Federal Ministry of Works (FMW)
... building the backbone for Development ...
Follow Us:
Welcome To Federal Ministry Of Works.
Minister Federal Ministry Of Works Engr. David Umahi.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Sep
21
2025

LATEST PRESS

Umahi Inspects Sections One and Two of Abuja–Kaduna–Kano Road Project

The Honourable Minister of Works, Senator David Umahi, CON, FNSE, FNATE, has carried out an inspection of Sections One and Two of the Abuja–Kaduna–Kano Road project, reaffirming the Federal Government’s commitment to delivering durable infrastructure to Nigerians.

Speaking during the inspection today 20th September, 2025.
He added that the quality of work so far is commendable. We thank President Bola Ahmed Tinubu for his unwavering support and commitment to this project. By God’s grace, we will ensure timely delivery for the benefit of Nigerians,” Senator Umahi stated.

The Minister has reaffirmed the commitment of the administration of President Bola Ahmed Tinubu GCFR, to delivering durable road infrastructure that will stand the test of time. We are constructing roads that will last for 100 years — roads designed with modern engineering standards, durability, and sustainability in mind. These projects are for the future of our children and the prosperity of our nation,” the Minister said.

The Honourable Minister of State for Works, Mohammed Bello Goronyo Esq, state that the Abuja–Kaduna–Kano Road is one of Nigeria’s most strategic transport corridors, linking major cities, facilitating trade, and enhancing the movement of people and goods across the North and beyond. The Federal Ministry of Works reiterates its resolve to deliver a world-class, durable road that will stand the test of time. 

Accompanying the Minister, the Director of Highways, Construction and Rehabilitation, Engr. Clement Ogbuagu, acknowledged that while good progress has been made on Section One, some delays persist, particularly in Section Two where only about 3% completion has been achieved against a 40% target. He emphasized the need for contractors to deploy more equipment to meet delivery timelines.

Engineer Representing Works on the construction of Abuja-Kaduna- Highway, Engr. Chukwuma Kalu disclosed that Section One, which covers 40.5km (dual carriage on concrete pavement), has recorded significant progress. Of the total stretch, 22km have been completed on both sides, with work actively ongoing on other portions. He further noted that the 17.3km Kano section and the 6.63km dual carriage airport access road have both achieved major milestones, with the airport road already completed and awaiting commissioning.

Clement Ezeorah
AD Press
For: Director, Press and Public Relations 
20th September, 2025

Aug
29
2023

No Concrete Layout, No Contract - Umahi Minister of Works, Engineer David Umahi has disclosed that there will be no contract award under his watch for any road unless it is with concrete layout.   The Minister made this disclosure during an inspection tour of Oshodi Oworoshoki - Ojota road on Tuesday 29th August, 2023 as part of his tour of some roads in Lagos and  states within South West  Nigeria.   The Minister who expressed satisfaction with the job done noted that it was about ninety nine percent done except for some finishing touches.   He wondered why some contractors were against the more durable and cost reduction use of Concrete Technology that is the use of cement for road construction despite its advantages over bitumen which is more expensive and less durable, a situation  he attributed to the fact that the bitumen  produced recently are of lesser quality.   The Minister noted that despite the high number of heavy trucks that ply the road it is still without defects adding that if it was an asphalt road it would have started failing and developing faults.   He challenged contractors who are aversed to the construction of concrete roads to come to Oworoshoki road to see an example of its advantage over asphalt.   At the Apongbon bridge, the Minister lamented that some people were trading and selling chemical under it which resulted in the fire outbreak early in the year thereby causing huge damage to the bridge.  He expressed government's determination to rehabilitate it as soon as possible and install solar light.   While at Iponri section of the Eko bridge the Engr. David Umahi called on the Lagos State Government to urge the people using the premises under it to clean the surrounding and make it beautiful and habitable for their use.   At the Porto-Novo Liverpool round- about bridge, the Minister directed the Director, Design and Bridges, Engineer Adesanya Awosanya to send the report on the structural defects on it and other bridges that have similar problems to his office. ...

Aug
29
2023

Works Minister’s Road Inspection - Section 1 of Lagos - Ibadan Expressway Ready Soon- Engr. Umahi. Minister of Works, David Nweze Umahi is excited as he inspected the 98% completion of Section 1 of the crucial Lagos - Ibadan expressway in Lagos today.   He said " we are excited with the speed of work, the problem of interchange in Ogun State will be resolved so that we can finish with the issue of compensation".   While speaking with the contractor he said “In our subsequent work, we shall work on concrete road, and if you have any problem let us know so that we can support you".   Director South West Engr. Adedamola Kuti, earlier said " the main carriage way of section 1 Lagos Ibadan expressway will be completed in September while the Lagos in-bound is completed.   The West Region Manager of Julius Berger Thomas Christol in charge of the contraction of Section 1, said " the last kilometre shall be completed next week ".   At the construction of Eleko - Dangote Refinery concrete pavement road by Dangote Company under the Tax Credit Scheme, the service lane being proposed would be taken to Federal Executive Council for approval.   Umahi said “Solar Light should be incorporated and has to be tolled ".   He said by tolling the road and handing it over to private sector to manage, the lighting and security will be managed from the revenue from tolling alongside the maintenance of the road thereby generating revenue.   In his words “this initiative is good and will add positively to our economy, Mr. President is committed to this facility. ...

Aug
26
2023

FG Reaffirms Commitment to completing Abuja/Kaduna Road. The Minister of Works, Senator David Umahi (CON) has reassured the people of the North and Nigerians of the commitment of the FG to the completion of the Abuja –Kaduna dual carriageway by 2024.   Umahi disclosed this while speaking to journalists during the inspection of the highway as directed by Mr. President who, according to him, is so passionate about the completion of the road as it will alleviate the suffering and travel time of commuters plying the road.   The Minister added that the road is very important to Mr. President and he is committed to finishing it by 2024, adding that he will match his words with action.   Umahi said, "Mr. President is passionate and concerned about finishing this road and many other Federal roads across the Nation and my inspection as directed is to get first-hand information and examine the challenges involved in the construction of the road and other roads to be visited soon”.   The section 1 of the highway which is 165.5km is part of the 375.4-kilometer Abuja-Kaduna –Zaria-Kano project awarded to Messrs. Julius Berger Nigeria Plc. in 2018 by the previous administration but is yet to be complete like other sections of the road due to insecurity and criminal activities.   The Minister who decried any form of wastage of funds or delay during construction work stressed that there should be a meaningful reason for any change in the approved design of a project to take place.   “Speaking further, he said, "I have observed that there is an issue with the design, I'm directing the Director of Geo-Technics Material and Quality Control of the Ministry of Works, he must come and run figures with me with the project Consultant".   "They have to prove to me that the CPR of the sub upgrade now is more than the CPR of the existing sub grade. I don’t believe in it and if that is not the case there shouldn’t be any need to disturb the existing sub grade, we should actually build our pavement on the existing sub grade. We want to see how we can cut down cost".   Umahi emphasized the need to quicken the approval process of payments for contractors and not make  contractors go to site when payments have not been made to them.   “Again, I have asked the Nigeria Sovereign Investment Authority, (NSIA), to run me figures, let me know how much money they want to give in every month for this project because there is a limit you can push the contractor if you don’t have funding for him".   " If you generate certificate and you cannot pay him, you can’t do more, so we are trying to look at it and if we get the figures, we will be able to insist that the contractor should start this road constructions on a number of sections", he further said.   The Minister who acknowledged the central role of security in the progress of any nation has assured Nigerians that this administration will do everything within available means to provide security for lives and properties on the roads.   He promised that efforts will be made to provide solar light on the completed sections of the road for the safety of road users and its environs if the contingency funds are available.   The Minister encouraged the use of concrete road pavement as an alternative to the use of asphalt in road construction describing it as durable and cheaper.   He urged citizens to take responsibility for FG projects in their states by protecting them rather than looting and vandalizing them as government cannot protect them.   The Director Highway Construction and Rehabilitation, Engr. Folorunsho Esan and the Director Highway North Central Engr. Bola Aganaba, all promised to monitor closely from now on the progress of work going on the road and also to meet with the deadline.   Responding, the Project Manager Messrs. Julius Berger Nigeria Ltd, represented by Engr. Dwadowki Finn, he expressed his gratitude to the Minister for his visit and encouragement. He stated that the project is their major project in the country and will continue to do their best to maintain the standard and deliver the project at the scheduled time.   The Minister was accompanied on the inspection by Senators Lawal Usman representative Kaduna Central and Onyekachi Nwaebonyi, representing Ebonyi North. The Federal Controller of Works in Kaduna State, Engr. Ibrahim Mmadu and Eng. Usman Yakubu were also in the entourage.   The Minister also before leaving Kaduna state paid a courtesy visit to the Governor of Kaduna state who was represented by the Deputy Governor of the state. ...

First First First

PUBLIC ANNOUNCEMENT


Jul
16
2024

 


OTHER NEWS

Nov
05
2020

NIHTE Inaugurates its Abuja Chapter

...Members pledged to uphold and defend Memorandum and Articles of Association

The Nigerian Institution of Highway and Transportation Engineers (NIHTE) has inaugurated its Abuja Chapter with the aim of upholding and defending the Memorandum and Articles of the Association.

At the inauguration  and investiture  ceremony of the new members in Abuja on Wednesday 4th November,  2020 the National Chairman of the Association,  Engineer Oludayo Oluyemi, FNSE said that the Abuja Chapter would assist the Government  of the Federal Capital Territory and the nation in formulating good policies in the area  of Highway and Transportation Engineering, pointing out that their professionalism would come to bear in FCT Highway development.

He said, “The city of Abuja is very important in the history of Engineering in Nigeria and more particularly in the roles our members here have played in NSE and the infrastructural development in Nigeria."

Continuing, he said that the investiture of the Chairman for the NIHTE Abuja Chapter and its Executive would drive the affairs of the Chapter for two calendar years.

He therefore charged the newly constituted EXCO to serve the society with all their might and be fair to all in the discharge their duties.

According to him, the NIHTE division since its formation six years ago, had made tremendous achievements. " We are poised in keying into the new strategic plan and vision of the Nigerian Society of Engineers," he said.

Delivering his Vote of Thanks, the newly inaugurated Chairman of the Abuja Chapter, Engineer Musa Saidu, FNSE pledged and sworn on behalf of other members the to uphold and defend the Memorandum and Articles of Association of NIHTE.

He added that they would conduct their engineering practices with discipline, sincerity and fairness as well as to show interest in the affairs and welfare of their fellow engineers and members.

Speeches

Mar
13
2018

Remarks By H.E, Babatunde Raji Fashola, SAN At The 25th Monthly Power Sector Operators Meeting Held In Uyo

I welcome you all once again to our monthly meeting, and I thank our hosts Ibom Power and the Government and people of Akwa Ibom.

I am happy to again chair this month’s meeting because our Power Sector Recovery Programme (PSRP), the set of policies, actions and programmes meant to solve the Power Sector problems, continues to make progress and deliver results.

Over the last one month since our last meeting, I am pleased to report the following progress.

A) Financial: We have secured the World Bank approval for $486 Million TCN transmission expansion funding, while progress is being made with the same bank for the Rural Electrification and Distribution Expansion Funding.

B) Operational: TCN has completed the following sub-station transmission expansion to improve their capacity to supply power to the DisCos : Uyo, Calabar, Keffi, Karu, Abeokuta, Nasarawa to mention a few.

C) Distribution: While it is no longer news that we have reached a 7,000 MW Generation Capacity and have a 5,000 MW Distribution Capacity, what is newsworthy is that in the last month, we have met with Manufacturers Association of Nigeria (MAN), DisCos, and GenCos on how to implement the Eligible Customer Policy and increase connectivity to the 2,000 MW that is available.

The meeting was productive and we are seeing positive responses. Reports reaching me indicate that what is outstanding is an agreement on the tariffs that will be paid by the eligible customer.

In many parts of the country connected to the grid, citizen feedback is positive, even though all the problems are not solved. Citizens acknowledge more power in dry weather, reduced hours of running their generators and reduction in fuel (diesel and petrol) purchase to power generators.

D) Off-Grid Power: In terms of off-grid supply, I am happy to report that citizens are already embracing the mini-grid policy and regulations to provide power for different uses.
    i) In Ogun State, a renewable energy project was completed and commissioned last month.
    ii) In Kano State, I commissioned a 73KW Solar Hybrid System developed by Rumbu Industries to support its mat production in a factory that employs 1,400 people.
    iii) Within the same period in Kano, I inspected the Solar system being deployed in Sabon Gari Market, that has 12,000 shops.  About 3,000 shops have registered, and 486 shops have been connected to cheaper and more efficient solar power. More shops are being wired by 120 technicians employed by the project.
    iv) In Abia State, work has commenced to connect and meter 31,000 shop owners in Ariaria Market to cleaner and more efficient power.
    v) We are moving away from theorizing about power to actual provision of efficient power to support trade and business, especially small and medium enterprises, who are the drivers of our economy.

E) Meter Asset Provider: On the meter supply side, I am happy to announce that NERC has concluded the Regulations that will provide the framework to license a new class of meter asset providers to complement the efforts of DisCos to supply meters to citizens.

Government decision to pursue an out-of-court settlement on a meter contract awarded since 2003, which was held up in Court until 2017, has made available about N39 Billion to kick off this process.

I am aware that Yola DisCo is already positioning to take up 400,000 meters once the contract and process formalities are concluded. I am told that Abuja, Ibadan, Kano, Ikeja and Benin DisCos are also embracing the initiative, which has reserved a 30% local content for the meters to be supplied under the Regulations.

Ladies and Gentlemen, our incremental power initiative is well underway. Some results are manifesting, and the promise of steady power is real. If we persevere, I am certain that we will witness uninterrupted power, which is the final destination of our journey.

But (and this is a big BUT), our journey will not be without difficulties, and some of them are self-made.

Lately, I have read reports that some Generation Companies (GenCos) (not Ibom Power) have gone to court, filing claims against the Government. That is their right and their prerogative. It is better than self-help, and it is consistent with the rule of law, which underpins our democracy.

While they seek refuge in a court of law, they must be ready to face scrutiny in the court of public opinion.

The court of public opinion is a court of conscience and morality. In the court of public opinion, they must be ready to tell the citizens how they felt when other groups went to court to stop the implementation of Tariffs approved by NERC in 2016.

They must explain to this public court whether they went to court before government approved a N701 Billion payment Assurance Guarantee to pay their monthly power bills.

They must disclose to this court that they owed debts, from the pre-Buhari era, because their income had reduced to less than 50%.

They must disclose to this court that they now receive about 80% income, and that this Government is now paying them revenues collected from international customers from the Republics Benin, Niger and Togo, in Dollars, as against the Naira payment they used to receive.

In both courts, they must disclose how they felt when some DisCos went to court to stop the enforcement of Provision of Promissory Notes, which was a condition that denied them access to the CBN NEMSF low interest loans.

They must tell the court of public opinion that the reason for going to court is because Government is making 100% payment to a new GenCo who has a different contract with a Partial Risk Guarantee, which they do not have.

They must also disclose to both courts that they held a meeting with Government and tabled their demands, which Government promised to look into one week before they went to court.

They must, in good conscience, tell the two courts whether one week was enough time, to go to court and whether this action at the time when the sector is making progress does not suggest an intention to blackmail Government and hold the citizens hostage.

Let me say very clearly to all operators that I get reports of many of the clandestine meetings that some of them are holding with a view to disrupt supply for political capital.

I will close by imploring those that are truly ready to run the business they have acquired voluntarily to continue to do so with the assurance of Government support and partnership.

As for those who entered the business without understanding it, please brace up for hard work and help us rebuild this country.

Those who choose to hide temporarily in the courts of law can do so, but the court of public opinion will scrutinize you and its verdict may be very scathing, unkind, and enduring.

I say this because you may not have noticed that Nigerians are increasingly taking their destiny in their hands.

This is the essence of privatization. If you bother to look up and around you, you will see solar panels on rooftops. The mini grid regulations allow them to procure 1MW without license. This is bigger than what many traditional generators supply. There is no law that compels them to take public power.

I am not afraid of the law courts, and will meet you there to vigorously defend our position.

Thank you for listening.

Babatunde Raji Fashola, SAN
Honourable Minister of Power, Works, and Housing

PHOTO NEWS

Jun
02
2025

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

Click To View More Pictures

PHOTO NEWS

Apr
28
2025

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

Click To View More Pictures