UMAHI SHOWCASES FEDERAL PROJECTS IN EBONYI, SAYS SOUTHEAST IS GRATEFUL TO TINUBU AS EBONYI SET TO DEMONSTRATE ITS APPRECIATION TO THE PRESIDENT ON MONDAY The Honourable Minister of Works, Senator Engr. David Umahi, CON, on Saturday, June 13, 2026 led a Federal Government delegation headed by Presidential Adviser on Information and Strategy, Mr. Bayo Onanuga, on an inspection of ongoing federal road projects across Ebonyi State, using the occasion to highlight what he described as the unprecedented infrastructure transformation taking place under the administration of President Bola Ahmed Tinubu. Speaking during the inspection, Umahi showcased several strategic federal projects across the state and the Southeast, explaining that the region remains deeply grateful to President Tinubu for the tangible evidence of inclusion, fairness and development. At the Calabar - Abuja project sites, the Minister explained the strategic importance of a major flyover under construction along the Trans-Sahara Super Highway corridor. “Let me say that this is the point where the Trans-Sahara Route takes a bend. The essence of this flyover is to resolve the conflict at this point,” he said. According to him, the Federal Government has already made provision in the 2026 budget to connect the corridor directly to the Ebonyi State capital. “The road going to the capital city, which is 18km from this point, is included in the 2026 budget, and the Federal Government will undertake the connection to the city centre.” Umahi stressed that despite funding challenges, work would continue uninterrupted across project sites. “Of course, the contractor has not been paid, but we are creditworthy. All contractors being owed will be paid. There should be no stoppage of work because we want to see if we can commission this project by December. The cost is ₦25 billion.” The Minister described the projects as only a glimpse of what President Tinubu is delivering in the Southeast. “This is just the beginning. You will see remarkable projects of President Bola Ahmed Tinubu in the South-East. When we talk about the gains of the South-East under President Bola Ahmed Tinubu, some people who do not understand what we are talking about will continue to criticize us.” He declared that the people of the Southeast have taken notice of the President’s interventions and are prepared to openly express their appreciation. “The people of the South-East are very appreciative of what the President is doing. By Monday, under the leadership of the Governor of Ebonyi State, we will demonstrate this appreciation when we adopt the President as our sole candidate and, of course, the Governor.” Umahi was emphatic about the region’s political direction. “Let it be known that Ebonyi State is not obedient because we want to catch up with the rest of the country, and we will never be obedient. What happened before was an accident of history. It will not repeat itself.” The Minister also provided updates on the flagship Trans-Sahara Super Highway, revealing that a ₦668 billion contract has already been awarded and construction is progressing steadily despite the rainy season. “The project is about 28% completed. We are not stopping because of the rains. Work continues, especially with President Bola Tinubu’s concrete road technology.” Tracing the history of the corridor, Umahi said the project was originally conceived during the colonial era but remained unrealized for decades. “We presented the concept to the President, a man divinely called to do the impossible. What was once a colonial dream is now being realized more than sixty years later.” He described the highway as a critical economic route that will connect Nigeria to neighbouring countries while unlocking agricultural and industrial opportunities across the country. “The President is fulfilling that vision, and I am very happy because this is a major trade corridor. It connects us to Cameroon and serves as a transport route for rice-producing areas in Cross River, Benue, and Ebonyi States.” Highlighting the broader economic vision behind the President’s infrastructure agenda, Umahi said the four legacy projects of the Tinubu administration are far more than roads. “As I have always said, the four legacy projects of Mr. President are not merely road construction projects; they are investments.” Drawing comparisons with advanced economies, he explained that infrastructure investment remains one of the most effective tools for stimulating economic growth. “Infrastructure investment is critical. In countries such as the United States, whenever there is an economic downturn, governments invest heavily in roads and bridges because such investments stimulate growth across other sectors of the economy. That is exactly what the President is doing.” He further pointed to visible projects already completed or nearing completion across Ebonyi and neighbouring states, including major bridges, flyovers, dual carriageways and the Dangote Tax Credit Road Project. “We are grateful to the President and pleased with the work being done by our Governor.” Reaffirming the Southeast’s support for President Tinubu, Umahi said the region now sees clear evidence of inclusion in federal infrastructure investments. “The South-East has been included. Inclusiveness, fairness and equity are what we have always sought, and today we can point to tangible evidence of that inclusion.” The Minister also noted that having a Minister of Works from the Southeast has helped ensure the region’s needs receive the attention they deserve. “Without a Minister of Works from the South-East, we might not have secured all that has been achieved.” He added: “We can proudly say that while we may not be the first beneficiaries of federal road investments, we are certainly no longer the last.” Providing updates on President Tinubu’s four signature legacy projects, Umahi highlighted progress on the Lagos-Calabar Coastal Highway, the Sokoto-Badagry Super Highway, the Calabar-Ebonyi-Benue-Kogi-Nasarawa-Abuja Corridor and other strategic national routes. According to him, the administration’s infrastructure programme is designed to create jobs, support agriculture, expand regional trade, attract industries and unlock new economic opportunities nationwide. “The four legacy projects are investments designed to transform the Nigerian economy.” He explained that plans along the corridors include dams, irrigation systems, power infrastructure, agricultural settlements, housing developments, factories, hotels and renewable energy facilities. “The benefits are extensive and include both direct and indirect employment opportunities for Nigerians.” The Minister ended with a strong endorsement of President Tinubu’s leadership. “President Bola Ahmed Tinubu, God brought you. God will continue to guide and preserve you. We stand with you for the years ahead.” Addressing contractors handling federal projects in the state, Umahi reiterated the Federal Government’s commitment to quality and durability. “The moment you do not execute the work properly, it will be obvious. If you do it well, it will reward you. The method is the same, the principle is the same, and the quality is the same. We are using Grade 40 concrete.” He revealed that the 51-kilometre Okposi-Ohaozara-Ukawu-Cross River road project, valued at ₦53 billion, is nearing completion, with one section already over 90 percent completed and another at about 60 percent completion. The Minister further disclosed that the Federal Government has included the extension of the road to Akam in the 2026 budget, where the newly approved South-East Army Depot is located. He added that additional contractors are already working along the Enugu axis and that a new flyover has also been planned at Okposi to improve traffic flow and enhance connectivity in the area.
WORKS MINISTER,SEN. UMAHI REPRIMANDS CCECC NIGERIA LIMITED OVER POOR CONSTRUCTION METHODOLOGY ON ABA BOUND OF ENUGU-PORT HARCOURT EXPRESSWAY, DESCOPES PORT HARCOURT BOUND,ISSUES 14 DAYS TERMINATION NOTICE FOR SUB-STANDARD PERFORMANCE In his avowed determination to entrench the new construction codes and regulations in the method statement of construction works under the Federal Ministry of Works, the Honourable Minister of Works, His Excellency, Sen Engr. Nweze David Umahi,CON, has reprimanded the poor construction methodology deployed by China Civil Engineering Construction Company Limited on the rehabilitation works on the Aba bound of the Rehabilitation of Enugu-Port Harcourt Expressway, contract No. 6252. The Honourable Minister, who was on a routine supervision of ongoing road projects within South South and South East on Sunday 19th October 2025, expressed displeasure over the recalcitrance of the contractor in complying with the new construction codes and regulations which are aimed at building enduring road infrastructure for the nation. Speaking during the inspection visit, the Honourable Minister decried the state of the 43-km Aba-Port Harcourt inherited ongoing project handled by CCECC, which he said was on the verge of total collapse. He directed that a 14-day notice of termination be issued to the contractor, having regard to the various warning letters issued to the contractor over their poor construction performance on the said job. He further directed that the Port Harcourt bound of the project be descoped and reawarded to a competent contractor. "If you get to Port Harcourt end, which they did about two years or thereabout, the entire road has almost totally failed. We have been writing them to maintain this road. They have refused, and so I have to take responsibility and take decision. Number one, the Port Harcourt bound is descoped, no longer going to be done by CCECC.I will direct the Ministry of Works to scout out for very qualified indigenous contractors to handle the Port Harcourt bound. *They should be the contractor that will start work immediately while we sort out for funds for them._Number two, for the site handled by CCECC, they should issue them 14 days notice of termination of the job. And I want this directive to go very wide. After 14 days, they fail to mill out the binder and replace it properly,the job will be terminated; they have to initiate it; they have to commit to doing that. Even if they are going to do it during the dry season, they have to maintain the ones that they have done and they put in writing that they're going to mill out the binder at their own cost, and then be able to put a new binder, which we have paid for. He reiterated that putting binder for a stretch of the project without putting wearing is unacceptable. On another development, the Hounourable Minister has commended the quality of work on the Rehabilitation and Reconstruction of Enugu-Port Harcourt Dual Carriageway, Section II - Umuahia Tower-Aba Rail/ Road crossing in Abia State, Contract No. 6209 handled by M/S Arab Contractors O. A. O Nigeria Limited. The 56-km inherited ongoing project was noted to have reached 85% completion. "They are one of our best, the first five. Even we want them to maintain from Aba to Umuahia, the completed section. So they're working very hard. The controller is also doing very well. I wish the controller to visit all the projects of the Federal Government in Abia State. He should be able to visit all the projects in Abia State at least once a week, so that if there is a problem of impending danger, impending of problem of cost, you let us know. The Honourable Minister noted the terrible situation of inherited road projects nationwide, which are all receiving priority intervention by the Renewed Hope administration of the President of Nigeria,His Excellency, Bola Ahmed Tinubu GCFR He thanked Mr. President for the encouragement given to the Federal Ministry of Works to turn around the road development trajectory of Nigeria. _"In Nigeria, all the roads became a priority because of the terrible situation of the roads that the President inherited. But he's doing his best. And we are also working with him to offer our best in the country. We feel so bad when our people can't move from one point to the other all over the country. I feel so sad. That is usually my lowest moment. But, I'm still encouraged with the support the president is giving on roads and bridges because that is the basis of economic activities, and I think that we are very lucky to have him because the economy is breaking now. We are the third largest growing economy in the whole world, so we will get there" Hon. Barr. Orji Uchenna Orji Special Adviser ( Media) to the Honourable Minister of Works 20th October 2025 ...
Umahi Inspects Mararaba–Keffi Carriageway, Keffi Flyover Project, Visits Keffi-Nasarawan Toto–Abaji Road The Honourable Minister of Works, Sen. (Engr.) David Umahi, CON, FNSE, FNATE led a high-powered delegation from the Ministry on an inspection tour of key road projects in Nasarawa State. At the site of the Reconstruction and Expansion of Mararraba-Keffi Dual Carriageway, the Minister expressed serious concerns about the pace of work and lack of adherence to engineering specifications. He informed the contractor, China Harbour Engineering Company that after several warnings, the Ministry is left with no choice but to revoke the contract for the Abuja-bound carriageway. He further directed that it should be awarded to a local contractor with a proven track record, who will be mobilised to complete the concrete shoulders and other pending works. The slow pace of construction had been causing considerable hardship for road users and residents along the corridor. The Minister was accompanied by the Minister of State for Works, Bello Muhammad Goronyo, Esq, Directors and other staff of the Ministry, representatives of the construction firms handling the various projects, and was met at the Keffi Flyover by the Governor of Nasarawa State, His Excellency, Engr. Abdullahi Sule, Sen. Ahmed Wadata, officials of the State Government, and other stakeholders. Engr. Umahi emphasised that the Federal Government is committed to delivering high-quality and durable road infrastructure, meeting global engineering standards and capable of serving Nigerians for decades. “We cannot continue to tolerate uncooperative contractors, who delay projects and ignore directives,” he declares. The Minister reiterated his faith in Nigerian Engineers and contractors, guaranteeing that they would deliver quality jobs comparable to international standards, when given the opportunity. He also warned that any contractor who fails to meet deadlines or flouts directives would have their contracts terminated. Engr. Umahi cautioned that “If by the 15th of December, you do not finish the scope of work, I will terminate the whole contract. We must begin to trust our local contractors. This is about discipline, quality, and integrity,” he stressed. He went further to say that “when we came on board, we reviewed the method statement for this project because we could not accept a design that would destroy an already consolidated subgrade,” Umahi explained. “We changed the design to include 20 cm of concrete on the inner shoulder and reinforced the stone base with 3.5% cement content. The sections already completed are excellent and will last for a minimum of 50 years.” The Minister of State for Works, Bello Muhammad Goronyo, Esq, also admonished contractors to show greater seriousness and commitment to the timely completion of projects. He restated that the present administration is determined to deliver quality infrastructure that will stand the test of time, as well as improve the quality of life of Nigerians. Goronyo added that we must all take our responsibilities seriously. “Contractors must adhere strictly to specifications and timelines, as the Ministry will not compromise on quality and accountability,” the Minister disclosed. The Director, Highways, Construction and Rehabilitation, Engr. Clement Ogbuagu reported that about 50% of the project has been completed and assured that the first phase will be delivered by December 15, 2025. At the site of the Emergency Repairs of the Damaged Keffi Flyover, the Minister, accompanied by the Nasarawa State Governor, said that “two months ago, a tragic accident damaged part of this flyover, leading to loss of lives. We reported it to Mr. President, who immediately approved funds for its repairs.” “Today, we can see the quality of work being done. They are recasting the entire slab, not just the affected part at a very conservative cost of ₦1.5 billion,” he added. On the soon-to-be-awarded rescoped Keffi-Nasarawan Toto-Abaji Road, the Minister informed the Governor and his entourage that the original contract sum of ₦73 billion covered an initial 43.65 km stretch. However, the initial scope has now been reviewed and extended to 137 km, reaching Abaji town in the FCT, following the directive of President Bola Ahmed Tinubu, GCFR, under a special funding arrangement. In his remarks, His Excellency, Engr. Abdullahi Sule commended President Tinubu and the Minister of Works for their interventions in the State, especially the Keffi Flyover, which was recently damaged by an overloaded truck. The Governor further noted that the Keffi–Nasarawan Toto-Abaji road is crucial to the economic development of both Nasarawa State and the Federal Capital Territory, as it serves as a major gateway for goods, services, and people. It also serves the biggest Lithium Factory in Africa, recently commissioned by Mr. President. Senator Wadada, representing Nasarawa West and other stakeholders commended the Minister for his dedication, describing him as an “uncommon performer,” whose hands-on approach reflects the Renewed Hope Agenda of President Tinubu. They also applauded the President for being “a leader for all.” Engr. Umahi reaffirmed that all ongoing Federal projects will now adopt the revised engineering method statement, which emphasises, complete milling of old pavement, reinforcement of subgrade with stone base and cement, 20 cm concrete shoulders, and proper drainage and slope control. He also stressed that these specifications are designed to guarantee a minimum lifespan of 50 years for the reconstructed roads. “No contractor, no matter how connected, will be allowed to compromise on quality. Mr. President has done his part by approving funding; it is now our duty to ensure delivery,” the Minister emphasised. Mohammed A. Ahmed, Director, Press and Public Relations. 12th October 2025. ...
OUSTANDING WORKS ON ABUJA-KADUNA-ZARIA-KANO ROAD PROJECT GET EXPEDITIOUS DELIVERY BOOST, AS WORKS MINISTER, SEN DAVID UMAHI AND KADUNA STATE GOVERNOR,SEN. UBA SANI MEET ON MODALITIES TO FASTRACK DELIVERY OF PROJECT. In the commitment of the Renewed Hope administration towards achieving timeous completion of the outstanding works on Abuja-Kaduna-Zaria-Kano road project, handled by Messrs Infiouest International Limited, the Hoonourable Minister of Works, His Excellency, Sen. Engr. Nweze David Umahi CON has directed the contractor to fastrack the delivery of the two sections of the road project particularly by increasing the number of work zones between Jere and kaduna in Kaduna State and ensuring that the project is delivered in record time. The Honourable Minister of Works gave this directive after a meeting he had with the Governor of Kaduna State, His Excellency, Sen. Uba Sani CON together with the contractor handling the project, held at the Honourable Minister’s office, Federal Ministry of Works, Mabushi, Abuja on 10th October, 2025. Speaking on the importance and priority accorded to the project by the President of the Federal Republic of Nigeria, His Excellency, Bola Ahmed Tinubu GCFR, the Hounourable Minister stated; “We have been monitoring this project almost every week, and so we insisted that we must do a meeting with the MD of Infiouest who has the contract of these sections, lot 1, which is N252,000,000,000.00 (Two Hundred and Fifty Two Billion Naira), and lot 2 which is basically in Kaduna, 82 kilometres by 2 that is 164 kilometres costing Federal Government N502,000,000,000.00 (Five Hundred and Two Billion Naira), so altogether to complete all the sections from Abuja down to Kaduna, down Kano is costing the Federal Government N754,000,000,000.00 (Seven Hundred and Fifty Four Billion). Lot 1 is 118 kilometres, costing N252,000,000,000.00 (Two Hundred and Fifty Two Billion Naira), and lot 2 is 164 kilometres, costing N502,000,000,000.00 (Five Hundred and Two Billion)”. He directed the contractor, Infiouest, to deploy on 4 sections and ensure steady work progress, and the Engineer Representative to relocate to Kaduna and monitor strictly the progress of the project and feed him back on daily basis. He assured the Governor that the progress and quality of work would be tracked with a view to achieving delivery in record time. " I want to assure you that the President is very highly concerned to get this project done. But the quality of using the same standard of coastal highway is something that our brothers and sisters in the North will never forget President Bola Ahmed Tinubu for his love and commitment towards the development of every part of this country ." Also, speaking on the outcome of the meeting, the Governor of Kaduna State expressed satisfaction with the outcome of the meeting and the quality of the job being done on the project. He said that he had no doubt that in the next two weeks, the contractor should be able to record commendable milestones given the quality of the meeting held with the Honourable Minister of Works and the contractor handling the job.He further stated that the road is a very important transport corridor that connects not only the economic corridors of the North West but also that of the North Central and the North East " What is more important for us here is for you to understand that Abuja, Kaduna, Kano road connects about 12 States. States from North West, as well as some States from North Central and North East. So it is a very important road that I believe that by the time you complete this project, many people, apart from Kaduna, will be very happy." He commended the professionalism, passion, and innovation brought to bare by the Honourable Minister of Works, whom he described as a rare gem in public service delivery." We are proud to have a Minister of the caliber of Engr. David Umahi, who is of very top profession. I am surprised, when I came here he had to break down the entire project ( off hand) from the size of the project to the level of the project as well as the quality of what is going on there, and I can say that if we have a lot of Honourable Ministers like him in Nigeria,we have to go to sleep without having any problems " In the response of the contractor handling the project, the Managing Director of Infiouest International Limited, Mr. Joseph Abou Jaounde assured of keeping to the directive of the Honourable Minister. “ I am here to assure you, even though we have some little challenges in Kaduna, but from now to 2 weeks, we are going to have a visit a site and to make sure that this portion of the road will be joined with Zuba to Kaduna, and all the sections will be joined together to make sure that the work will be done on time in the right way and quality required ”. This collaborative support and encouragement from the Governor of Kaduna State is made possible because of his interest to tap into the massive infrastructural development programmes of the federal government across the Geo-Political Zones of Nigeria. He is a visionary leader and development advocate who is widely recognized for his contributions to democracy, governance, and social transformation. He is a product of Nigeria’s diverse educational system, a financial guru, business administrator, and engineer in thought. He played a frontline role in the struggle against the military rule in Nigeria. He was a courageous pro-democracy activist, organizing and mobilizing citizens in Northern Nigeria against military dictatorship. Today, he is on the saddle as the Governor of Kaduna State and he is one of the serving Governors in Nigeria who have shown untiring determination to right the wrong in the socio-economic conditions of their people and he is achieving progressive and exponential result given the unprecedented wave of support and leverage provided by the Renewed Hope administration of President Tinubu to the sub-national governments. Hon. Barr. Orji Uchenna Orji Special Adviser (Media) to the Honourable Minister of Works. ...
Road Commissioning: FG - financed Road linking Ekiti -Osun State opens, speedy Commercial and Transport activities expected
The Federal Government -financed road linking Ekiti -Osun State has been commissioned, the road is expected to boost both commercial, social and developmental activities across the two states.
The Efon Alaaye -Erinmo-Iwaraja Road links the three towns of Efon Alaaye in Ekiti State , Erinmo and Iwaraja in Osun State.
The road linking the two states was commissioned and handed over to the states in Efon Alaaye Ekiti State amid hopes that the new infrastructure will help reduce road fatalities, ease mobility and spur trade within the two states as well as with their neighbouring states.
President Muhammadu Buhari commissioned the road on Thursday, June 16, 2022 . The event was attended by government officials , transport operators, members of parliament and traditional chiefs draped in colourful regalia.
*President Buhari who was represented by the Minister of Industry, Trade and Investment, Otunba Adeniyi Adebayo said, "As you can all see, we are handing over today a 22 kilometre Road, which links the three towns of Efon Alaaye in Ekiti State and Erinmo and Iwaraja in Osun State."
Buhari remarked " By linking Ekiti and Osun State together, this road becomes a critical component of our national road network.''
President Buhari further remarked, " This road is also a statement of economic efficiency and ease of doing business. This is because the travel time of averagely One hour before construction has now been reduced to 20minutes with the completion of the road.''
The Representative of the Minister of Works and Housing , the Zonal Director South West in the Ministry, Engr. Ademola Kuti remarked, "The other handing over formalities that will follow these formalities which is flagged off today in Ekiti will also be in : Delta State for Isoko Ring Road Section II covering Aviara -Uzere, Jigawa State for Phase II of Hadejia - Nguru covering Kirikasama -Nguru, Gombe State for Phase II of the Gombe -Numan -Yola Road covering Gombe- Kaltungo , Yobe State for Section II and Phase I of the Nguru -Gashua -Bayamari Road covering Gashua to Bayamari ; Section I, Phase II covering Nguru to Gashua and Nasarawa State for Lafia-Obi-Awe -Tunga Road."
Fashola continued, "These projects represent major investment in road transport infrastructure, which is a commitment of the Buhari administration as a driver for economic growth and prosperity."
Earlier in his welcome address, the Permanent Secretary Federal Ministry of Works and Housing, Mr.Bashir Nura Alkali who was represented by the Controller of Works Ekiti State, Engr.Ishaq Lawal said, "As part of President Muhammadu Buhari’s developmental agenda of addressing road infrastructural development across the length and breadth of Nigeria, the Federal Government as a policy direction has focused on the completion of several on-going projects to stimulate economic development, job creation and promoting local content. The focus is to link the major arterial roads to refineries, ports, tertiary institutions and high volume commercial centres with a view to reducing travel times, vehicle maintenance costs, safety and security of commuters etc."
The Deputy Governor of Ekiti State Otunba Bisi Egbeyemi who represented the Governor of Ekiti State, Dr.John Kayode Fayemi said, " We thank God that the job has been completed after 40years . We thank Buhari for attending to the calls of the people and the contractor has done a good job."
The Senator representing Ekiti Central Senatorial District, Senator Michael Opeyemi Bamidele remarked " I will say on behalf of the Senate Committee on Works that the Contractor has passed oversight test and the contractor must also ensure that all safety measures on the road including adequate road signage and lane markings should be engraved on the road. I congratulate Federal Government and those involved in the project."
The Chairman of Efon Local Government Area Ekiti State, Engineer Bode Adetunji expressed joy over the completed and commissioned road. He remarked, " Efon is a town for over forty years that has no outlet, but now we have a road linking us to the outside world. We thank the contractor for a good job , Minister of Works and Housing and President Buhari for the project."
His Royal Highness Obalufon Alayemore , Oba Dr. Emmanuel Adesanya Aladejare Agunsoye II , the Alaaye of Efon Alaaye said, "Onbehalf of the community and the people involved in the road rehabilitation, I say thank you to the Federal Government. We want the Government to continue to maintain the road so that we can enjoy the road for a long time."
His Royal Highness Awaraja of Iwaraja Ijesa Oba Sunday Ibironke , Samoyekon I remarked, " I just want to commend the Controller and the Minister , the job is wonderful and good. "
The Managing Director of Kopek Construction Limited, Engr Issam Feghali that handled the project commented, "There was no road in Efon Alaaye before the construction started, moreso the topography but we have achieved alot . We appreciate the efforts of the people for their cooperation and better funding from Federal Ministry of Works and Housing under H.E Babatunde Raji Fashola, SAN."
The Head of Market Association in Efon Alaaye, Chief ( Mrs). Gbadamosi Olayemi, said, " We are happy with the road , goods and people can move into Efon, with the road we can now get to Ilesha and Ife in no time."
The Unit Chairman Efon Alaaye Motor Transport Union , Emmanuel Sere Ogun have this to say, " The road has become the fastest route for commuters and we don't spend much money on vehicle repairs anymore."
Senior Motor Mechanic in the area ,Mr. Adedeji Adewale expressed his satisfaction with the project, " The beauty and aesthetics of the town has been greatly improved with the new road and the harrowing of 15years going through rough road is over."
One of the leading farmers in Efon Alaaye, Timothy Agbalajobi said, " We are happy with the handing over , God bless Fashola and Federal Government. We no longer have problems moving our produce from farms to town. Issues of breakdown of vehicles with our produce getting delayed is over."
WELCOME ADDRESS BY THE PERMANENT SECRETARY, FEDERAL MINISTRY OF WORKS AND HOUSING, BASHIR NURA ALKALI, FCA, FCTI AT THE COMMISSIONING OF ISOKO RING ROAD IN DELTA STATE ON TUESDAY, 21st JUNE, 2022.
PROTOCOLS
It is my great pleasure to welcome you all to this significant event in the affairs of our National life. I welcome all the eminent and distinguished invited guests to the occasion of the commissioning of the second phase of the completed roads across the country.
2. On behalf of the Honourable Minister Babatunde Raji Fashola SAN, Directors and Head of Units, Federal Ministry of Works & Housing, I welcome all distinguished invited Guests, the Royal Fathers and the entire people of Delta State to this event.
3. As part of President Muhammadu Buhari’s developmental agenda of addressing road infrastructural development across the length and breadth of Nigeria, the Federal Government as a policy direction focused on the completion of several on-going projects to stimulate economic development, job creation and promoting local content. The focus is to link the major arterial roads to Refineries, Ports, tertiary institutions and high volume commercial centres with a view to reducing travel times, vehicle maintenance costs, safety and security of commuters etc.
4. The Ministry has successfully completed several roads and maintained several bridges to ensure that road users have a rewarding road travel experience. Several other roads and bridges are at various stages of completion such as the 2nd Niger Bridge and its approach road, Dualization of Abuja-Kaduna-Kano, Loko-Oweto Bridge linking Nasarawa to Benue States, Dualization of Enugu-Portharcourt Expressway, Bodo-Bonny Brigde, Lagos-Ibadan Dualization project, to mention just a few.
5. We have now entered the season of completion and handover of several roads and bridges projects across the country. Recently, 5-roads were commissioned by Mr. President who was represented by the Cabinet Ministers from the states where the projects were sited such as:
Commissioning of Sokoto-Tambuwal-Jega-Kotangora-Makere Road, Phases I&II in Kebbi State;
Vandeikya-Obudu Cattle Ranch Road Phases I&II in Benue State;
Nenwe-Oduma Road Sections I&II in Enugu and Ebonyi States;
Kano-Maiduguri Section III (Azare-Potiskum) in Bauchi/Yobe States; and
Kano-Maiduguri Road Section II Shuwarin-Azare, with spur from Dutse to Kwanar Huguma in Jigawa/Bauchi States.
6. In this phase of the commissioning, Mr. President approved the commissioning of the following roads:
Rehabilitation of Efon Alaaye-Erinmo-Iwaraja Road In Ekiti/Osun States;
Isoko Ring Road in Delta State;
Rehabilitation of Hadeija-Nguru Road, Phase II CH 40+000-CH 73+150 Kirikasama-Nguru in Jigawa State;
Completion of Gombe-Numan-Yola Road Phase II (Gombe-Kaltungo) in Gombe State;
Construction of Nguru-Gashua-Bayamari Road Section II, Phase I, (Gashua-Bayamari), Yobe State;
Rehabilitation of Nguru-Gashua-Bayamari Road Section I (Nguru-Gashua) Phase II in Yobe State;
Rehabilitation of Lafia-Obi-Awe-Tunga Road in Nasarawa State.
7. As we complete the commissioning of this road here in Delta State, the train will move to Jigawa State, Nasarawa State and on to the others.
8. Our joy is that Nigerians are benefitting from the fruits of democracy and the promises made by the present Administration. These projects have created direct and indirect jobs as well as provided socio-economic benefits that the magnitude of such projects carries with it.
9. At this juncture, I welcome you all once again to the commissioning ceremony of this laudable road project in Delta State.
Thank you and God bless you.
DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE
DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE
MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1
MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1