


FEDERAL MINISTRY OF WORKS ADOPTS FUNDING PRIORITIZATION FRAMEWORK ON NNPCL INHERITED TAX CREDIT PROJECTS NATIONWIDE. As part of strategic plans towards sustainability in project funding and execution and in pursuance of the directive of the President of the Federal Republic of Nigeria, His Excellency, Bola Ahmed Tinubu, GCFR on strategic and systematic funding of inherited NNPCL funded projects, the Federal Ministry of Works has adopted funding prioritization framework to ensure the continued execution of road projects hitherto funded by Nigerian National Petroleum Company Ltd (NNPCL) under the Road Infrastructure Development and Refurbishment Investment Tax Credit Scheme. The Honourable Minister of Works, His Excellency, Sen. Engr. Nweze David Umahi, CON made this disclosure during his inspection visit to the ongoing dualization of the East-West Road (Section IIIA) from Eleme Junction, Port Harcourt to Onne Junction in Rivers State handled by Messrs RCC Nig Ltd dated 9th September 2025. Speaking during his visit, the Honourable Minister stated that the Federal Ministry of Works had compiled all the NNPCL inherited Tax Credit projects for strategic priority funding, noting that the most critical projects within the national economic corridor would receive precedence in the hierarchy of prioritization. “We are inspecting projects of federal government in Rivers State, and this particular one is the dualization of Eleme Junction to Onne Port Junction by RCC. Recall that one carriageway was completed and commissioned, even though there are a few things we ordered afresh like the retaining wall and hanging drainage. For the second carriageway with some bridges and flyovers, work has started on it. Let me say that this is part of the NNPC Tax Credit that has been stopped in terms of funding by NNPC. But graciously, we have compiled all the NNPC inherited Tax Credit projects, and we presented as Ministry of Works to Mr. President. And Mr. President has graciously directed that none of such works should stop now. However, as Ministry, we are going to do prioritization of the projects and look at the most critical of these projects within the national economic corridor like this one. And we are going to put it forward for immediate funding because the President directed that none of such projects should stop now.” He admonished contractors handling road projects under the Federal Ministry of Works to ensure speed, quality, compliance with specification and sustainability in project delivery and cautioned that the attention of the anti-graft agencies would be called to any case of violation of the regulations or terms and conditions set out under the contract of every project handled by the Federal Ministry of Works. He stated, “I have also noticed in some of the projects in Rivers State, and same with the Six Geo-Political zones, that contractors go ahead to put stone base and put binder course of asphalt, sometimes over 20 kilometres and leave the binder unprotected without putting wearing course. The binder is like a reinforcement to the road architecture. The wearing is the sealant that doesn't allow water to go beyond the surface. And so when you now put stone base, which has dust as designed, and you put binder, which is like a reinforcement, and you see that the composition of the binder asphalt has bigger stones, and it has holes, so the water penetrates. The moment it gets to the stone base, which has some dust, the road fails. It may technically look safe, but with time, it will definitely fail. And we've seen it in a number of roads we inspected. And what I've directed the Controller to do, and it's going to be nationwide, is that when you are putting binder and you have left it for more than two months, we are going to redo the certificate and remove all the binder and remove the stone base.” He directed that henceforth any project below the contract sum of ₦20 Billion would not be given to expatriate firms, and this he said is part of measures to promote the Nigeria First policy of Federal Government of Nigeria. He commended the construction company handling the Eleme - Onne project, Reynolds Construction Company (RCC) for the quality of work so far done and for working on the project despite the fact that NNPCL has stopped funding the project, but frowned at the slow pace of work which they said was affected by the rainy season. He restated that 15th December 2025 remains the agreed deadline for the project’s completion with no extension or Variation of Price (VoP) allowed. “On this project of Eleme Junction, the quality of the work is excellent. The pace of the work is totally not acceptable. And let me make it very, very clear to the contractor that this project can never be reviewed by a kobo. Neither can there be any variation of price or any other claims.” He expressed dismay over the destructive habit of packing heavy duty vehicles on the road by drivers and warned that forthwith punitive measures would be taken against such perpetrators. “Our roads are not designed to carry these heavy trailers that are parking on the road. And the press should help us on that. When I was coming yesterday all the way from Aba to here, I saw that the trailers are taking over the entire roads, putting their waste, destroying the pavements, and so on and so forth. So I'm going to write to our dear Governors to see what they could help us to do about it, and will also complain to the Inspector General of Police. Let us see what we can do about it. Mr. President is doing everything possible to right the wrongs in terms of road construction. We are doing quality roads now that are going to last from 50 to 100 years. But it's being destroyed by ourselves.” Earlier, the Federal Controller of Works in River State, Engr. Enwereama Tarilade (Mrs.) said the contractor handling Eleme- Onne road had completed the 15km Eket bound on the right carriageway and had moved to the left carriageway which is Port Harcourt bound for which 1km stretch had already been done on Continuously Reinforced Concrete Pavement (CRCP). Projects visited by the Honourable Minister include, the rehabilitation of Enugu – Port Harcourt, Abia/Rivers State, contract No: 6252 being handled by China Civil Engineering Construction Company Limited (CCECC), the upgrading of the 15km section of the East-West Road (Section 111A) from Port Harcourt (Eleme Junction) to Onne junction in Rivers State, contract No: 701 being handled by Messrs. RCC Nig. Ltd and multiple sections of the Enugu-Port Harcourt Expressway, including the sections handled by Arab Contractors and China Civil Engineering Construction Company Limited (CCECC).
-PROMOTES NIGERIA FIRST POLICY, SAYS CONTRACTS BELOW ₦20 BILLION TO BE DONE BY INDIGENOUS CONTRACTORS.
Hon. Barr. Orji Uchenna Orji
Special Adviser (Media) to the Honourable Minister of Works Works
Road Infrastructure Revolution Nationwide has Started, Courtesy of the Renewed Hope Administration of Mr President. Read to Know Your Role 1. The attention of the Federal Ministry of Works has been drawn to the concerns of the public on the deplorable situations of some sections of the Federal roads throughout the Federation as reported in many media platforms, especially social media, the front page, pages 4,5,6 and 14 of the publication of Sun Newspaper of 26th November, 2023. Most of the sections of the roads frequently reported but definitely not exhaustive are: the Makurdi-Nsukka 9th Mile Road, East West Road, Lagos-Abeokuta Expressway, Benin bypass road, collapsed bridges of Enugu- Port Harcourt road, collapsed bridges of Shandam-Plateau State, Abuja-Kaduna- Zaria-Kano road and Gombe- Bauchi etc. 2. The President of the Federal Republic of Nigeria, His Excellency, Senator Asiwaju Bola Ahmed Tinubu, GCFR is aware of the state of our road infrastructure which he inherited on the 29th day of May 2023. Without prejudice to all the good efforts of the past administration on road infrastructure development which they tackled within the limit of their resources, the work to be done to change the ugly state of our roads is quite enormous. 3. Mr. President is not complaining of the challenges he inherited in nearly all sectors of the economy, especially as it concerns our road infrastructure, but he is quite courageous as he had promised to tackle the problems head-on which he has started to do not minding the debt burden inherited especially the funding gap of over Six Trillion Naira (₦6T) from most of the inherited on-going road projects. 4. Mr. President has since reeled out plans of commitment, consistence, and innovations towards actualizing a sustainable road infrastructure development throughout the country. He has just approved a 2023 Supplementary budget of Three Hundred Billion Naira (₦300B) for the Ministry of Works comprising of One Hundred Billion Naira (₦100B) for immediate palliative works in 36 States and FCT and Two Hundred Billion Naira (₦200B) for continuation of most of the inherited ongoing projects and very few new but critical road projects. 5. Mr. President has directed that works in those palliative projects must commence before 1st December 2023, while observing all due process. On the sections being frequently complained of by the public in all regions of the North and South of the country, Mr. President has equally isolated them and directed immediate actions on them and indeed work has started on all such roads. The public can crosscheck our claims and report back to us. 6. The engagements of the Federal Ministry of Works will not be limited to these isolated reported cases but shall be holistic in our approach through these approved palliative measures and the interventions of FERMA in all the 36 States and FCT also. 7. The public is hereby requested to assist the Federal Ministry of Works and FERMA by supervising the contractors that will be engaged in these palliative works and indeed all ongoing projects of the Federal Ministry of Works and FERMA. It is the right of every Nigerian to have value for their money deployed to the road infrastructure sector and therefore must show both interest and passion in all the ongoing projects by the Federal Ministry of Works and FERMA, and indeed all projects of the Federal, State and Local governments. All poorly constructed roads should be photographed and reported immediately to the following contacts: 08030986263, 08037086137, or 08106423197; showing the name of the contractor, the location and type of contract and defects observed. The Federal Ministry of Works will document such reports, verify and take effective action to correct such infractions. The Federal Ministry of Works shall also periodically recognize publicly those who made such reports that are genuine in a public engagement forum to be hosted quarterly by the Federal Ministry of Works and will sanction such erring contractors publicly too. 8. THE USE OF ASPHALT AND CONCRETE PAVEMENT IN ROAD INFRASTRUCTURE DEVELOPMENT a. The Federal Ministry of Works is shocked to observe the various acts of darkening counsel without knowledge on the position of the Ministry on the use of asphalt and concrete pavement in the development of our road infrastructure by people who have vowed not to release their hands off the brake of our road infrastructure development just for their selfish gains. b. The Federal Ministry of Works has at no time banned the use of asphalt or directed that concrete pavement shall be the only means of road pavement structure. For the avoidance of doubt, the new policy of the Federal Ministry of Works is simply put as follows: i. contractors for all the ongoing projects are simply requested to have a choice to continue to use asphalt or have their projects redesigned on concrete at no extra cost to government following the underlisted conditions: ii. Use of asphalt: contractors shall stick to only 5% Variation on Price (VOP) in line with the signed contract agreement throughout the period of the project and the signed contract shall not be subject to review especially on bituminous items. iii. The thickness of the asphalt pavement as designed must be strictly adhered to by all such contractors and the design shelf life for the asphalt (at least 15 years) shall be guaranteed by issuing an insurance bond through a reputable insurance company in favour of the Federal Government. This is in line with Article 2 of the signed contract and clause 51 of the general conditions of contract (which is part of the documents forming the signed contract with contractors which authorize the client through the Engineer to change the scope of the work, the quantity of the work, the quality of the work as the client may deem fit at any time etc.) for all the ongoing projects. These directives to the contractors do not in any way violate the Federal Ministry of Works' signed agreement with the contractors. iv. For the use of concrete, contractors must abide by the 5% VOP and 50 years design shelf life using concrete grade 40. c. Those who are complaining and demarketing this policy are simply those who do not wish Nigeria well and they are the same people that use adulterated bitumen in their projects while putting pressure on our Naira through the importation of adulterated bitumen instead of developing our abundant God given bitumen deposits in Ogun State and other parts of Nigeria. Insofar as this new policy has not violated any law, the Federal Ministry of Works is forging ahead with this new policy. As at today, most of the ongoing projects are still ongoing with asphalt pavement in line with this new policy while some are redesigned on concrete pavement, depending on the terrain and with full understanding of the affected contractors of those projects. 9. The Federal Ministry of Works is very concerned with the supervision of our projects and effective 1st of December 2023, there will be a revolution in the ways and methods the Federal Ministry of Works supervises her projects nationwide. All concerned are HEREBY put on NOTICE as the Ministry will not spare anyone found culpable in his or her assignment. 10. The Director of Works of the 36 States and FCT and FERMA have been directed to audit all projects in their States and FCT especially equipment on and off sites with their pictures, personnel of contractors, status of all projects including financial status (contract sum, date of award, period of construction and time table, amount paid, challenges, % of work completion, augmentation of project if any, VOP claims etc). This assignment must be completed before 30th November 2023. Note that this directive was given since the past two months. 11. The Federal Ministry of Works wishes to thank Mr. President for his directive that all inherited projects from the past administration be continued while he makes frantic efforts to source for funds for the completion of these ongoing projects and the critical new ones within his 1st 4 years of his Divine 8 years of purposeful and fruitful divine administration through the power of God who divinely brought him to leadership at this critical moment of our Nation’s history. 12. On the part of the staff of the Federal Ministry of Works, I pledge to strictly and Godly follow the divine Renewed Hope Agenda of Mr. President, and God willing, we shall continue to support Mr. President and deepen the good efforts of Mr. President in all our road infrastructure development. Signed: H. E. Sen. (Engr.) Nweze David Umahi, CON, FNSE, FNATE Hon. Minister. ...
FG is Committed to the Engineering Values in Road Infrastructure Development as Supervision Occupies a Centre Stage in the New Policy of the Federal Ministry of Works The Federal Government under President Asiwaju Bola Ahmed Tinubu, GCFR is committed to outstanding quality, value for money, innovation, responsiveness, fast deliveries and technical expertise in road infrastructure development in Nigeria. This was contained in the message of the Hon. Minister of Works, Sen. Engr. Nweze David Umahi, CON when the national leadership of Nigerian Society of Engineers (NSE) led by its President, Engr. Tasiu Sa'ad Gidari Wudil paid him a courtesy call in his office in Abuja on 23rd November, 2023. The Hon. Minister emphasized the importance attached to quality delivery of construction works by the Renewed Hope administration of Mr. President stressing that the 'business as usual' syndrome in road construction is no longer tenable under the Renewed Hope administration of Mr. President. He reeled out the new policies on road infrastructure to include: • good stabilized and tested subgrade, sub-base course before pavement placement. • expose subgrade, sub-base and base course to 60 days vehicular movement and continuous sheep-foot rolling before pavement placement. • introduction of reinforced concrete road pavement in most roads’ carriageway and shoulders. • continuous maintenance of all roads under construction throughout the life of the project under contract. • effective design of road infrastructure anchored on detailed report of environmental site conditions and geotechnical report. • community relations in terms of keeping roads motorable under the period of the contract. He said that supervision was necessary in the actualization of quality delivery of road construction whether concrete pavement or asphalt, noting that each of the two models has its own attendant conditions. “When you start to compare asphalt and concrete, it is if all things are equal, here all things are not equal, there are many factors why we are talking about concrete”. He noted that the stand of the Ministry is not about comparing asphalt and concrete pavement but that if you are using either of them, there are conditions attached to them. He said there are certain terrains on our roads that make it imperative for concrete pavement to be used." You cannot put asphalt in water but you can put concrete in water”. The Minister explained that the rate of increase in the cost of materials for construction of the two models is alarming and argued that the cost of materials for asphalt is in geometric progression while the cost of materials for concrete pavement is in arithmetic progression. He reiterated that prudence and value for money are the watchwords of the Ministry of Works under him, and this involves getting materials at the minimum purchase price and maximum efficiency and effectiveness of the product. He urged the leadership of Nigerian Society of Engineers to consider retraining of members of the society and enforcement of discipline and strict standards of ethics in the practice of Engineering in Nigeria in the interest of public safety and for the protection of the economic investments. " I went to China, and I saw their roads, there was no evidence of any maintenance in nearly 30 years. And I asked them what the reason is, and they said that if you build a road in China and within your lifetime, the road fails, they will come for test and if there is any evidence of compromise, the person responsible goes to prison for life". The Hon. Minister offered partnership with the NSE in the area of supervision and consultancy. In his mission statement earlier, the President of Nigerian Society of Engineers ( NSE) said the aim of the courtesy call was to seek areas of collaboration with their own and described the Hon. Minister as a round beg in a round hole "Since after your assumption of office, we have been monitoring your progress, and I must tell you we are not surprised, what you did as Governor in Ebonyi State is amazing. We visited you when you were the Governor of Ebonyi State, and I am going to visit your Governor now. I must go because it is like a pilgrimage.... In fact, Your Excellency, we are proud of you." The President said that the Society which is an umbrella organization for Engineering profession in Nigeria is committed to best Engineering practices. He enumerated the achievements of the Society and the prospects of their smart office project, and expressed hope that it would be an innovation hub of the nation. ...
Asphalt Pavement and Concrete Pavement not Compared - Umahi. .....We will Partner with NSE The Minister of Works, Sen. Nweze David Umahi has reiterated the stand of the Ministry on the use of either asphalt or concrete on the construction of federal roads across the nation saying that each one has conditions attached to its usage. He made this assertion when the President of the Nigeria Society of Engineer, Engr. Tasiu Sa’ad Gidari Wudil paid him a courtesy visit in his office in Abuja. Umahi stated that there are many factors why the issue of concrete technology came up and it’s only because all things are not equal and can only be understood by professionals and not by people who have no knowledge about it. “When you start to compare Asphalt and Concrete, it is as if all things are equal, here all things are not equal, because there are many factors why we are emphasizing about the use of concrete, nevertheless, people speak about a profession they have no knowledge about” He said. He noted that the stand of the Ministry is not about comparing asphalt pavement and concrete pavement but that if you are using either of them, there are certain conditions according to the terrains in different states that will require our roads being built with concrete as well as that concrete must be used as pavement. “We are not just comparing asphalt and concrete, no, that is not what we are doing, first of all, for the use of asphalt, these are the conditions, also for the use of concrete, these are the conditions, but there are certain terrain in states that we stressed must use concrete, we cannot change that. You cannot put asphalt in water, but you can put concrete into water” he said. The Minister explained that the rate at which the prices of these two products fluctuates is alarming and that increment in asphalt is Geometric while that of concrete is in Arithmetic progression noting that the FG is the one funding these huge projects and must tread with caution taking into consideration the budgetary allocation of the Ministry of Works. Umahi expressed his worries saying that the greatest challenge experienced in road construction is the problem of supervision caused by lack of commitment by not putting professional ethics over and above chasing of money but that the Ministry is committed to providing adequate supervision to all road constructions across the 36 states and the FCT. "If we are committed to public things, God will give you new ideas, if you are not committed to public things, you will not get new ideas “he said. The Minister declared that the Ministry will partner with the Nigeria Society of Engineers in the supervision of all road projects across the country and encouraged NSE to improve on the professionalism by opening a training school, both in the North and in the South one each, while he pledged his support. “We are going to partner with NSE in the supervision of all road projects and will also emphasis the need for retraining schools across states. Engineering is wide, if you are a professional engineer, you will not have problem with professional ethics” he said. Umahi maintained that the first job of Nigeria Society of Engineer is to bring discipline among members by setting standard for membership in the sense that if any action against the profession is committed, one can be disrobed noting that everyone cannot be an engineer. “The first job of NSE is to bring discipline, you have to bring us under your leadership so if you hear that a member has committed fraud, you can disrobe him, and it is not everyone that will answer the name -Engineer” he said. ...
FG Hands Over 2.5 Kilometres Internal Roads At UMTH
A total of 2.5 kilometres internal roads rehabilitated at the University of Maiduguri Teaching Hospital (UMTH) by the Federal Ministry of Works and Housing have been handed over by the Honourable Minister of Works and Housing, Mr. Babatunde Fashola, SAN.
Speaking at the event the Chief Medical Director of University of Maiduguri Teaching Hospital, Professor Ahmed Ahidjo commended President Muhammadu Buhari, GCFR and Ministry of Works and Housing for selecting the institute as beneficiary of the intervention programme.
The Minister of Works and Housing Babatunde Raji Fashola SAN, who was represented at the handing over ceremony by the Federal Controller of Works Borno State, Engineer Amos Adams Tongman explained that the intervention by the Federal Government in the development of infrastructure in the tertiary institutions was to boost quality of education, give students a renewed hope and enthusiasm with regards to attending classes because some defective roads have been restored to motorability.
"It is undebatable that the quality of education will be impacted by the quality of infrastructure and the learning environment and those who doubt it should simply listen to some of the feedbacks from the students of the schools where this type of intervention has taken place." he said.
He said that the 2.5 kilometers road network was a laudable project as it would ease movement of both students and staff of the institute within the campus.
The CMD said, "We are fortunate to be able to witness this handing over occasion of roads rehabilitated by the Federal Ministry of Works and Housing. We thank you for your tremendous support in bringing out our landmark project which is being commissioned today. "
The four rehabilitated roads were renamed: Former Ring Road now Babatunde Raji Fashola Road, former Kidney Centre to Engineering Road now Mohammed Bukar Road, former Engineering Junction to Polio Laboratory Road now Professor Jibrin Aminu Road and lastly, School of Nursing Road to Babangida Hussaini Road.
In the words of Professor Ahidjo:’’ These roads are renamed in recognition of the great contributions they have made to the success story we are celebrating”, he said.
On the impact of the road, the President of the Students Union Government (SUG) of the institute, Comrade Hakuri Tamus said the intervention had been a big blessing to the students and management of the institution as well.
"We are grateful to the Minister. We are very happy that the roads have been fixed. Because of the sandy nature of the roads before the intervention students usually fall from bikes. We have recorded a lot of accidents on these roads," he explained.
The Students Union Vice President Comrade Wakhumahysel Peter expressed joy that the project was completed during her time. “We thank President Buhari and the Honourable Minister for making this happen. It will attract more students to the school. It will boost our learning activities as the roads will ease our movement within the school premise,’’ she said.
Speech Delivered By H.E, Babatunde Raji Fashola, SAN At The South West Town Hall Meeting
We must first commend the Hon. Minister of Information and Culture for inaugurating this series of town hall meetings that have been held across Nigeria over the past 3 years.
This in itself is something that has changed in how the FGN communicates with citizens and is quite different from the previous attempts that were targeted to react to crisis or to catch votes at the 11th hour.
I will start my presentation by giving you an overview of what the government of Nigeria is getting done through my ministry (Power, Works and Housing) across the country and then I will come to the specifics as it affects the South West zone.
Of course, I cannot pretend that politics is not in the air, and that elections are a few weeks away. This means that all Nigerians including those of us in the Southwest have to make a choice about who to choose and which party to vote for.
I am mindful of the fact that this is the first time where we have had two major parties manage our affairs.
One for 16 years and another for 3 and a half years thus far.
I am aware that we still want more service from Government, and therefore decision-making will require deep reflection.
Do we go back to those who have served you for 16 years since 1999; or do we move forward with this government that has had only three years and five months to serve us?
So the next election might well be a choice between going back and moving forward.
Let me start by saying that my ministry is responsible for delivering some of Nigeria’s critical infrastructure for transport, electricity and housing.
In 2015 when you elected this government, the budget for these three ministries, left behind by the previous government, was N19 billion for works, N5 Billion for power, and N1.2 Billion for housing making a total of N25.2 Billion.
In the year 2017, the budget for works was N394 Billion; Power was N69.96 Billion and Housing was N64.9 Billion (Total N529 Billion).
In a country where the population is growing faster than the infrastructure, the difference between these budgets must tell you that this government is more serious about providing infrastructure to support you.
So, if you need more roads, more bridges, more power, more housing and the Job opportunities and prosperity that their delivery will bring, your choice in the next election should be easier.
Don’t go back to a budget of N25.2 Billion for Infrastructure , move forward with a budget for Infrastructure which has grown to N543 Billion in 2018.
Another feature of the difference between these two budget sizes is that the last government was spending less on infrastructure for almost one decade when oil prices stayed at $100 per barrel during that decade.
This government is spending more on infrastructure when oil prices largely hovered between $40-$60.
So, in making your choice, please consider who is the better manager. The one who did less with more or the one who did more with less.
Again I urge you to reflect. Do you want to go back to doing less with more, or move forward with doing more with less.
And before I leave this point, let me just inform you that over the last 10 years, from the proceeds of oil, Saudi Arabia spent $420 billion on infrastructure.
But it is not about spending money alone, it is about what we did with it; and what was left behind for us.
What was left behind were massive debts owed to contractors who had not been paid for 3 to 5 years and who had laid off thousands of workers and shut down equipment and plants.
That was one of the reasons why the economy first went into recession, and, I suspect, one of the reasons they quickly conceded defeat.
They also left behind debts owed to state governments who were forced to intervene on federal infrastructure especially roads and bridges. That figure stands at about N450 Billion.
What we spent the money on, was to pay contractors and today I can tell you that there is no state in Nigeria where we are not building at least one Federal Road.
We are constructing houses in 34 states in a pilot scheme to determine affordability and acceptability; and we have 90 transmission projects aimed at improving connectivity between the GenCos and the DisCos who serve you.
Those 90 projects are largely resuscitated because this government has recovered 690 containers of power equipment out of over 800 containers left at the Port for almost a decade because they did not pay contractors, who then could not pay the shippers and warehouse companies.
The Buhari government has paid, the projects are making progress. (Adamawa) (Odogunyan) (Ejigbo) (Apo) (Damaturu) are some of those completed Transmission Sub-stations.
Those of you from Ondo and environs will agree that although the work is not finished, your travel time on the Benin-Ore-Sagamu road has reduced.
Our contractor is on site and has to work while you use the road.
The same is true of the Lagos-Ibadan expressway that connects 3 states of Lagos, Ogun and Oyo; and links to Ondo and beyond.
Those of you who use the road will acknowledge that you no longer have to spend the night on the road.
You can go to Ibadan from Lagos and be sure that you can return on the same day.
Yet we have not finished. Please as you prepare to choose next year, remember those long hours on Benin-Ore, Lagos-Ibadan that sometimes stretched into the Night. Do you want to go back ?
Ask yourself if progress on these roads in 3 years is better than what you have seen over 16 years.
It will help you decide who to choose to ensure that the road is finished, and you can move forward.
Also remember those who presided over the cuts in the budget of these roads in the 2017 budget.
As they plan to frustrate and slow down the Buhari government, the president innovates and finds solutions.
There is now a Presidential Infrastructure Development Fund to ensure that the Second Niger bridge, the Abuja-Kaduna-Kano Road, Lagos-Ibadan expressway and some other projects are not deprived of funding again.
Major roads in the Southwest like the Lagos-Otta-Abeokuta Road, the Ikorodu-Sagamu road, which had been deserted and left to decay, now have contractors at work. Do you want to go back to that ?
The Apapa- TinCan - Mile 2 -Oshodi- Oworonshoki road has been awarded and work should start sometime in November this year as the construction equipment are being readied.
This will give a final solution for the gridlock that was inherited from the last government.
These are some of the examples of what has changed and is changing for the better.
Those who ran it aground for 16 years now say we are not quick enough.
The question you right thinking and well-meaning citizens should ask is which Nation has been rebuilt in 4 years?
It is going to take more than one election cycle to consolidate on the progress I have shared with you; and if you do not choose wisely you can reverse it.
A choice to go back is a choice to reverse this progress and a choice to move forward is a sensible choice to consolidate and progress.
Those same people who caused the problem cannot now be trusted to fix it.
You will hear from them that the country has problems as they try to weaponise our challenges to deceive Nigerians.
The infrastructure decayed under their watch; insurgency and bombings started under their watch; the grand corruption under their watch makes it impossible to identify one item of critical infrastructure that Nigeria can point to in a decade during which oil price averaged over $100 per barrel. (1976; 1980s)
On the housing side, as I said we are in every state including all the states of the South West except Lagos. Each site employs not less than 1,000 people made up of builders, artisans, fabricators, and vendors and we plan to do much more.
Through this infrastructure commitment, the President and the government is driving the economy vehicle in the right direction.
The last quarter report of the National Bureau of Statistics for Q2 of 2018 shows the following rate of growth in sectors affected by my ministry:
Transportation – (Road, rail, water and air) – 21.76%
Construction – 7.66%
Electricity- 7.59%
But it is not just travel time reduction, and economic growth that is impacted, the number of road traffic accidents, injuries and loss of lives are reducing month by month as FRSC figures from June and July 2018 show. While the biggest cause of accidents remains speed violations.
Let me close with some specific comments on power in the South West :- Magboro, Mowe, Ibafo, Ondo (North and South) are communities who were never connected to power supply before.
That story has changed. They are now connected and experiencing power supply. That is change.
This is because we increased generation from 4,000 to 7,000 MW; averaging 1,000 MW per annum; Transmission from 5,000 to 7,000MW averaging 660MW per annum, and distribution from 2,690 MW in May 2015 to 5,222MW in January 2018, averaging 844 MW per annum.
We have not finished and we have not reached everybody yet; but many of you can tell the difference now and attest to the fact that things have changed for the better.
Ask yourself if you use your generator longer today than in 2015 or if you spend less money on diesel today than in 2015, or if you are getting power supply longer today than in 2015.
Please choose next year according to that answer.
Also ask yourself who has done better: 4,000 MW over 16 years at an average 250 MW per annum? Or 3000 MW over 3 years at an average of 1000 MW per annum?
I have addressed the choice before you between going back and moving forward.
Let me end my contribution on another issue that is critical to the decision you have to make about your future.
That issue is TRUST.
Who will you trust to better manage your affairs . The one who did less with more; or the one that is doing more with less.
Without a doubt, we have done more with less time and with less money. That is change and we remain committed to doing more.
Babatunde Raji Fashola, SAN
Honourable Minister of Power, Works and Housing
DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE
DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE
MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1
MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1