar street lighting and climate-resilient construction materials in line with national sustainability goals. * Call for inter-ministerial collaboration between the Federal Ministries of Works, Transportation, and that of Innovation, Science, and Technology to drive digital innovation and smart transport systems and  * Support for FERMA’s Direct Labour Unit to strengthen rapid road maintenance response nationwide. In a Vote of Thanks, the Permanent Secretary, Federal Ministry of Works, Engr. Olufunsho Adebiyi, FNSE expressed profound appreciation to the Governor for hosting the high-level meetings. He also expressed gratitude to the Minister of Works and the Minister of State for making the NCW a reality. He also commended the latter for his exceptional dedication in presiding over the final session and lauded the Commissioners of Works and Infrastructure Development, their Permanent Secretaries, and all Stakeholders for the constructive engagements and teamwork exhibited throughout the week-long event. The 30th National Council on Works concluded with stakeholders reaffirming their commitment to promoting transparency, fostering innovation, and strengthening discipline in the delivery of sustainable infrastructure across Nigeria. “The NCW has come up with far-reaching resolutions that will reposition the road sector for greater efficiency and accountability,” he concluded. The Council announced that the 31st National Council on Works will be hosted by Sokoto State in 2026, subject to confirmation.  Mohammed A. Ahmed  Director, Press and Public Relations. 7th November 2025. ...

First First First

LIVE ACTIVITY FEED

PUBLIC ANNOUNCEMENT


Nov
03
2025

  


OTHER NEWS

Dec
09
2023

Minister and Directors Meet in Preparation for Budget Defence with the Joint Committees of National Assembly

 

The Directors of the Federal Ministry of Works have risen from their in-house budget defence with the Honourable Minister in preparation for budget defence with the Joint Committees of National Assembly slated for 11th December 2023.

 

The Honorable Minister thanked the Acting Permanent Secretary and all the Heads of Departments who handled the Ministry's budget for their commitment to the appraisal of the 2023 budget and the preparation of the 2024 budget proposal.

 

The Minister noted that the road sector needed a different kind of attention beyond the 2024 budget envelope received by the Ministry.  For a developing nation like Nigeria, road sector development is a catalyst for economic development.  The road sector has the potential to improve the security sector, agricultural sector, trade and investment, health, education, and, in fact, every aspect of the development of every nation.

 

The Minister thanked very highly the President of the Federal Republic of Nigeria, His Excellency, Senator Asiwaju Bola Ahmed Tinubu, GCFR for the attention given to the Ministry and his approval of concrete pavement  in most of the 2024 projects. He stated that the Ministry is committed to the development of road infrastructure in line with the Renewed Hope agenda of Mr. President. The Minister noted the huge debts arising from unpaid certificates inherited from the past administration, which runs up to N1.5 trillion up till date and the expected contract reviews arising from inflation.

 

These two factors are recognized in the Ministry as issues that must be confronted in order to move forward.

 

The Minister has, therefore, set up six committees of one committee per geopolitical zone to review all debts of unpaid certified certificates generated before May 29th, 2023, and from May 29th 2023 to date. The committees will also review the approved and unapproved variation of prices and all augmentations that were approved or are yet to be approved and make recommendations to the Ministry's management. The Ministry has exposed these debts and all reviews in the Ministry to Mr. President’s economic team and also to the Federal Executive Committee on road sector funding. It is believed that the internal works through these constituted committees will help them to use external Consultants to reverify the works so that concrete decisions will be made to move the Ministry forward.

 

Contractors who are being owed are requested to approach these committees with all documents to back up their claims from Tuesday 12th 2023 to Friday, 22nd of December 2023 from 9 am to 7 pm at the Honourable Minister’s Conference Room, 1st floor, Federal Ministry of Works,  Headquarters, Mabushi Abuja.

 

The Minister again thanked Mr. President very highly as well as National Assembly and pledged their commitment in using judiciously whatever fund allocated to the Ministry and such funds must impact on the road infrastructure  improvement.

 

The entire Directors of the Ministry pledged for a renewed vigor in the supervision of the projects, and the results are already evident.

SPEECHES

May
25
2023

Remarks By H.E Babatunde Raji Fashola, SAN At the Virtual Commissioning of Three Bridges, Three Secretariats and One Road on Tuesday 23rd May 2023

Mr. President, Distinguished Ladies and Gentlemen:

On behalf of the Honourable Minister of State, Ibrahim Umar El-Yakub, and other Ministers of States who have served with me, the Permanent Secretary and former Permanent Secretaries, Directors serving and retired and all the staff of the Ministry of Works and Housing, I am pleased to welcome you all to this momentous day.

A day where the Federal Government of Nigeria, working with the State Governors, Senators and House of Representative members, Traditional Rulers and with the people of Nigeria, unveils 3 (THREE) major bridges the Loko-Oweto, Second Niger and Ikom bridges, a completed Section of over 200 kilometres of Kano-Kaduna Highway and three new Federal Secretariats.

Today, Mr. President will connect Benue to Nasarawa on the Loko – Oweto Bridge, Cross River to Benue on Ikom Bridge and Anambra to Delta on the Second Niger Bridge, and literally connect many parts of Nigeria to themselves.

In the same vein, we link Kano to Kaduna on the Kaduna-Kano highway and impact Zamfara, Bayelsa and Anambra directly through the Secretariats.

This is a story of development and a story of people, all of which cannot be fully told here.

But I will try; starting from the President and the Commander-in-Chief whose leadership, support and opportunity afforded us to serve has made all these possible.

The story of the cabinet members from the Vice-President and my colleague ministers whose support for the various memoranda in Council made these projects possible.

Some of those memoranda you spent hours to debate and approve have yielded some fruit.

Our legislators in both chambers of Parliament were part of the story. They appropriated, they approved where necessary and oversighted all through the project; but they never obstructed.

The State Governors, their Commissioners and their Traditional Rulers are a story that must be told, about how Federal, State Government and Traditional Institutions can, and must work together to deliver development and prosperity.

The story of the men and women who worked on these construction sites is an unforgettable one.

Not only were these sites places of employment for them to earn a living to support their families; I saw in them men and women, boys and girls involved in the dignifying and patriotic work of nation building.

The story of the economic activity that took place at these sites is also most compelling.

Thousands of tonnes of construction materials, sand, cement, diesel, reinforcement, bitumen, aggregates were bought, sold and transported over the period.

This was a period of boom for small and family-owned businesses who supplied the contractors.

It is the clearest narrative about how infrastructure benefits the people and how this drives the services sector of the economy that employs the most people.

It is the story of how the Muhammadu Buhari policies meet the people at their point of need even if many of these people will never meet Muhammadu Buhari in person.

Another story to tell is that prosperity is already being delivered by these projects.

Travel time is reduced by more than 50% in many of the places we surveyed.

Property values of landowners have appreciated by up to 30% in the surveys conducted on land values where we have delivered infrastructure.

These are some of the attempts by Government to pushback against multi-dimensional poverty; because Loko-Oweto reduces travel time to Abuja by 4 (FOUR) hours and with the Second Niger Bridge it will take a few minutes, instead of hours to cross the River Niger, a crossing of approximately 1.5 Kilometres.

The Calabar port now has a story of improved patronage to tell, and efficient import and export business can only help in the push back against poverty.

With regards to the Presidential Infrastructure Development Fund, I want to tell the story of a successful working relationship with the Nigeria Sovereign Investment Authority (NSIA) under the previous Managing Director, Uche Orji, and the present one, Aminu Umar-Sadiq and the management team.

They were worthy custodians and managers of the Presidential Infrastructure Development Fund.

I cannot forget the story of my working relationship with your Excellency’s office through your Chiefs-of-Staff, the late Abba Kyari of blessed memory and the amiable Professor Ibrahim Gambari.

With their collaboration, the Attorney-General and the Minister of Finance, we delivered the Second Niger bridge, 200 kilometres out of the 365 kilometres of the Kano-Abuja highway and 114 kilometres of the 127 kilometres Lagos-Ibadan highway.

Mr. President it is now my pleasure to invite you Sir to dedicate and hand over the following projects for public use:

a.  Zamfara Federal Secretariat, Gusau
b.  Bayelsa Federal Secretariat, Yenagoa
c.  Anambra Federal Secretariat, Awka
d.  The Ikom Bridge, Cross River
e.  Loko-Oweto Bridge (Nasarawa/Benue)
f.    Muhammadu Buhari 2nd Niger Bridge (Anambra/Delta)
g.  Two hundred kilometres of Kano-Kaduna dual carriageway.

PHOTO NEWS

Jun
02
2025

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

Click To View More Pictures

PHOTO NEWS

Apr
28
2025

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

Click To View More Pictures