Hon. Shehuri Gives Directives on Smooth, Safe Passage
The Minister of State for Power, Works and Housing, Hon. Mustapha Baba Shehuri has directed the Contractor handling rehabilitation works on the 9th Mile - Orokam road in Enugu State to focus more attention on the pothole - riddled sections of the alignment. He gave the directive, while on a working visit to Federal highways projects in Enugu and Anambra States.
2. Speaking with the Project Manager, Messrs RCC (Nigeria) Limited, Engr. Harel Vaknin, at the road rehabilitation site, the Minister directed that further palliative measures should be provided immediately to ensure that the rough portions of the road are completely rehabilitated to ease the sufferings of road users, stressing that the President Muhammadu Buhari's Administration places high premium on providing succour to Nigerians. While commending the Contractor on the pace of work, Hon. Shehuri called for more proactive measures before the rainy season sets in.
3. The Minister also inspected the on going rehabilitation of outstanding section of Onitsha - Enugu Expressway (Amansea - Enugu) in Enugu State, where he assured the Contractor, Messrs RCC (Nigeria) Limited that funds would be made available when the necessary processes are completed.
4.The Minister enjoined the contractor to speed up the tempo of work in order to deliver the projects as at the time due without prejudice to engineering designs and specifications.
5. While briefing the Minister on the two projects, earlier, the Federal Controller of Works, Enugu State, Engr. Femi Oyekanmi stated that remarkable progress has been made on the 9th Mile - Orokam road compared to how it was in December 2018, promising that the Ministerial directive will be carried out to the latter.
THE HON. MINISTER OF WORKS, H.E. SEN. (ENGR.) NWEZE DAVID UMAHI, CON, FNSE, FNATE ENGAGES STAKEHOLDERS IN ONDO STATE ON THE 63-KILOMETRE ALIGNMENT OF THE LAGOS - CALABAR COASTAL HIGHWAY PASSING THROUGH THE STATE, THURSDAY, 31ST OCTOBER, 2024 IN AKURE.
1
PICTURES FROM DAY 2 OF THE 29TH MEETING OF THE NATIONAL COUNCIL ON WORKS
Image 1