Federal Ministry of Works (FMW)
... building the backbone for Development ...
Follow Us:

LATEST PRESS

Sep
21
2023
Inset - R-L: Director Highway South-South, Engr C.A Ogbuagu, The Hon. Minister of Works, H.E. Sen (Engr) David Nweze Umahi, CON during the inspection of the Dualization of East–West Road, Section IV: Eket–Oron Road in Akwa Ibom State on the 20th, September, 2023.

FG Will No Longer Accept Road Contract Certificate for Payment Generated by One Person – Umahi

.....No one will make unnecessary request during road construction – Eleme LGA Chairman.


The Honourable Minister of Works H.E Sen (Engr) David Nweze Umahi has remarked that the Federal Government will no longer accept road contract certificate for payment generated by one person, he made this statement while inspecting some roads within Rivers and Akwa Ibom States on Wednesday.

 

He said “No longer will certificate for payment be generated by one person, contractor must sign it, resident engineer as well. state controllers, regional controllers, and they will all endure inspections are done, state Commissioners of Works shall generate work done, prepare the certificate with calculations and geotechnical reports, sketches and valuation, then they will bring it to me, the moment I see that things are working I will sign within 6hours”.

 

“I have directed that any project that motor users cannot go through the entire length and breadth of the project awarded to a contractor, I will not sign the certificate, contractors must maintain all the roads,  the length and breath within their contract , I am directing the controllers and Directors of the Regions to ensure between Abuja and Port Harcourt they must fix the remedial works within the next 14days” He briefed the press.

 

The Minister, speaking further said “how could a  payment certificate be given for a road that has failed and the contractor is on site and you turn around to blame the leaders, who signs the papers ?, you  sign the paper and originate the certificate but I have directed that enough is enough , they must show me how increase in our contracts come about , anyone can sign a paper for them to pay but as for me I will not sign anything that I don’t know how it came about if you want to do ashphalt continue with it but you must sign a performance bond that the road must not fail within the life time of the project , I want Nigerians to know that overloading is not responsible for failure of the road , most of the contractors have jobs in more than ten locations with two equipment so they cannot cope with the volume of jobs”.

 

The Minister had also   directed that any contractor without COREN Certified Engineer must not be allowed to work, he said any consultant or civil servant that behaved the way they have been behaving their certificate would be withdrawn.

 

Umahi said President Ahmed Bola Tinubu is determined to end the sufferings of the road users in Nigeria, he said “road is everything to this country, road is everything to Commerce, road is everything to Solid Mineral, Medicine, Education, Agriculture and to Food Security".

 

The Honourable Minister was approached by youths of Eleme during his inspection for upgrading of four lanes to six lanes for Eleme junction to Onne junction road projects in Rivers State where he promised them that he would work with the youths to ensure that the road does not remain the same.

 

Earlier the Eleme Local Government Area Chairman, Hon. Obarilomate Ollor who spoke on behalf of the youths said “ I thank the Minister for coming to inspect this road on behalf of Mr President , this bad road has been responsible for the untimely death of so many people and more that ten thousands of vehicles ply this route daily , and from what you have said the youths will cooperate with you to deliver this project and we will not make unnecessary request”.

 

Some of the projects inspected by the Minister in Rivers and Akwa Ibom states included Aba- Port Harcourt road, Bodo Bonny road, Ogoni bridge, Reconstruction of Abak – Ekparakwa –Ette- Ikot Abasi road and the dualization of the East West Road Section four at Eket By Pass.

PHOTO NEWS

Oct
31
2024

THE HON. MINISTER OF WORKS, H.E. SEN. (ENGR.) NWEZE DAVID UMAHI, CON, FNSE, FNATE ENGAGES STAKEHOLDERS IN ONDO STATE ON THE 63-KILOMETRE ALIGNMENT OF THE LAGOS - CALABAR COASTAL HIGHWAY PASSING THROUGH THE STATE, THURSDAY, 31ST OCTOBER, 2024 IN AKURE.

1

Click To View More Pictures

PHOTO NEWS

Mar
05
2024

HON. MINISTER OF WORKS, HIS EXCELLENCY SEN. ENGR NWEZE DAVID UMAHI CON (RIGHT) WITH THE DIRECTOR, INFRASTRUCTURE AND URBAN DEVELOPMENT, MIKE SALAWOU HELD AT THE OFFICE OF THE HONOURABLE MINISTER FEDERAL MINISTRY OF WORKS, THIS 5TH MARCH 2024.

Hon. Minister of Works, His Excellency Sen. Engr Nweze David Umahi CON (Right) with the Director, Infrastructure and Urban Development, Mike Salawou held at the office of the Honourable Minister Federal Ministry of Works, this 5th March 2024.

Click To View More Pictures